{"id":189303,"date":"2024-06-13T19:13:09","date_gmt":"2024-06-13T16:13:09","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=189303"},"modified":"2024-06-13T19:13:09","modified_gmt":"2024-06-13T16:13:09","slug":"mayis-2024-sonunda-kurulu-gucun-yuzde-13-6-lik-kismi-14-993-mw-gunes-ten","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/mayis-2024-sonunda-kurulu-gucun-yuzde-13-6-lik-kismi-14-993-mw-gunes-ten\/","title":{"rendered":"(Turkish) May\u0131s 2024 Sonunda Kurulu G\u00fcc\u00fcn %13,6\u2019l\u0131k K\u0131sm\u0131 (14.993 MW) G\u00fcne\u015f&#8217;ten!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/189303\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2><strong>2024 y\u0131l\u0131 Nisan ay\u0131 sonunda 109.192 MW olan toplam kurulu g\u00fc\u00e7 de\u011feri 1.140,69 MW\u2019l\u0131k art\u0131\u015fla 2024 y\u0131l\u0131 May\u0131s ay\u0131 sonunda 110.332 MW olarak kaydedildi. 2024 y\u0131l\u0131 May\u0131s ay\u0131 sonunda olu\u015fan toplam kurulu g\u00fcc\u00fcn %13,6\u2019l\u0131k k\u0131sm\u0131 (14.993 MW) g\u00fcne\u015f enerjisi santralleri taraf\u0131ndan olu\u015fturuldu.<\/strong><\/h2>\n<p><a href=\"https:\/\/www.tenva.org\/aplus-enerji-mayis-2024-analizi\/\" target=\"_blank\" rel=\"noopener\">APLUS Enerji taraf\u0131ndan yap\u0131lan analize g\u00f6re<\/a>, ger\u00e7ekle\u015fen elektrik \u00fcretimi kaynak bak\u0131m\u0131ndan incelendi\u011finde ise, 2024 May\u0131s ay\u0131nda toplam \u00fcretimin %13,2\u2019sinin do\u011fal gaz ve LNG santralleri taraf\u0131ndan ger\u00e7ekle\u015ftirildi\u011fi g\u00f6r\u00fclmektedir. Barajl\u0131 hidroelektrik santraller, ilgili ayda toplam \u00fcretimin %20,6\u2019s\u0131n\u0131 kar\u015f\u0131larken, akarsu tipi hidroelektrik santraller ise %10,0 oran\u0131yla \u00fcretime katk\u0131da bulunmu\u015ftur. \u0130thal k\u00f6m\u00fcr santralleri May\u0131s ay\u0131nda toplam \u00fcretimin %17,0\u2019\u0131n\u0131 kar\u015f\u0131larken, yerli k\u00f6m\u00fcr santralleri ise %13,7 oran\u0131nda katk\u0131 sa\u011flam\u0131\u015ft\u0131r. Yenilenebilir enerji santrallerinden r\u00fczg\u00e2r enerjisi santralleri toplam \u00fcretime %9,2 jeotermal ve g\u00fcne\u015f enerjisi santralleri ise toplam %13,0 oran\u0131nda katk\u0131da bulunmu\u015ftur. Di\u011fer termik santrallerin \u00fcretimdeki pay\u0131 ise %3,2 olarak ger\u00e7ekle\u015fmi\u015ftir.<\/p>\n<p style=\"text-align: center;\"><img loading=\"lazy\" class=\"aligncenter wp-image-189306\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/06\/aplus-enerji-grafik-1200x497-1.jpg\" alt=\"\" width=\"500\" height=\"227\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/06\/aplus-enerji-grafik-1200x497-1.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/06\/aplus-enerji-grafik-1200x497-1-300x136.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/06\/aplus-enerji-grafik-1200x497-1-500x227.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/06\/aplus-enerji-grafik-1200x497-1-80x36.jpg 80w\" sizes=\"(max-width: 500px) 100vw, 500px\" \/><\/p>\n<p>2024 y\u0131l\u0131 May\u0131s ay\u0131 sonunda olu\u015fan toplam kurulu g\u00fcc\u00fcn %22,4\u2019l\u00fck k\u0131sm\u0131 (24.756 MW) do\u011fal gaz ve LNG yak\u0131t tipi santralleri ile kar\u015f\u0131lan\u0131rken, %21,6\u2019l\u0131k k\u0131sm\u0131 (23.855 MW) barajl\u0131 hidrolik santraller taraf\u0131ndan kar\u015f\u0131lanmaktad\u0131r. Bu yak\u0131t tiplerini %10,4\u2019l\u00fck (11.452 MW) oran ile yerli k\u00f6m\u00fcr santralleri ve %9,4\u2019l\u00fck oran (10.374 MW) ile ithal k\u00f6m\u00fcr santralleri izlemektedir. Akarsu tipi hidrolik santraller %7,5\u2019lik bir orana (8.329 MW) sahipken, r\u00fczg\u00e2r santralleri toplam kurulu g\u00fcc\u00fcn %11,1\u2019lik bir k\u0131sm\u0131n\u0131 (12.194 MW) olu\u015fturmaktad\u0131r. Toplam kurulu g\u00fcc\u00fcn %13,6\u2019l\u0131k k\u0131sm\u0131 (14.993 MW) g\u00fcne\u015f enerjisi santralleri, %1,5\u2019lik k\u0131sm\u0131 (1.691 MW) jeotermal enerji santrallerinden olu\u015furken, %2,4\u2019l\u00fck k\u0131sm\u0131 (2.688 MW) ise di\u011fer termik santraller taraf\u0131ndan olu\u015fturulmaktad\u0131r.<\/p>\n<p>Kaynak:\u00a0<a href=\"https:\/\/www.tenva.org\/aplus-enerji-mayis-2024-analizi\/\" target=\"_blank\" rel=\"noopener\">APLUS Enerji \/ TENVA<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. 2024 y\u0131l\u0131 Nisan ay\u0131 sonunda 109.192 MW olan toplam kurulu g\u00fc\u00e7 de\u011feri 1.140,69 MW\u2019l\u0131k art\u0131\u015fla 2024 y\u0131l\u0131 May\u0131s ay\u0131 sonunda 110.332 MW [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":189307,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[35668,2326,1325,1663,842,14609,105],"views":46,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/189303"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=189303"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/189303\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/189307"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=189303"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=189303"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=189303"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}