{"id":188655,"date":"2024-05-31T17:06:39","date_gmt":"2024-05-31T14:06:39","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=188655"},"modified":"2024-05-31T17:08:21","modified_gmt":"2024-05-31T14:08:21","slug":"gelecek-icin-trafolar","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/gelecek-icin-trafolar\/","title":{"rendered":"(Turkish) Gelecek \u0130\u00e7in Trafolar"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/188655\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2>Midtfjellet R\u00fczgar Santrali, Norve\u00e7\u2019te bu alandaki en b\u00fcy\u00fck tesis olma \u00f6zelli\u011fini ta\u015f\u0131yor ve en geli\u015fmi\u015f r\u00fczgar t\u00fcrbini teknolojisini kullan\u0131yor. Ayn\u0131 zamanda, T\u00fcrk trafo \u00fcreticisi BEST Trafo \u015firketinin \u00fcst\u00fcn kalitesini ve Nynas ile ba\u015far\u0131l\u0131 ortakl\u0131klar\u0131n\u0131 g\u00f6zler \u00f6n\u00fcne seriyor.<\/h2>\n<p style=\"text-align: center;\"><img loading=\"lazy\" class=\"aligncenter size-full wp-image-188657\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/05\/gelecek-icin-trafolar.jpg\" alt=\"\" width=\"500\" height=\"281\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/05\/gelecek-icin-trafolar.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/05\/gelecek-icin-trafolar-300x169.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/05\/gelecek-icin-trafolar-80x45.jpg 80w\" sizes=\"(max-width: 500px) 100vw, 500px\" \/><\/p>\n<p>Bal\u0131kesir Elektromekanik Sanayi Tesisleri (BEST) \u015firketi, <strong>g\u00fc\u00e7, da\u011f\u0131t\u0131m, \u00f6zel ve kuru tip trafo \u00fcretimi<\/strong> ger\u00e7ekle\u015ftiriyor ve \u00fcr\u00fcnlerini yakla\u015f\u0131k 90 \u00fclkeye ihra\u00e7 ediyor. Y\u00fcksek kaliteli trafolar\u0131n yan\u0131 s\u0131ra, kazan ve n\u00fcve gibi ba\u015fl\u0131ca trafo bile\u015fenlerini de \u015firket b\u00fcnyesinde imal ediyor.<\/p>\n<p><strong>\u015eirketin Pazarlama ve \u0130leti\u015fim M\u00fcd\u00fcr\u00fc Ahmet Kerem K\u00f6seo\u011flu<\/strong>, <em>\u201c2023 y\u0131l\u0131nda 50.000 MVA \u00fcretim kapasitemizle sekt\u00f6r\u00fcn lider T\u00fcrk ihracat\u00e7\u0131s\u0131 olduk. Ar-Ge\u2019ye verdi\u011fimiz \u00f6nem sayesinde en zorlu trafolar\u0131 dahi tasarlama ve geli\u015ftirme kapasitesine sahibiz. Trafolar\u0131 \u00fcretim ba\u015flamadan \u00f6nce analiz ve test edebiliyoruz ve bu sayede \u00fcr\u00fcnlerimiz sekt\u00f6r ortalamas\u0131n\u0131n alt\u0131nda bir ar\u0131za oran\u0131na sahip,\u201d<\/em> diye belirtiyor.<\/p>\n<p>Toplam 170.000 metrekare \u00fcretim alan\u0131 ve yedi test laboratuvar\u0131na sahip olan BEST Trafo, g\u00fc\u00e7l\u00fc tasar\u0131m ve imalat kapasitesi ile k\u00fcresel m\u00fc\u015fteri taban\u0131na \u00e7e\u015fitli trafo t\u00fcrleri ve reakt\u00f6r, faz kayd\u0131r\u0131c\u0131 ve mobil trafo merkezi gibi \u00f6zel \u00e7\u00f6z\u00fcmler sunuyor.<\/p>\n<p>Ahmet Kerem K\u00f6seo\u011flu, <em>\u201cHam maddeden nihai \u00fcr\u00fcne kadar s\u00fcrecin tamam\u0131nda kontrol sahibi olmam\u0131z, y\u00fcksek kaliteyi garanti etmemizi sa\u011fl\u0131yor,\u201d<\/em> diyor. Artan enerji talebinin yan\u0131 s\u0131ra elektrik enerjisine ve yenilenebilir enerji kaynaklar\u0131na devam eden ge\u00e7i\u015fin etkisiyle gelecekte de g\u00fc\u00e7l\u00fc b\u00fcy\u00fcmenin devam edece\u011fini \u00f6ng\u00f6r\u00fcyor.