{"id":188368,"date":"2024-05-22T16:14:07","date_gmt":"2024-05-22T13:14:07","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=188368"},"modified":"2024-05-22T16:14:07","modified_gmt":"2024-05-22T13:14:07","slug":"cimsa-ispanya-valensiya-da-4-2-milyon-euroluk-yatirimla-ges-kurdu","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/cimsa-ispanya-valensiya-da-4-2-milyon-euroluk-yatirimla-ges-kurdu\/","title":{"rendered":"(Turkish) &#8217;\u00c7imsa&#8217; \u0130spanya Valensiya\u2019da 4.2 Milyon Euro\u2019luk Yat\u0131r\u0131mla GES Kurdu"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/188368\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2><strong>Sabanc\u0131 Toplulu\u011fu\u2019nun global markas\u0131 \u00c7imsa, \u0130spanya Valensiya\u2019daki<\/strong><em>\u00a0<\/em><strong>beyaz \u00e7imento fabrikas\u0131nda 4.2 milyon Euro\u2019luk yat\u0131r\u0131mla kurdu\u011fu g\u00fcne\u015f enerjisi santrali (GES) yat\u0131r\u0131m\u0131n\u0131 t\u00f6renle hizmete ald\u0131. GES\u2019in devreye al\u0131nmas\u0131 i\u00e7in d\u00fczenlenen t\u00f6rene Valensiya Kalite ve \u00c7evre E\u011fitim M\u00fcd\u00fcr\u00fc Jorge Blanco Coll, Bunol Belediye Ba\u015fkan\u0131<\/strong> <strong>Virginia Sanz Ferrus, Valensiya \u00c7evre ve Kalite E\u011fitmeni Jose Vicente Miro Bayarri, \u00c7imsa CEO\u2019su Umut Zenar, \u00c7imsa \u0130spanya Genel M\u00fcd\u00fcr\u00fc Onur Yazgan ile ID Energy Group CEO\u2019su Benito Puebla ve her iki \u015firketin \u00fcst d\u00fczey y\u00f6neticileri kat\u0131ld\u0131.<\/strong><\/h2>\n<p style=\"text-align: center;\"><img loading=\"lazy\" class=\"aligncenter wp-image-188371\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/05\/cimsa-ispanya-valensiya-da-4-2-milyon-euroluk-yatirimla-ges-kurdu-1.jpg\" alt=\"\" width=\"500\" height=\"375\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/05\/cimsa-ispanya-valensiya-da-4-2-milyon-euroluk-yatirimla-ges-kurdu-1.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/05\/cimsa-ispanya-valensiya-da-4-2-milyon-euroluk-yatirimla-ges-kurdu-1-300x225.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/05\/cimsa-ispanya-valensiya-da-4-2-milyon-euroluk-yatirimla-ges-kurdu-1-500x375.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/05\/cimsa-ispanya-valensiya-da-4-2-milyon-euroluk-yatirimla-ges-kurdu-1-67x50.jpg 67w\" sizes=\"(max-width: 500px) 100vw, 500px\" \/><\/p>\n<p><strong>ID Energy Group<\/strong> taraf\u0131ndan anahtar teslim kurulan ve <strong>7,2 MW<\/strong> kurulu g\u00fcce sahip GES, y\u0131lda yakla\u015f\u0131k <strong>12 GWh<\/strong> elektrik \u00fcretecek.\u00a014 futbol sahas\u0131 b\u00fcy\u00fckl\u00fc\u011f\u00fcnde 100 bin metrekare alan \u00fczerinde 11 bin adet g\u00fcne\u015f paneliyle kurulan GES&#8217;te \u00fcretilen enerjinin tamam\u0131 <strong>\u00c7imsa Cementos<\/strong> taraf\u0131ndan kullan\u0131lacak. GES yat\u0131r\u0131m\u0131, b\u00f6ylece Valensiya&#8217;daki fabrikan\u0131n enerji ihtiyac\u0131n\u0131n yakla\u015f\u0131k <strong>y\u00fczde 18<\/strong>\u2019ini kar\u015f\u0131layacak. \u00dcretilen yenilenebilir enerji miktar\u0131 (12 GWh\/y\u0131l) <strong>y\u0131lda 3.000 ton CO2 sal\u0131m\u0131na<\/strong> e\u015fde\u011fer olacak.