{"id":189274,"date":"2024-06-13T17:07:29","date_gmt":"2024-06-13T14:07:29","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=189274"},"modified":"2024-06-13T17:07:29","modified_gmt":"2024-06-13T14:07:29","slug":"tredas-kurban-bayrami-tatilinde-kesintisiz-enerji-icin-sahada","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/tredas-kurban-bayrami-tatilinde-kesintisiz-enerji-icin-sahada\/","title":{"rendered":"(Turkish) &#8217;TREDA\u015e&#8217; Kurban Bayram\u0131 Tatilinde Kesintisiz Enerji \u0130\u00e7in Sahada"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/189274\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2>Edirne, Tekirda\u011f ve K\u0131rklareli\u2019nde, 20 bin kilometrekare alanda 1,3 milyondan fazla aboneye elektrik da\u011f\u0131t\u0131m hizmeti sunan Trakya Elektrik Da\u011f\u0131t\u0131m A.\u015e. (TREDA\u015e), hizmet b\u00f6lgesinde enerji s\u0131k\u0131nt\u0131s\u0131 ya\u015fanmamas\u0131 i\u00e7in 9 g\u00fcne uzat\u0131lan Kurban Bayram\u0131 tatili boyunca sahada olacak.<\/h2>\n<p style=\"text-align: center;\"><img loading=\"lazy\" class=\"aligncenter wp-image-189277\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/06\/tredas-kurban-bayrami-tatilinde-kesintisiz-enerji-icin-sahada-1.jpg\" alt=\"\" width=\"500\" height=\"368\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/06\/tredas-kurban-bayrami-tatilinde-kesintisiz-enerji-icin-sahada-1.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/06\/tredas-kurban-bayrami-tatilinde-kesintisiz-enerji-icin-sahada-1-300x221.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/06\/tredas-kurban-bayrami-tatilinde-kesintisiz-enerji-icin-sahada-1-500x368.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/06\/tredas-kurban-bayrami-tatilinde-kesintisiz-enerji-icin-sahada-1-68x50.jpg 68w\" sizes=\"(max-width: 500px) 100vw, 500px\" \/><\/p>\n<p>15-23 Haziran tarihleri aras\u0131nda, ya\u015fanabilecek olas\u0131 ar\u0131zalara h\u0131zla \u00e7\u00f6z\u00fcm \u00fcretmek hedefiyle 467 ar\u0131za onar\u0131m ve bak\u0131m personelini ve 116 arac\u0131 7\/24 sahada bulunduracak olan TREDA\u015e, acil durumlarda kullan\u0131lmak \u00fczere, 51 jenerat\u00f6r, 6 kablo test arac\u0131, 4 \u0130nsans\u0131z Hava Arac\u0131 (\u0130HA) ve 5 mobil trafoyu uygun noktalarda devreye girmeye haz\u0131r halde bekletecek.<\/p>\n<h3><strong>YAPAY ZEKA TREDA\u015e ENERJ\u0130K, TALEPLERE ANLIK YANIT VER\u0130YOR<\/strong><\/h3>\n<p>Kurban Bayram\u0131\u2019nda \u00f6zellikle tatil beldelerindeki n\u00fcfus yo\u011funlu\u011fu nedeniyle artan enerji talebine sorunsuz yan\u0131t vermek amac\u0131yla haz\u0131rl\u0131klar\u0131n\u0131 yapan TREDA\u015e, <strong>\u201cOperasyon Merkezi\u201d<\/strong> ile bayram boyunca elektrik \u015febekelerini uzaktan kontrol ederek sahadaki ekiplerin \u00e7al\u0131\u015fmalar\u0131n\u0131 anl\u0131k takip etmeye devam edecek. Bu sayede herhangi bir ar\u0131za ve kesinti durumunda dakikalar gibi k\u0131sa bir s\u00fcrede olaya m\u00fcdahale edilerek sorunun giderilmesi sa\u011flanacak.<\/p>\n<p>Planl\u0131 kesinti haricinde olas\u0131 ar\u0131za durumlar\u0131nda m\u00fc\u015fteriler i\u00e7in ileti\u015fim kanallar\u0131n\u0131 da g\u00fc\u00e7lendiren TREDA\u015e, <strong>186 \u00c7a\u011fr\u0131 Merkezi, web sitesi ve yapay zek\u00e2 TREDA\u015e Enerjik<\/strong> \u00fczerinden m\u00fc\u015fterilerinin taleplerini anl\u0131k olarak dinleyecek.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Edirne, Tekirda\u011f ve K\u0131rklareli\u2019nde, 20 bin kilometrekare alanda 1,3 milyondan fazla aboneye elektrik da\u011f\u0131t\u0131m hizmeti sunan Trakya Elektrik Da\u011f\u0131t\u0131m A.\u015e. (TREDA\u015e), hizmet [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":189276,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53],"tags":[15016,4546,55744,108919,12370],"views":27,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/189274"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=189274"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/189274\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/189276"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=189274"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=189274"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=189274"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}