<\/p>\n<p><em>\u00c7o\u011fu \u015febeke operat\u00f6r\u00fcn\u00fcn altyap\u0131s\u0131 art\u0131k eskimi\u015f durumda ve bu nedenle \u015febeke yenileme \u00e7al\u0131\u015fmalar\u0131 trafo talebini art\u0131racak. Biz de bu talebi kar\u015f\u0131lamak i\u00e7in imalat ve test laboratuvarlarm\u0131za b\u00fcy\u00fck yat\u0131r\u0131mlar yap\u0131yoruz. Ayr\u0131ca, trafolar i\u00e7in \u00fcretim ve i\u015fletim a\u015famalar\u0131nda karbon azalt\u0131m se\u00e7enekleri sunuyoruz.\u201d<\/em><\/p>\n<p>Yenilenebilir enerji kaynaklar\u0131yla ger\u00e7ekle\u015ftirdi\u011fimiz \u00f6nemli projelerden birisi, 2013 y\u0131l\u0131ndan beri faaliyette olan Midtfjellet R\u00fczgar Santralidir. 55 t\u00fcrbine sahip olan bu santral, Norve\u00e7\u2019te t\u00fcr\u00fcn\u00fcn en b\u00fcy\u00fc\u011f\u00fcd\u00fcr. T\u00fcrbinleri birbirine yak\u0131n konumland\u0131rarak altyap\u0131, i\u015fletim ve bak\u0131m y\u00f6n\u00fcnden bariz faydalar elde edildi ve \u00fcretim artarken ortalama maliyetlerde d\u00fc\u015f\u00fc\u015f sa\u011fland\u0131.<\/p>\n<p>R\u00fczgar santrali \u015fu anda toplam 151 MW kapasiteye sahip. \u0130lk 21 t\u00fcrbin, BEST Trafo taraf\u0131ndan tasarlanan ve \u00fcretilen 130 MVA 300 kV\u2019lik trafo ile 2011 y\u0131l\u0131nda kuruldu. \u0130kinci a\u015fama olarak 2013 y\u0131l\u0131nda 100 MVA\u2019l\u0131k bir \u00fcnite ile birlikte 23 t\u00fcrbinin daha kurulumu ger\u00e7ekle\u015ftirildi.<\/p>\n<p>O d\u00f6nemde Norve\u00e7, y\u00fcksek gerilim (HV) \u015febekesini 300 kV\u2019den 420 kV\u2019ye y\u00fckseltmeyi planl\u0131yordu ve trafonun her iki gerilime de uygun \u00e7al\u0131\u015fabilmesini istediler.<\/p>\n<p>Projenin tasar\u0131mc\u0131lar\u0131ndan birisi olan Ahmet Kerem K\u00f6seo\u011flu, <em>\u201cBu ger\u00e7ekten zor bir talepti. \u0130ki i\u015fletim modu aras\u0131nda ge\u00e7i\u015f yapmay\u0131 sa\u011flayan gizli bir i\u015fletim kolu eklemeye karar verdik. Bu bir \u00fcnite i\u00e7in iki farkl\u0131 trafo tasarlamak gibiydi,\u201d<\/em> diyor.<\/p>\n<h3><strong>\u201cNynas, g\u00fcncel Ar-Ge projelerini takip etmek veya a\u00e7\u0131k ihaleleri \u00f6\u011frenmek i\u00e7in bizi s\u0131k s\u0131k ziyaret ediyor. Daima m\u00fc\u015fteri gereksinimlerini kontrol ederek bize en iyi \u00e7\u00f6z\u00fcm\u00fc h\u0131zl\u0131ca sunabiliyorlar.\u201d <\/strong><\/h3>\n<p>M\u00fc\u015fteri, <strong>trafolar<\/strong> i\u00e7in <strong>yal\u0131t\u0131m ya\u011f\u0131<\/strong> olarak <strong>NYTRO\u00ae 4000X<\/strong> talep etti.<\/p>\n<p><em>\u201cB\u00fcy\u00fck ihtimalle ya\u011f bozunmas\u0131na dayan\u0131kl\u0131 oldu\u011funu ve oksidasyon stabilitesi sa\u011flayabilece\u011fini, bu sayede trafonun \u00f6mr\u00fcn\u00fc uzat\u0131rken ve daha az bak\u0131m gerektirece\u011fini biliyorlard\u0131.\u201d<\/em><\/p>\n<p>BEST Trafo\u2019nun ilk <strong>NYTRO 4000X sipari\u015fleri<\/strong>nden biriydi, bu y\u00fczden ya\u011f\u0131 ara\u015ft\u0131rd\u0131lar ve Nynas ile birlikte de\u011ferlendirdiler.