{"id":187772,"date":"2024-05-03T15:24:12","date_gmt":"2024-05-03T12:24:12","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=187772"},"modified":"2024-05-03T15:24:12","modified_gmt":"2024-05-03T12:24:12","slug":"akkuyu-ngs-nin-1inci-unitesinde-calismalar-suruyor","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/akkuyu-ngs-nin-1inci-unitesinde-calismalar-suruyor\/","title":{"rendered":"(Turkish) &#8217;Akkuyu NGS&#8217;nin 1\u2019inci \u00dcnitesinde \u00c7al\u0131\u015fmalar S\u00fcr\u00fcyor&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/187772\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2>Akkuyu N\u00fckleer G\u00fc\u00e7 Santrali\u2019nin (NGS) 1\u2019inci \u00fcnitesinde nakliye kilidi tasar\u0131m konumuna yerle\u015ftirildi. Tesislerin d\u0131\u015f ortamdan izolasyonunu sa\u011flayacak olan kilit, ayn\u0131 zamanda n\u00fckleer malzemelerin ve reakt\u00f6r b\u00f6lmesi ekipmanlar\u0131n\u0131n g\u00fcvenli bir \u015fekilde ta\u015f\u0131nmas\u0131na da yard\u0131mc\u0131 olacak.<\/h2>\n<p style=\"text-align: center;\"><img loading=\"lazy\" class=\"aligncenter wp-image-187775\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/05\/akkuyu-ngs-nin-1inci-unitesinde-calismalar-suruyor-1.jpg\" alt=\"\" width=\"500\" height=\"334\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/05\/akkuyu-ngs-nin-1inci-unitesinde-calismalar-suruyor-1.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/05\/akkuyu-ngs-nin-1inci-unitesinde-calismalar-suruyor-1-300x200.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/05\/akkuyu-ngs-nin-1inci-unitesinde-calismalar-suruyor-1-500x334.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/05\/akkuyu-ngs-nin-1inci-unitesinde-calismalar-suruyor-1-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/05\/akkuyu-ngs-nin-1inci-unitesinde-calismalar-suruyor-1-450x300.jpg 450w\" sizes=\"(max-width: 500px) 100vw, 500px\" \/><\/p>\n<p>Her iki taraf\u0131 kapal\u0131 14 metrelik silindirik bir hazne olan nakliye kilidi, olduk\u00e7a a\u011f\u0131r ve b\u00fcy\u00fck boyutlu bir ekipman olma \u00f6zelli\u011fi ta\u015f\u0131yor. Reakt\u00f6r b\u00f6lmesinin s\u0131zd\u0131rmazl\u0131\u011f\u0131n\u0131 sa\u011flayabilmek i\u00e7in kap\u0131lar\u0131n d\u00f6n\u00fc\u015f\u00fcml\u00fc olarak a\u00e7\u0131lmas\u0131n\u0131 sa\u011flayan\u00a0kilidin a\u011f\u0131rl\u0131\u011f\u0131 <strong>260 tonu, \u00e7ap\u0131 ise 7 metreyi<\/strong> buluyor.<\/p>\n<p>Paletli bir vin\u00e7 kullan\u0131larak monte edilen nakliye kilidi sayesinde Akkuyu NGS uzmanlar\u0131, 1\u2019inci \u00fcnitenin i\u015fletilmesi ve bak\u0131m\u0131 i\u00e7in gerekli olan buhar jenerat\u00f6rlerine, reakt\u00f6r \u00fcst par\u00e7as\u0131na, ana sirk\u00fclasyon pompalar\u0131na, birincil devre boru hatlar\u0131na ve di\u011fer y\u00fcksek teknolojili ekipmanlara g\u00fcvenli bir \u015fekilde ula\u015fabilecek. Santralin \u00e7al\u0131\u015fma a\u015famas\u0131nda, kullan\u0131lm\u0131\u015f n\u00fckleer yak\u0131t i\u00e7eren konteynerler, taze yak\u0131tlar\u0131n bulundu\u011fu variller ile ta\u015f\u0131ma ve i\u015fleme ekipmanlar\u0131\u00a0nakliye kilidinden ta\u015f\u0131nacak.<\/p>\n<p>\u00dcr\u00fcn, yaln\u0131zca yetkili personelin i\u00e7 mek\u00e2na eri\u015fimini sa\u011flamak i\u00e7in \u00f6zel eri\u015fim kontrol sistemleriyle donat\u0131ld\u0131.<\/p>\n<p>\u0130yonla\u015ft\u0131r\u0131c\u0131 radyasyon dedekt\u00f6rleri de g\u00fcvenilir ve emniyetli \u00e7al\u0131\u015fmay\u0131 s\u00fcrd\u00fcrmek i\u00e7in kilidin i\u00e7erisine yerle\u015ftirilmi\u015f durumda. Ekipman bak\u0131m ve onar\u0131m\u0131 i\u00e7in de kullan\u0131larak zamandan tasarruf edilmesine yard\u0131mc\u0131 olacak olan nakliye kilidi, Akkuyu NGS&#8217;nin daha verimli \u00e7al\u0131\u015fmas\u0131na destek olacak.<\/p>\n<p>Konuya ili\u015fkin a\u00e7\u0131klama yapan <strong>Akkuyu NGS Genel M\u00fcd\u00fcr Birinci Yard\u0131mc\u0131s\u0131 ve NGS Yap\u0131 \u0130\u015fleri Direkt\u00f6r\u00fc Sergey Butckikh<\/strong>,<em>\u00a0\u201c\u00d6nemli bir teknolojik operasyonu daha tamamlad\u0131k. Nakliye kilidi, reakt\u00f6r\u00fcn i\u00e7 koruma kabu\u011funun g\u00fcc\u00fcn\u00fc b\u00fcy\u00fck \u00f6l\u00e7\u00fcde art\u0131ran, g\u00fc\u00e7l\u00fc metal kablolardan olu\u015fuyor. \u00d6n\u00fcm\u00fczdeki g\u00fcnlerde ekipman\u0131n \u00f6n gerilme testlerine ba\u015flamay\u0131 planl\u0131yoruz. Bu, Akkuyu NGS projesindeki Rus ve T\u00fcrk uzmanlar\u0131n koordineli ve yo\u011fun emek harcayarak ger\u00e7ekle\u015ftirdikleri \u00e7al\u0131\u015fmalar\u0131n bir sonucudur.\u201d<\/em>\u00a0dedi.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Akkuyu N\u00fckleer G\u00fc\u00e7 Santrali\u2019nin (NGS) 1\u2019inci \u00fcnitesinde nakliye kilidi tasar\u0131m konumuna yerle\u015ftirildi. Tesislerin d\u0131\u015f ortamdan izolasyonunu sa\u011flayacak olan kilit, ayn\u0131 zamanda n\u00fckleer [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":187774,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,43],"tags":[3019,1303,113713,19356],"views":25,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/187772"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=187772"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/187772\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/187774"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=187772"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=187772"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=187772"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}