{"id":187599,"date":"2024-04-29T16:35:30","date_gmt":"2024-04-29T13:35:30","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=187599"},"modified":"2024-04-29T16:40:22","modified_gmt":"2024-04-29T13:40:22","slug":"konya-selcuklu-belediyesi-arazi-ges-projesi-enerji-uretimine-basladi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/konya-selcuklu-belediyesi-arazi-ges-projesi-enerji-uretimine-basladi\/","title":{"rendered":"(Turkish) Konya Sel\u00e7uklu Belediyesi Arazi GES Projesi Enerji \u00dcretimine Ba\u015flad\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/187599\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2>Konya\u2019da Sel\u00e7uklu Belediyesi\u2019nin enerji verimlili\u011fi ve \u00e7evre koruma faaliyetleri kapsam\u0131nda yapt\u0131\u011f\u0131 \u00e7al\u0131\u015fmalar\u0131ndan biri olan Ba\u011fr\u0131kurt G\u00fcne\u015f Enerjisi Santrali (GES) projesi enerji \u00fcretimine ba\u015flad\u0131.<\/h2>\n<p style=\"text-align: center;\"><img loading=\"lazy\" class=\"aligncenter wp-image-187602\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/04\/konya-selcuklu-belediyesi-arazi-ges-projesi-enerji-uretimine-basladi.jpg\" alt=\"\" width=\"500\" height=\"317\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/04\/konya-selcuklu-belediyesi-arazi-ges-projesi-enerji-uretimine-basladi.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/04\/konya-selcuklu-belediyesi-arazi-ges-projesi-enerji-uretimine-basladi-300x190.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/04\/konya-selcuklu-belediyesi-arazi-ges-projesi-enerji-uretimine-basladi-500x317.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/04\/konya-selcuklu-belediyesi-arazi-ges-projesi-enerji-uretimine-basladi-80x50.jpg 80w\" sizes=\"(max-width: 500px) 100vw, 500px\" \/><\/p>\n<p>Konya Sel\u00e7uklu Belediyesi taraf\u0131ndan Ba\u011fr\u0131kurt Mahallesi\u2019nde <strong>45 bin metrekare<\/strong> alan \u00fczerine yap\u0131m\u0131 tamamlanan Ba\u011fr\u0131kurt G\u00fcne\u015f Enerjisi Santralinde elektrik \u00fcretimi ba\u015flat\u0131ld\u0131. Hem do\u011fa dostu olan hem de ekonomiye katk\u0131 sa\u011flayan bu projede \u00fcretilen enerji sayesinde Sel\u00e7uklu Belediyesi ekonomik olarak k\u00e2ra ge\u00e7erken belediye taraf\u0131ndan vatanda\u015fa hizmet verilen alanlar\u0131n da elektrik ihtiyac\u0131n\u0131<strong> y\u00fczde 90<\/strong> oran\u0131nda kar\u015f\u0131layacak.<\/p>\n<p>Her biri <strong>500Wp<\/strong> g\u00fcce sahip toplam <strong>7 bin 250 adet paneli<\/strong> b\u00fcnyesinde bulundurarak Sel\u00e7uklu\u2019ya enerji anlam\u0131nda de\u011fer katan ve y\u0131ll\u0131k toplamda <strong>5.760.000 kWh (5.760 MWh)<\/strong> g\u00fcc\u00fcnde elektrik \u00fcretilecek olan tesisle birlikte, Hizmet Binas\u0131 ve Konya Tropikal Kelebek Bah\u00e7esi\u2019nde de kurulan GES projeleriyle y\u0131ll\u0131k toplam <strong>6.847.500 kWh (6.847,5 MWh)<\/strong> elektrik \u00fcretimi yap\u0131lm\u0131\u015f olacak. Yine ye\u015fil bina stat\u00fcs\u00fcnde olan <strong>Yeni Nesil \u015eehir K\u00fct\u00fcphanesi de 60 kW<\/strong> g\u00fc\u00e7te enerji \u00fcretimi ile katk\u0131 sa\u011fl\u0131yor. Sel\u00e7uklu Belediyesi taraf\u0131ndan yap\u0131m\u0131 s\u00fcren <strong>T\u00fcrkiye\u2019nin ilk Ye\u015fil Sertifikal\u0131 (LEED) Sporcu Yeti\u015ftirme Merkezi de<\/strong> hizmet vermeye ba\u015flad\u0131\u011f\u0131nda kendi enerjisini \u00fcreterek hem do\u011faya hem de ekonomiye katk\u0131 sa\u011flayacak.