{"id":188159,"date":"2024-05-15T20:12:28","date_gmt":"2024-05-15T17:12:28","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=188159"},"modified":"2024-05-15T20:15:35","modified_gmt":"2024-05-15T17:15:35","slug":"toroslar-edas-ve-baskent-edastan-bakim-onarim-ve-yatirim-hizmeti","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/toroslar-edas-ve-baskent-edastan-bakim-onarim-ve-yatirim-hizmeti\/","title":{"rendered":"(Turkish) Toroslar EDA\u015e ve Ba\u015fkent EDA\u015e\u2019tan Bak\u0131m, Onar\u0131m ve Yat\u0131r\u0131m Hizmeti"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/188159\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2>Enerjisa Da\u011f\u0131t\u0131m \u015eirketleri Toroslar EDA\u015e ve Ba\u015fkent EDA\u015e, elektrik da\u011f\u0131t\u0131m\u0131 yapt\u0131klar\u0131 illerde s\u00fcrd\u00fcr\u00fclebilir ve kesintisiz enerji sa\u011flanabilmesi amac\u0131yla 2024 y\u0131l\u0131n\u0131n ilk 3 ay\u0131nda bak\u0131m, onar\u0131m ve yat\u0131r\u0131m hizmetlerini s\u00fcrd\u00fcrd\u00fc.<\/h2>\n<p style=\"text-align: center;\"><img loading=\"lazy\" class=\"aligncenter wp-image-188161\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/05\/toroslar-edas-ve-baskent-edastan-bakim-calismalari.jpg\" alt=\"\" width=\"500\" height=\"306\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/05\/toroslar-edas-ve-baskent-edastan-bakim-calismalari.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/05\/toroslar-edas-ve-baskent-edastan-bakim-calismalari-300x184.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/05\/toroslar-edas-ve-baskent-edastan-bakim-calismalari-500x306.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/05\/toroslar-edas-ve-baskent-edastan-bakim-calismalari-80x50.jpg 80w\" sizes=\"(max-width: 500px) 100vw, 500px\" \/><\/p>\n<p>Ankara, \u00c7ank\u0131r\u0131, K\u0131r\u0131kkale, Bart\u0131n, Kastamonu, Zonguldak ve Karab\u00fck illerinde faaliyetlerini s\u00fcrd\u00fcren Ba\u015fkent EDA\u015e, Ankara ve Zonguldak\u2019ta ger\u00e7ekle\u015ftirdi\u011fi \u00e7al\u0131\u015fmalar hakk\u0131nda bilgi verdi. Toroslar EDA\u015e ise Mersin ilinde elektrik da\u011f\u0131t\u0131m \u00e7al\u0131\u015fmalar\u0131n\u0131n kesintisiz s\u00fcrmesi i\u00e7in yapt\u0131\u011f\u0131 \u00e7al\u0131\u015fmalar\u0131 payla\u015ft\u0131.<\/p>\n<p>Ba\u015fkent EDA\u015e, Ankara\u2019da hizmet verdi\u011fi 3 milyondan fazla m\u00fc\u015fterisine daha iyi hizmet vermek amac\u0131yla 21.439 trafo ve 67.113 kilometre hat uzunlu\u011funda bak\u0131m, yenileme ve yat\u0131r\u0131m \u00e7al\u0131\u015fmalar\u0131n\u0131 s\u00fcrd\u00fcrd\u00fc.\u00a0Beypazar\u0131, Nall\u0131han, Elmada\u011f, \u00c7ankaya, Alt\u0131nda\u011f, Polatl\u0131, G\u00f6lba\u015f\u0131, \u015eerefliko\u00e7hisar, Etimesgut, Bala, Haymana, Aya\u015f, G\u00fcd\u00fcl, K\u0131z\u0131lcahamam, \u00c7aml\u0131dere, Kazan, Sincan, \u00c7ubuk, Akyurt, Kalecik ve Pursaklar\u2019da 3.748 ayd\u0131nlatma armat\u00fcr\u00fcn\u00fcn bak\u0131m\u0131n\u0131 ger\u00e7ekle\u015ftiren Ba\u015fkent EDA\u015e ekipleri, b\u00f6lgede 149 pano ile 21 trafo ve 390 da\u011f\u0131t\u0131m merkezini de elden ge\u00e7irdi. Ayr\u0131ca kentte 1.902 Km\u2019lik hatt\u0131n bak\u0131m\u0131 yap\u0131ld\u0131. Toplam 32 kilometrelik yeni kablo d\u00f6\u015feyen Ba\u015fkent EDA\u015e ekipleri, kentte 66 yeni ayd\u0131nlatma armat\u00fcr\u00fcn\u00fcn montaj\u0131n\u0131 da tamamlad\u0131. Ayr\u0131ca yeni 8 elektrik panosu ile 9 trafo montaj\u0131 da bitirildi.