{"id":18895,"date":"2013-12-06T13:31:07","date_gmt":"2013-12-06T10:31:07","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=18895"},"modified":"2013-12-06T17:34:22","modified_gmt":"2013-12-06T14:34:22","slug":"vestas-ve-kangal-elektrik-res-turbini-icin-anlasma-imzaladi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/vestas-ve-kangal-elektrik-res-turbini-icin-anlasma-imzaladi\/","title":{"rendered":"(Turkish) Vestas ve Kangal Elektrik RES T\u00fcrbini \u0130\u00e7in Anla\u015fma \u0130mzalad\u0131&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/18895\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Kangal Elektrik \u00dcretim A.\u015e. ile Vestas <a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/12\/vestas-ve-kangal-elektrik-res-turbini-icin-anlasma-imzaladi.jpg\"><img loading=\"lazy\" class=\"alignleft size-medium wp-image-18896\" title=\"vestas-ve-kangal-elektrik-res-turbini-icin-anlasma-imzaladi\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/12\/vestas-ve-kangal-elektrik-res-turbini-icin-anlasma-imzaladi-300x221.jpg\" alt=\"\" width=\"300\" height=\"221\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/12\/vestas-ve-kangal-elektrik-res-turbini-icin-anlasma-imzaladi-300x221.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/12\/vestas-ve-kangal-elektrik-res-turbini-icin-anlasma-imzaladi-67x50.jpg 67w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/12\/vestas-ve-kangal-elektrik-res-turbini-icin-anlasma-imzaladi.jpg 400w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>22 \u00fcnite V100-2.0 MW r\u00fczgar t\u00fcrbinlerinden olu\u015facak r\u00fczgar enerjisi santrali i\u00e7in anla\u015fma imzalad\u0131.<\/strong><\/p>\n<p><strong>SANTRAL\u0130N KURULUMU 2014 YILINDA BA\u015eLAYACAK<\/strong><br \/>\n\u015eirketin ilk r\u00fczgar enerjisi santralinin kurulumu 2014 y\u0131l\u0131n\u0131n ilk \u00e7eyre\u011finde ba\u015flayacak. R\u00fczgar t\u00fcrbini sevk\u0131yat\u0131n\u0131n 2014 y\u0131l\u0131n\u0131n ilk \u00e7eyre\u011finde ger\u00e7ekle\u015ftirilmesi ve ayn\u0131 y\u0131l\u0131n \u00fc\u00e7\u00fcnc\u00fc \u00e7eyre\u011finde de devreye al\u0131nmas\u0131 planlan\u0131yor.<\/p>\n<p>S\u00f6zle\u015fme, r\u00fczgar t\u00fcrbini tedari\u011fi, t\u00fcrbinlerin sahada montaj\u0131n\u0131n yap\u0131larak devreye al\u0131nmas\u0131 ile 8 y\u0131ll\u0131k Active Output Management 4000 (AOM 4000) servis ve emre amadelik hizmetini kaps\u0131yor.<\/p>\n<p>Kaynak: <a href=\"http:\/\/enerjigunlugu.net\/vestas-ve-kangal-elektrik-res-turbini-icin-anlasma_5949.html\" target=\"_blank\">Enerji G\u00fcnl\u00fc\u011f\u00fc<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Kangal Elektrik \u00dcretim A.\u015e. ile Vestas 22 \u00fcnite V100-2.0 MW r\u00fczgar t\u00fcrbinlerinden olu\u015facak r\u00fczgar enerjisi santrali i\u00e7in anla\u015fma imzalad\u0131. SANTRAL\u0130N KURULUMU 2014 YILINDA [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":18896,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,50],"tags":[63,67,1009,165,11018,11019,69,16,11020,4734],"views":1781,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/18895"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=18895"}],"version-history":[{"count":2,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/18895\/revisions"}],"predecessor-version":[{"id":18898,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/18895\/revisions\/18898"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/18896"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=18895"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=18895"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=18895"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}