{"id":188916,"date":"2024-06-05T18:09:06","date_gmt":"2024-06-05T15:09:06","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=188916"},"modified":"2024-06-05T18:09:25","modified_gmt":"2024-06-05T15:09:25","slug":"enerjisa-dagitim-sorumluluk-sahasini-bakim-ve-yatirimlariyla-aydinlatti","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/enerjisa-dagitim-sorumluluk-sahasini-bakim-ve-yatirimlariyla-aydinlatti\/","title":{"rendered":"(Turkish) &#8217;Enerjisa Da\u011f\u0131t\u0131m&#8217; Sorumluluk Sahas\u0131n\u0131 Bak\u0131m ve Yat\u0131r\u0131mlar\u0131yla Ayd\u0131nlatt\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/188916\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2>Elektrik da\u011f\u0131t\u0131m\u0131n\u0131 dijitalle\u015fme odakl\u0131 projeler ve yat\u0131r\u0131mlar ile ger\u00e7ekle\u015ftiren Enerjisa Da\u011f\u0131t\u0131m \u015eirketleri Ba\u015fkent EDA\u015e, Ayeda\u015f ve Toroslar EDA\u015e, y\u0131l\u0131n ilk 3 ay\u0131nda m\u00fc\u015fteri ve \u00e7\u00f6z\u00fcm odakl\u0131 yakla\u015f\u0131m\u0131 sayesinde ba\u015far\u0131l\u0131 \u00e7al\u0131\u015fmalara imza att\u0131.<\/h2>\n<p style=\"text-align: center;\"><img loading=\"lazy\" class=\"aligncenter wp-image-188918\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/06\/enerjisa-dagitim-sorumluluk-sahasini-bakim-ve-yatirimlariyla-aydinlatti.jpg\" alt=\"\" width=\"500\" height=\"378\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/06\/enerjisa-dagitim-sorumluluk-sahasini-bakim-ve-yatirimlariyla-aydinlatti.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/06\/enerjisa-dagitim-sorumluluk-sahasini-bakim-ve-yatirimlariyla-aydinlatti-300x227.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/06\/enerjisa-dagitim-sorumluluk-sahasini-bakim-ve-yatirimlariyla-aydinlatti-500x378.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/06\/enerjisa-dagitim-sorumluluk-sahasini-bakim-ve-yatirimlariyla-aydinlatti-66x50.jpg 66w\" sizes=\"(max-width: 500px) 100vw, 500px\" \/><\/p>\n<p><strong>Ba\u015fkent EDA\u015e<\/strong> (Ba\u015fkent Elektrik Da\u011f\u0131t\u0131m A\u015e), Ankara, Bart\u0131n, \u00c7ank\u0131r\u0131, Karab\u00fck, Kastamonu, K\u0131r\u0131kkale ve Zonguldak illerini kapsayan sorumluluk sahas\u0131ndaki 36.794 trafo ve 139.480 kilometre hat uzunlu\u011funda bak\u0131m, yenileme ve yat\u0131r\u0131m \u00e7al\u0131\u015fmalar\u0131na h\u0131z verdi. Ba\u015fkent EDA\u015e ekipleri taraf\u0131ndan 12.366 ayd\u0131nlatma armat\u00fcr\u00fc, 173 pano, 77 trafo, 567 da\u011f\u0131t\u0131m merkezi ve 17.292 km\u2019lik hatt\u0131n bak\u0131m\u0131n\u0131 ger\u00e7ekle\u015ftirdi. \u00c7al\u0131\u015fmalar kapsam\u0131nda 66,82 kilometrelik yeni kablo d\u00f6\u015fenirken, 978 yeni ayd\u0131nlatma armat\u00fcr\u00fcn\u00fcn, 47 yeni elektrik panosunun ve 16 trafo merkezinin de montaj\u0131 tamamland\u0131.<\/p>\n<p>T\u00fcrkiye\u2019de t\u00fcketilen toplam elektrik enerjisinin \u00f6nemli bir k\u0131sm\u0131n\u0131n da\u011f\u0131t\u0131m\u0131nda pay sahibi olan ve 3 milyondan fazla m\u00fc\u015fterisine hizmet veren Ayeda\u015f (\u0130stanbul Anadolu Yakas\u0131 Elektrik Da\u011f\u0131t\u0131m A\u015e) hizmet verdi\u011fi 8.273 trafo ve 34.297 kilometre hat uzunlu\u011funda s\u00fcrd\u00fcr\u00fclebilir ve kesintisiz enerji sa\u011flanabilmesi amac\u0131yla bak\u0131m, yenileme ve yat\u0131r\u0131m \u00e7al\u0131\u015fmalar\u0131n\u0131 s\u00fcrd\u00fcrd\u00fc. Ayeda\u015f ekipleri daha ayd\u0131nl\u0131k bir kent i\u00e7in 22.345 ayd\u0131nlatma armat\u00fcr\u00fc, 260 pano, 9 trafo ve 425 da\u011f\u0131t\u0131m merkezi ile 891 km\u2019lik hatt\u0131n bak\u0131m faaliyetlerini tamamlad\u0131. 102 kilometrelik yeni kablo d\u00f6\u015feyip, 205 yeni ayd\u0131nlatma armat\u00fcr\u00fcn\u00fcn montaj\u0131n\u0131 tamamlayan ekipler yeni 47 elektrik panosu ile 15 trafo merkezinin de montaj\u0131n\u0131 ger\u00e7ekle\u015ftirdi.<\/p>\n<p><strong>Toroslar EDA\u015e<\/strong> (Toroslar Elektrik Da\u011f\u0131t\u0131m A\u015e) Adana, Osmaniye, Gaziantep, Mersin, Kilis ve Hatay olmak \u00fczere sorumluluk b\u00f6lgesindeki 6 ilde hizmet verdi\u011fi 50.842 trafo ve 153.802 kilometre hat uzunlu\u011funda bak\u0131m, yenileme ve yat\u0131r\u0131m \u00e7al\u0131\u015fmalar\u0131na devam etti. Toroslar EDA\u015e ekipleri sorumluluk sahas\u0131nda 12.541 ayd\u0131nl\u0131k armat\u00fcr\u00fc, 12 pano, 187 trafo ve 679 da\u011f\u0131t\u0131m merkezi ile 15.969 km\u2019lik hatt\u0131n bak\u0131m faaliyetlerini tamamlad\u0131.90,3 kilometrelik yeni kablo d\u00f6\u015feyip, 945 yeni ayd\u0131nlatma armat\u00fcr\u00fcn\u00fcn montaj\u0131n\u0131 tamamlayan ekipler yeni 85 elektrik panosu ile 29 trafo merkezinin de montaj\u0131n\u0131 ger\u00e7ekle\u015ftirdi.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Elektrik da\u011f\u0131t\u0131m\u0131n\u0131 dijitalle\u015fme odakl\u0131 projeler ve yat\u0131r\u0131mlar ile ger\u00e7ekle\u015ftiren Enerjisa Da\u011f\u0131t\u0131m \u015eirketleri Ba\u015fkent EDA\u015e, Ayeda\u015f ve Toroslar EDA\u015e, y\u0131l\u0131n ilk 3 ay\u0131nda [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":188918,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53],"tags":[19261,114110,170,4546,117,49286,3558],"views":34,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/188916"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=188916"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/188916\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/188918"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=188916"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=188916"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=188916"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}