<\/p>\n<p>Ba\u015fkent EDA\u015e, Zonguldak\u2019ta hizmet verdi\u011fi 418 binden fazla m\u00fc\u015fterisine daha iyi hizmet vermek amac\u0131yla toplam 5 kilometrelik yeni kablo d\u00f6\u015feyen Ba\u015fkent EDA\u015e ekipleri, kentte 151 yeni ayd\u0131nlatma armat\u00fcr\u00fcn\u00fcn montaj\u0131n\u0131 da tamamlad\u0131. Ayr\u0131ca yeni 4 elektrik panosu montaj\u0131 da tamamland\u0131. Merkez, Kozlu, Kilimli, Devrek, Alapl\u0131, G\u00f6k\u00e7ebey, \u00c7aycuma, Ere\u011fli\u2019de 1.598 ayd\u0131nlatma armat\u00fcr\u00fcn\u00fcn bak\u0131m\u0131n\u0131 ger\u00e7ekle\u015ftiren Ba\u015fkent EDA\u015e ekipleri, b\u00f6lgede 14 pano ile 13 trafo ve 76 da\u011f\u0131t\u0131m merkezi bak\u0131m\u0131n\u0131 tamamlad\u0131. Ayr\u0131ca kentte 179 Km\u2019lik hatt\u0131n bak\u0131m\u0131 yap\u0131ld\u0131.<\/p>\n<p>Toroslar EDA\u015e, Mersin\u2019de hizmet verdi\u011fi <strong>12.234 trafo<\/strong> ve <strong>43.550 kilometre hat uzunlu\u011funda<\/strong> s\u00fcrd\u00fcr\u00fclebilir ve kesintisiz enerji sa\u011flanabilmesi amac\u0131yla bak\u0131m, yenileme ve yat\u0131r\u0131m \u00e7al\u0131\u015fmalar\u0131n\u0131 s\u00fcrd\u00fcrd\u00fc.\u00a0Akdeniz, Erdemli, Toroslar, Mezitli, Yeni\u015fehir, Tarsus, \u00c7aml\u0131yayla, G\u00fclnar, Ayd\u0131nc\u0131k, Silifke, Anamur, Bozyaz\u0131 ve Mut\u2019 ta 4.507 ayd\u0131nlatma armat\u00fcr\u00fcn\u00fcn bak\u0131m\u0131n\u0131 ger\u00e7ekle\u015ftiren Toroslar EDA\u015e ekipleri, b\u00f6lgede 10 pano ile 69 trafo ve 197 da\u011f\u0131t\u0131m merkezini de elden ge\u00e7irdi. Ayr\u0131ca kentte 933 Km\u2019lik hatt\u0131n bak\u0131m\u0131 tamamland\u0131. Toroslar EDA\u015e, Mersin\u2019de hizmet verdi\u011fi 1 milyondan fazla m\u00fc\u015fterisine daha iyi hizmet vermek amac\u0131yla toplam 17 kilometrelik yeni yer alt\u0131 hatt\u0131 tesis eden Toroslar EDA\u015e ekipleri, kentte 84 yeni ayd\u0131nlatma armat\u00fcr\u00fcn\u00fcn montaj\u0131n\u0131 yaparken ayr\u0131ca yeni 23 elektrik panosu ve 3 trafo merkezi montaj\u0131 da ger\u00e7ekle\u015ftirdi.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Enerjisa Da\u011f\u0131t\u0131m \u015eirketleri Toroslar EDA\u015e ve Ba\u015fkent EDA\u015e, elektrik da\u011f\u0131t\u0131m\u0131 yapt\u0131klar\u0131 illerde s\u00fcrd\u00fcr\u00fclebilir ve kesintisiz enerji sa\u011flanabilmesi amac\u0131yla 2024 y\u0131l\u0131n\u0131n ilk 3 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":188161,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53],"tags":[19261,15016,4546,3558],"views":57,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/188159"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=188159"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/188159\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/188161"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=188159"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=188159"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=188159"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}