{"id":187245,"date":"2024-04-21T20:10:21","date_gmt":"2024-04-21T17:10:21","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=187245"},"modified":"2024-04-21T20:16:31","modified_gmt":"2024-04-21T17:16:31","slug":"ankara-da-faaliyet-gosteren-guven-saglik-grubu-ndan-arazi-ges-yatirimi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/ankara-da-faaliyet-gosteren-guven-saglik-grubu-ndan-arazi-ges-yatirimi\/","title":{"rendered":"(Turkish) Ankara\u2019da Faaliyet G\u00f6steren G\u00fcven Sa\u011fl\u0131k Grubu\u2019ndan Arazi GES Yat\u0131r\u0131m\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/187245\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2>Ankara\u2019da Faaliyet G\u00f6steren G\u00fcven Sa\u011fl\u0131k Grubu\u2019na ba\u011fl\u0131 G\u00fcven Hastaneleri, iki adet GES projesi ile sa\u011fl\u0131k sekt\u00f6r\u00fcnde \u00e7evre dostu enerji kullan\u0131m\u0131nda \u00f6nc\u00fc olmay\u0131 hedefliyor.<\/h2>\n<p style=\"text-align: center;\"><img loading=\"lazy\" class=\"aligncenter wp-image-187248\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/04\/ankara-da-faaliyet-gosteren-guven-saglik-grubu-ndan-arazi-ges-yatirimi.jpg\" alt=\"\" width=\"500\" height=\"281\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/04\/ankara-da-faaliyet-gosteren-guven-saglik-grubu-ndan-arazi-ges-yatirimi.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/04\/ankara-da-faaliyet-gosteren-guven-saglik-grubu-ndan-arazi-ges-yatirimi-300x169.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/04\/ankara-da-faaliyet-gosteren-guven-saglik-grubu-ndan-arazi-ges-yatirimi-500x281.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/04\/ankara-da-faaliyet-gosteren-guven-saglik-grubu-ndan-arazi-ges-yatirimi-80x45.jpg 80w\" sizes=\"(max-width: 500px) 100vw, 500px\" \/><\/p>\n<p>Ankara&#8217;n\u0131n \u00c7ubuk ve \u015eerefliko\u00e7hisar b\u00f6lgelerini kapsayan G\u00fcven Hastanesi, toplam 6 milyon dolarl\u0131k yat\u0131r\u0131m ile yenilenebilir ve s\u00fcrd\u00fcr\u00fclebilir enerji alan\u0131nda b\u00fcy\u00fck ad\u0131m at\u0131yor.<\/p>\n<p>Hastaneden yap\u0131lan a\u00e7\u0131klamaya g\u00f6re, bu iki projede <strong>\u00c7ubuk GES<\/strong> Ayranc\u0131 G\u00fcven Hastanesi&#8217;nin, <strong>\u015eerefliko\u00e7hisar GES<\/strong> ise G\u00fcven Hastanesi \u00c7ayyolu Kamp\u00fcs\u00fc&#8217;n\u00fcn enerji ihtiyac\u0131n\u0131 tamamen yenilenebilir kaynaklardan sa\u011flamak \u00fczere hayata ge\u00e7iriliyor.<\/p>\n<p>\u00c7ubuk&#8217;ta 80 d\u00f6n\u00fcm arazi \u00fczerine in\u015fa edilen GES projesi,<strong> 6 MW<\/strong> kurulu g\u00fcc\u00fc ile Ayranc\u0131 G\u00fcven Hastanesi\u2019nin y\u0131ll\u0131k enerji t\u00fcketiminin b\u00fcy\u00fck bir k\u0131sm\u0131n\u0131 kar\u015f\u0131layacak kapasiteye sahip olmas\u0131yla birlikte, \u015eerefliko\u00e7hisar&#8217;daki 30 d\u00f6n\u00fcm arazi \u00fczerinde yer alan GES projesi ise<strong> 1 MW<\/strong> g\u00fc\u00e7 kapasitesi ile \u00c7ayyolu Kamp\u00fcs\u00fcn\u00fcn elektrik ihtiyac\u0131n\u0131 kar\u015f\u0131layarak, enerji maliyetlerini d\u00fc\u015f\u00fcrmeyi ve \u00e7evresel ayak izini azaltmay\u0131 ama\u00e7l\u0131yor.<\/p>\n<p>Son onaylar\u0131 bekleyen santraller, May\u0131s ay\u0131nda operasyonel hale gelecek.<\/p>\n<p>Tamamlanan in\u015faatlar\u0131n ard\u0131ndan son onaylar\u0131 bekleyen santraller, may\u0131s ay\u0131nda i\u015fletmeye al\u0131nacak. Hastane y\u00f6netimi, yenilik\u00e7i ve \u00e7evre dostu yat\u0131r\u0131mlarla sekt\u00f6rdeki di\u011fer kurumlara ilham vererek, sa\u011fl\u0131k hizmetlerinde s\u00fcrd\u00fcr\u00fclebilirlik standartlar\u0131n\u0131 y\u00fckseltmeyi ama\u00e7l\u0131yor.<\/p>\n<p>Emrecan Y\u00dcCEL \u2013 Enerji Sistemleri M\u00fchendisi \u2013\u00a0<a href=\"mailto:emrecan.yucel@enerjigazetesi.ist\" target=\"_blank\" rel=\"noopener\">emrecan.yucel@enerjigazetesi.ist<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Ankara\u2019da Faaliyet G\u00f6steren G\u00fcven Sa\u011fl\u0131k Grubu\u2019na ba\u011fl\u0131 G\u00fcven Hastaneleri, iki adet GES projesi ile sa\u011fl\u0131k sekt\u00f6r\u00fcnde \u00e7evre dostu enerji kullan\u0131m\u0131nda \u00f6nc\u00fc olmay\u0131 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":187248,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49],"tags":[113519,7440,29013,2206,26729,113518,113517,113520],"views":61,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/187245"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=187245"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/187245\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/187248"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=187245"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=187245"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=187245"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}