<\/p>\n<p>2021 y\u0131l\u0131nda devrald\u0131klar\u0131 Bu\u00f1ol Fabrikas\u0131 ile beyaz \u00e7imento alan\u0131nda d\u00fcnyan\u0131n lider oyuncular\u0131 aras\u0131nda yer ald\u0131klar\u0131n\u0131 ve \u0130spanya\u2019da sat\u0131lan her iki \u00fcr\u00fcnden birinin \u00c7imsa markas\u0131n\u0131 ta\u015f\u0131d\u0131\u011f\u0131n\u0131 vurgulayan <strong>\u00c7imsa CEO\u2019su Umut Zenar<\/strong>, t\u00f6rende yapt\u0131\u011f\u0131 konu\u015fmada \u015funlar\u0131 s\u00f6yledi:<\/p>\n<p><em>\u201cSabanc\u0131 Toplulu\u011fu&#8217;nun global markas\u0131 \u00c7imsa olarak, Valensiya \u015fehrindeki Bu\u00f1ol Fabrikam\u0131zda ID Energy Group ile ger\u00e7ekle\u015ftirdi\u011fimiz \u00f6nemli bir yat\u0131r\u0131m\u0131n meyvesini bug\u00fcn birlikte topluyoruz. \u00c7imsa olarak, global \u00f6l\u00e7ekte i\u015f yapma vizyonumuz \u00e7er\u00e7evesinde, sadece T\u00fcrkiye&#8217;deki de\u011fil ayn\u0131 zamanda yurtd\u0131\u015f\u0131ndaki faaliyetlerimizde de enerji verimlili\u011fi ve yenilenebilir enerji alan\u0131ndaki inisiyatiflerimizi art\u0131rarak \u00e7evresel etkiyi minimize etmeye odaklan\u0131yoruz. Bug\u00fcn itibar\u0131yla, t\u00fcm fabrikalar\u0131m\u0131zda yenilenebilir enerji kullan\u0131m\u0131m\u0131z ise <strong>y\u00fczde 54<\/strong>\u2019e ula\u015ft\u0131. Bug\u00fcn a\u00e7\u0131l\u0131\u015f\u0131n\u0131 ger\u00e7ekle\u015ftirdi\u011fimiz g\u00fcne\u015f enerjisi santrali de bu \u00e7abalar\u0131m\u0131z\u0131n somut bir \u00f6rne\u011fi. Bu santralde \u00fcretilen yenilenebilir enerji miktar\u0131 (12 GWh\/y\u0131l), 3 bin 600 konutun elektrik ihtiyac\u0131na e\u015fde\u011fer olacak. Bu yat\u0131r\u0131m sayesinde hem i\u015f s\u00fcre\u00e7lerimizi optimize ediyoruz hem de \u00e7evre dostu uygulamalarla s\u00fcrd\u00fcr\u00fclebilir bir gelecek i\u00e7in sorumluluk al\u0131yoruz\u201d.<\/em><\/p>\n<p><strong>ID Energy Group CEO\u2019su Benito Puebla<\/strong> ise \u015funlar\u0131 s\u00f6yledi:<\/p>\n<p><em>\u201cBu proje, Bu\u00f1ol&#8217;da \u00f6nemli bir istihdam sa\u011flad\u0131. \u0130n\u015faat a\u015famas\u0131nda bir\u00e7ok yerel personele i\u015f imk\u00e2n\u0131 sa\u011flad\u0131k. Operat\u00f6rler, teknisyenler, idari personeller i\u00e7in kal\u0131c\u0131 ve kaliteli istihdam yaratmaya devam edece\u011fiz. Bu projenin en b\u00fcy\u00fck ba\u015far\u0131lar\u0131ndan biri, toplum i\u00e7inde ve b\u00f6lgedeki \u015firketlerde ekonomik ve sosyal b\u00fcy\u00fcmeyi te\u015fvik etmesidir. Bug\u00fcn bu projenin geldi\u011fi noktaya bak\u0131nca, hedeflerimize b\u00fcy\u00fck \u00f6l\u00e7\u00fcde ula\u015ft\u0131\u011f\u0131m\u0131z\u0131 s\u00f6yleyebilirim. Santralimiz, yenilik ve s\u00fcrd\u00fcr\u00fclebilirli\u011fin nas\u0131l bir arada olabilece\u011finin bir \u00f6rne\u011fidir. 7,2 megavatl\u0131k kapasitesiyle bu santral, temiz enerji \u00fcretecek ve y\u0131lda 3000 tonun \u00fczerinde CO2 sal\u0131n\u0131m\u0131n\u0131 azaltarak \u00e7evreye katk\u0131da bulunacak. B\u00f6ylece, iklim de\u011fi\u015fikli\u011fiyle m\u00fccadelede ve daha ye\u015fil, s\u00fcrd\u00fcr\u00fclebilir bir gelece\u011fi te\u015fvik etme misyonumuzda hayati bir rol oynayacak.\u201d<\/em><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Sabanc\u0131 Toplulu\u011fu\u2019nun global markas\u0131 \u00c7imsa, \u0130spanya Valensiya\u2019daki\u00a0beyaz \u00e7imento fabrikas\u0131nda 4.2 milyon Euro\u2019luk yat\u0131r\u0131mla kurdu\u011fu g\u00fcne\u015f enerjisi santrali (GES) yat\u0131r\u0131m\u0131n\u0131 t\u00f6renle hizmete ald\u0131. [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":188370,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49],"tags":[95983,33332,109167,2326,29013,2569,109166,50959],"views":32,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/188368"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=188368"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/188368\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/188370"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=188368"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=188368"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=188368"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}