<\/p>\n<p>Sel\u00e7uklu Belediye Ba\u015fkan\u0131 Ahmet Pekyat\u0131rmac\u0131, gelecek nesillere temiz bir \u00e7evre b\u0131rakmak i\u00e7in <strong>enerji verimlili\u011fine \u00f6nem verdiklerini<\/strong> a\u00e7\u0131klad\u0131. <strong>G\u00fcne\u015f Enerji Santralleri (GES) projelerinin<\/strong> \u00f6nemini vurgulayan Pekyat\u0131rmac\u0131, belediye tesislerinin enerji ihtiyac\u0131n\u0131n b\u00fcy\u00fck k\u0131sm\u0131n\u0131 g\u00fcne\u015f enerjisi ile kar\u015f\u0131lamay\u0131 hedeflediklerini s\u00f6yledi.<\/p>\n<p>Mevcut projeler kapsam\u0131nda belediye binas\u0131, <strong>Tropikal Kelebek Bah\u00e7esi<\/strong> ve <strong>Yeni Nesil \u015eehir K\u00fct\u00fcphanesi<\/strong>&#8216;nin <strong>\u00e7at\u0131lar\u0131na GES kuruldu\u011funu<\/strong> belirten Pekyat\u0131rmac\u0131, en kapsaml\u0131 projelerinin ise <strong>Ba\u011fr\u0131kurt G\u00fcne\u015f Enerjisi Santralleri<\/strong> oldu\u011funu ifade etti. Bu santraller sayesinde belediye tesislerinin <strong>y\u00fczde 90<\/strong>&#8216;l\u0131k enerji ihtiyac\u0131n\u0131n kar\u015f\u0131land\u0131\u011f\u0131n\u0131 ve y\u0131ll\u0131k <strong>85.600 a\u011fac\u0131n kesilmesi<\/strong> ile <strong>4.534 ton CO2 sal\u0131n\u0131m\u0131n\u0131n<\/strong> engellendi\u011fini aktard\u0131. Ayr\u0131ca \u00fcretilen elektri\u011fin <strong>2 bin 283 hanenin<\/strong> y\u0131ll\u0131k ihtiyac\u0131na denk geldi\u011fini ve <strong>g\u00fcnl\u00fck 20-30 bin TL<\/strong>, ayl\u0131k ortalama ise<strong> 1 milyon TL<\/strong> gelir sa\u011flad\u0131\u011f\u0131n\u0131 kaydetti.<\/p>\n<p>Emrecan Y\u00dcCEL \u2013 Enerji Sistemleri M\u00fchendisi \u2013\u00a0<a href=\"mailto:emrecan.yucel@enerjigazetesi.ist\" target=\"_blank\" rel=\"noopener\">emrecan.yucel@enerjigazetesi.ist<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Konya\u2019da Sel\u00e7uklu Belediyesi\u2019nin enerji verimlili\u011fi ve \u00e7evre koruma faaliyetleri kapsam\u0131nda yapt\u0131\u011f\u0131 \u00e7al\u0131\u015fmalar\u0131ndan biri olan Ba\u011fr\u0131kurt G\u00fcne\u015f Enerjisi Santrali (GES) projesi enerji \u00fcretimine [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":187602,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49],"tags":[113653,113652,2206,2441,17215],"views":74,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/187599"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=187599"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/187599\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/187602"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=187599"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=187599"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=187599"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}