{"id":190166,"date":"2024-07-15T16:02:57","date_gmt":"2024-07-15T13:02:57","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=190166"},"modified":"2024-07-15T16:02:57","modified_gmt":"2024-07-15T13:02:57","slug":"cin-kirgizistan-da-400-mw-kapasiteli-gunes-enerjisi-santrali-insa-edecek","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/cin-kirgizistan-da-400-mw-kapasiteli-gunes-enerjisi-santrali-insa-edecek\/","title":{"rendered":"(Turkish) &#8217;\u00c7in&#8217; K\u0131rg\u0131zistan\u2019da 400 MW Kapasiteli G\u00fcne\u015f Enerjisi Santrali \u0130n\u015fa Edecek"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/190166\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2><strong>\u00c7in\u2019in, K\u0131rg\u0131zistan\u2019\u0131n Iss\u0131k G\u00f6l B\u00f6lgesi\u2019nde 400 megavat kapasiteli g\u00fcne\u015f enerji santrali in\u015fa edece\u011fi bildirildi.<\/strong><\/h2>\n<p style=\"text-align: center;\"><img loading=\"lazy\" class=\"aligncenter wp-image-190168\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/07\/cin-kirgizistan-da-400-mw-kapasiteli-gunes-enerjisi-santrali-insa-edecek.jpg\" alt=\"\" width=\"500\" height=\"334\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/07\/cin-kirgizistan-da-400-mw-kapasiteli-gunes-enerjisi-santrali-insa-edecek.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/07\/cin-kirgizistan-da-400-mw-kapasiteli-gunes-enerjisi-santrali-insa-edecek-300x200.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/07\/cin-kirgizistan-da-400-mw-kapasiteli-gunes-enerjisi-santrali-insa-edecek-500x334.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/07\/cin-kirgizistan-da-400-mw-kapasiteli-gunes-enerjisi-santrali-insa-edecek-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/07\/cin-kirgizistan-da-400-mw-kapasiteli-gunes-enerjisi-santrali-insa-edecek-450x300.jpg 450w\" sizes=\"(max-width: 500px) 100vw, 500px\" \/><\/p>\n<p>K\u0131rg\u0131zistan h\u00fck\u00fcmetinden yap\u0131lan a\u00e7\u0131klamaya g\u00f6re, Bakanlar Kurulu Ba\u015fkan\u0131 Ak\u0131lbek Caparov, Iss\u0131k G\u00f6l B\u00f6lgesi\u2019ndeki Bal\u0131k\u00e7\u0131 \u015fehrinde 400 megavat kapasiteli g\u00fcne\u015f enerji santralinin temel atma t\u00f6renine kat\u0131ld\u0131.<\/p>\n<p>T\u00f6rende konu\u015fan Caparov, \u00fclkenin enerji ba\u011f\u0131ms\u0131zl\u0131\u011f\u0131n\u0131 sa\u011flamay\u0131 ama\u00e7lad\u0131klar\u0131n\u0131 belirterek \u00c7in sermayeli \u015firketin g\u00fcne\u015f enerji santralini <strong>1,5 y\u0131lda<\/strong> yakla\u015f\u0131k<strong> 400 milyon dolara<\/strong> kuraca\u011f\u0131n\u0131 s\u00f6yledi.<\/p>\n<p>Caparov, K\u0131rg\u0131zistan\u2019da son 2 y\u0131lda <strong>Kambar-Ata HES-1, Kulanak HES, Bala-Saruu HES ve y\u00fczlerce k\u00fc\u00e7\u00fck hidroelektrik santrali<\/strong> gibi \u00e7ok say\u0131da b\u00fcy\u00fck \u00f6l\u00e7ekli enerji projesinin in\u015fas\u0131na ba\u015fland\u0131\u011f\u0131n\u0131 kaydetti.<\/p>\n<p>T\u00f6rende, \u00c7in\u2019in Bi\u015fkek B\u00fcy\u00fckel\u00e7isi Du Dewen de haz\u0131r bulundu.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. \u00c7in\u2019in, K\u0131rg\u0131zistan\u2019\u0131n Iss\u0131k G\u00f6l B\u00f6lgesi\u2019nde 400 megavat kapasiteli g\u00fcne\u015f enerji santrali in\u015fa edece\u011fi bildirildi. K\u0131rg\u0131zistan h\u00fck\u00fcmetinden yap\u0131lan a\u00e7\u0131klamaya g\u00f6re, Bakanlar Kurulu Ba\u015fkan\u0131 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":190168,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49],"tags":[886,2326,6014,23416,114577,1989],"views":53,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/190166"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=190166"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/190166\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/190168"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=190166"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=190166"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=190166"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}