{"id":188409,"date":"2024-05-22T19:36:21","date_gmt":"2024-05-22T16:36:21","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=188409"},"modified":"2024-05-22T19:36:21","modified_gmt":"2024-05-22T16:36:21","slug":"2024-nisan-ayinda-toplam-kurulu-gucumuzun-yuzde-12-8-lik-kismi-gunes-ten","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/2024-nisan-ayinda-toplam-kurulu-gucumuzun-yuzde-12-8-lik-kismi-gunes-ten\/","title":{"rendered":"(Turkish) 2024 Nisan Ay\u0131nda Toplam Kurulu G\u00fcc\u00fcm\u00fcz\u00fcn %12,8\u2019lik K\u0131sm\u0131 G\u00fcne\u015f&#8217;ten!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/188409\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2><strong>2024 y\u0131l\u0131 Mart ay\u0131 sonunda 107.941 MW olan toplam kurulu g\u00fc\u00e7 de\u011feri 1.251,13 MW\u2019l\u0131k art\u0131\u015fla 2024 y\u0131l\u0131 Nisan ay\u0131 sonunda 109.192 MW olarak kaydedildi. 2024 y\u0131l\u0131 Nisan ay\u0131 sonunda olu\u015fan toplam kurulu g\u00fcc\u00fcn %12,8\u2019lik k\u0131sm\u0131 (13.939 MW) g\u00fcne\u015f enerjisi santralleri taraf\u0131nda olu\u015fturuldu.<\/strong><\/h2>\n<p><a href=\"https:\/\/www.tenva.org\/aplus-enerji-nisan-2024-analizi\/\" target=\"_blank\" rel=\"noopener\">APLUS Enerji taraf\u0131ndan yap\u0131lan analize g\u00f6re<\/a>, ger\u00e7ekle\u015fen elektrik \u00fcretimi kaynak bak\u0131m\u0131ndan incelendi\u011finde, 2024 Nisan ay\u0131nda toplam \u00fcretimin %9,4\u2019\u00fcn\u00fcn do\u011fal gaz ve LNG santralleri taraf\u0131ndan ger\u00e7ekle\u015ftirildi\u011fi g\u00f6r\u00fclmektedir. Barajl\u0131 hidroelektrik santraller, ilgili ayda toplam \u00fcretimin %22,1\u2019ini kar\u015f\u0131larken, akarsu tipi hidroelektrik santraller ise %11,7 oran\u0131yla \u00fcretime katk\u0131da bulunmu\u015ftur. \u0130thal k\u00f6m\u00fcr santralleri Nisan ay\u0131nda toplam \u00fcretimin %14,5\u2019ini kar\u015f\u0131larken, yerli k\u00f6m\u00fcr santralleri ise %12,3 oran\u0131nda katk\u0131 sa\u011flam\u0131\u015ft\u0131r. Yenilenebilir enerji santrallerinden r\u00fczg\u00e2r enerjisi santralleri toplam \u00fcretime %13,6 jeotermal ve g\u00fcne\u015f enerjisi santralleri ise toplam %13,0 oran\u0131nda katk\u0131da bulunmu\u015ftur. Di\u011fer termik santrallerin \u00fcretimdeki pay\u0131 ise %3,5 olarak ger\u00e7ekle\u015fmi\u015ftir. TE\u0130A\u015e taraf\u0131ndan yay\u0131mlanan \u00fcretim verilerine g\u00f6re, 2024 Nisan ay\u0131nda termik santrallerin ger\u00e7ekle\u015fen toplam \u00fcretimdeki pay\u0131 %39,63 olarak kaydedilmi\u015ftir. Yenilenebilir enerji kaynaklar\u0131ndan elde edilen elektrik \u00fcretiminin pay\u0131 ise %60,37 olarak ger\u00e7ekle\u015fti.<\/p>\n<p style=\"text-align: center;\"><img loading=\"lazy\" class=\"aligncenter wp-image-188411\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/05\/2024-nisan-ayinda-toplam-kurulu-gucumuzun-yuzde-12-8-lik-kismi-gunes-ten-1.jpg\" alt=\"\" width=\"500\" height=\"294\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/05\/2024-nisan-ayinda-toplam-kurulu-gucumuzun-yuzde-12-8-lik-kismi-gunes-ten-1.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/05\/2024-nisan-ayinda-toplam-kurulu-gucumuzun-yuzde-12-8-lik-kismi-gunes-ten-1-300x176.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/05\/2024-nisan-ayinda-toplam-kurulu-gucumuzun-yuzde-12-8-lik-kismi-gunes-ten-1-500x294.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/05\/2024-nisan-ayinda-toplam-kurulu-gucumuzun-yuzde-12-8-lik-kismi-gunes-ten-1-80x47.jpg 80w\" sizes=\"(max-width: 500px) 100vw, 500px\" \/><\/p>\n<p>2024 y\u0131l\u0131 Nisan ay\u0131 sonunda olu\u015fan toplam kurulu g\u00fcc\u00fcn %22,9\u2019luk k\u0131sm\u0131 (24.990 MW) do\u011fal gaz ve LNG yak\u0131t tipi santralleri ile kar\u015f\u0131lan\u0131rken, %21,7\u2019lik k\u0131sm\u0131 (23.671 MW) barajl\u0131 hidrolik santraller taraf\u0131ndan kar\u015f\u0131lanmaktad\u0131r. Bu yak\u0131t tiplerini %10,5\u2019lik (11.452 MW) oran ile yerli k\u00f6m\u00fcr[9] santralleri ve %9,5\u2019lik oran (10.374 MW) ile ithal k\u00f6m\u00fcr santralleri izlemektedir. Akarsu tipi hidrolik santraller %7,6\u2019l\u0131k bir orana (8.327 MW) sahipken, r\u00fczg\u00e2r santralleri toplam kurulu g\u00fcc\u00fcn %11,1\u2019lik bir k\u0131sm\u0131n\u0131 (12.077 MW) olu\u015fturmaktad\u0131r. Toplam kurulu g\u00fcc\u00fcn %12,8\u2019lik k\u0131sm\u0131 (13.939 MW) g\u00fcne\u015f enerjisi santralleri, %1,5\u2019lik k\u0131sm\u0131 (1.691 MW) jeotermal enerji santrallerinden olu\u015furken, %2,4\u2019l\u00fck k\u0131sm\u0131 (2.671 MW) ise di\u011fer termik santraller taraf\u0131ndan olu\u015fturulmaktad\u0131r.<\/p>\n<p>Kaynak:\u00a0<a href=\"https:\/\/www.tenva.org\/aplus-enerji-nisan-2024-analizi\/\" target=\"_blank\" rel=\"noopener\">APLUS Enerji \/ TENVA<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. 2024 y\u0131l\u0131 Mart ay\u0131 sonunda 107.941 MW olan toplam kurulu g\u00fc\u00e7 de\u011feri 1.251,13 MW\u2019l\u0131k art\u0131\u015fla 2024 y\u0131l\u0131 Nisan ay\u0131 sonunda 109.192 MW [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":188413,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[113932,19,2326,1325,105],"views":25,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/188409"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=188409"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/188409\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/188413"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=188409"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=188409"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=188409"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}