<\/p>\n<p><em>\u201cAlan\u0131nda b\u00f6ylesine uzman bir \u015firketle ileti\u015fim kurmak her zaman kolay ve e\u011flencelidir. Bazen Nynas, uzun zamand\u0131r Nynas \u00e7\u00f6z\u00fcmlerini kulland\u0131klar\u0131 i\u00e7in m\u00fc\u015fterilerimizi bizden iyi tan\u0131yor.\u201d<\/em><\/p>\n<p>\u0130ki \u015firket aras\u0131ndaki i\u015fbirli\u011fi \u00e7ok eskiye dayan\u0131yor. \u015eimdiye dek BEST, <strong>Nynas yal\u0131t\u0131m ya\u011flar\u0131<\/strong>n\u0131 kullanan toplam <strong>128 GVA<\/strong>\u2019dan y\u00fcksek g\u00fcce sahip <strong>12.800 civar\u0131nda trafo<\/strong> imal etti.<\/p>\n<p><em>\u201cNynas\u2019\u0131n T\u00fcrkiye ofisi oldu\u011fu i\u00e7in \u00e7ok \u015fansl\u0131y\u0131z. Nynas gibi b\u00fcy\u00fck bir markan\u0131n yerel bir i\u015f orta\u011f\u0131n\u0131n olmas\u0131 i\u015fleri kolayla\u015ft\u0131r\u0131yor. G\u00fcncel Ar-Ge projelerini takip etmek veya a\u00e7\u0131k ihaleleri \u00f6\u011frenmek i\u00e7in bizi s\u0131k s\u0131k ziyaret ediyorlar. Proje alan\u0131na teslimat veya liman teslimat\u0131 dahil, m\u00fc\u015fteri gereksinimlerini \u00f6\u011frenerek ederek bize en iyi \u00e7\u00f6z\u00fcm\u00fc her zaman h\u0131zl\u0131ca sunabiliyorlar.\u201d<\/em><\/p>\n<p>Kariyerinin ilk y\u0131llar\u0131nda tasar\u0131mc\u0131 olarak g\u00f6rev alan Ahmet Kerem K\u00f6seo\u011flu, Nynas \u00fcr\u00fcnlerinin teknik bilgi dosyalar\u0131ndan \u00e7ok \u015fey \u00f6\u011frendi\u011fini belirtiyor.<\/p>\n<p><em>\u201cBu dosyalar \u00e7ok iyi d\u00fczenlenmi\u015f ve pek \u00e7ok dilde eri\u015fime sunuluyor. Nynas\u2019\u0131n teknik dok\u00fcmanlar\u0131ndan g\u00fcvenilir bir kaynak olarak faydalan\u0131labiliyor,\u201d<\/em> diyor ve \u015firketin bilgi ve Ar-Ge alan\u0131nda BEST Trafo kadar fazla yat\u0131r\u0131m yapt\u0131\u011f\u0131n\u0131 ekliyor.<\/p>\n<p><em>\u201cBize \u00e7ok g\u00fc\u00e7l\u00fc bir temel sunuyorlar. Nynas\u2019\u0131 sadece bir tedarik\u00e7i olarak de\u011fil, i\u015f orta\u011f\u0131m\u0131z olarak g\u00f6r\u00fcyoruz. G\u00fcvene ve kar\u015f\u0131l\u0131kl\u0131 deste\u011fe dayanan k\u00f6kl\u00fc bir birlikteli\u011fimiz var ve bunu uzun y\u0131llar boyunca s\u00fcrd\u00fcrmek istiyoruz.&#8221;<\/em><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Midtfjellet R\u00fczgar Santrali, Norve\u00e7\u2019te bu alandaki en b\u00fcy\u00fck tesis olma \u00f6zelli\u011fini ta\u015f\u0131yor ve en geli\u015fmi\u015f r\u00fczgar t\u00fcrbini teknolojisini kullan\u0131yor. Ayn\u0131 zamanda, T\u00fcrk [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":188657,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53],"tags":[114008,114007,85017,114012,114011,114010,109293,114009],"views":45,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/188655"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=188655"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/188655\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/188657"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=188655"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=188655"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=188655"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}