{"id":186967,"date":"2024-04-15T21:38:39","date_gmt":"2024-04-15T18:38:39","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=186967"},"modified":"2024-04-15T21:38:39","modified_gmt":"2024-04-15T18:38:39","slug":"akkuyu-ngs-nin-1-inci-guc-unitesinde-calismalar-suruyor","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/akkuyu-ngs-nin-1-inci-guc-unitesinde-calismalar-suruyor\/","title":{"rendered":"(Turkish) &#8217;Akkuyu NGS&#8217;nin 1\u2019inci G\u00fc\u00e7 \u00dcnitesinde \u00c7al\u0131\u015fmalar S\u00fcr\u00fcyor"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/186967\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2>Mersin&#8217;de in\u015fa edilen Akkuyu N\u00fckleer G\u00fc\u00e7 Santrali&#8217;nin (NGS) 1&#8217;inci G\u00fc\u00e7 \u00dcnitesi\u2019nde bir ba\u015fka \u00f6nemli a\u015fama olan ba\u015flatma ve ayarlama \u00e7al\u0131\u015fmalar\u0131 ba\u015flad\u0131.<\/h2>\n<p style=\"text-align: center;\"><img loading=\"lazy\" class=\"aligncenter wp-image-186969\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/04\/akkuyu-ngs-nin-1-inci-guc-unitesinde-calismalar-suruyor.jpg\" alt=\"\" width=\"500\" height=\"334\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/04\/akkuyu-ngs-nin-1-inci-guc-unitesinde-calismalar-suruyor.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/04\/akkuyu-ngs-nin-1-inci-guc-unitesinde-calismalar-suruyor-300x200.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/04\/akkuyu-ngs-nin-1-inci-guc-unitesinde-calismalar-suruyor-500x334.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/04\/akkuyu-ngs-nin-1-inci-guc-unitesinde-calismalar-suruyor-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/04\/akkuyu-ngs-nin-1-inci-guc-unitesinde-calismalar-suruyor-450x300.jpg 450w\" sizes=\"(max-width: 500px) 100vw, 500px\" \/><\/p>\n<p>\u0130n\u015faat sahas\u0131na \u00e7al\u0131\u015fma ziyaretinde bulunan Rusya Devlet N\u00fckleer Enerji Kurulu\u015fu<strong> Rosatom&#8217;un Genel M\u00fcd\u00fcr\u00fc Aleksey Likhachev<\/strong>, \u00e7al\u0131\u015fmalar\u0131n gidi\u015fat\u0131 hakk\u0131nda bilgi ald\u0131.<\/p>\n<p><strong>Rosatom Genel M\u00fcd\u00fcr\u00fc Aleksey Likhachev<\/strong> liderli\u011findeki Rosatom y\u00f6neticilerinden olu\u015fan bir heyet in\u015faat sahas\u0131n\u0131 gezerek 1&#8217;inci \u00dcnite&#8217;de bulunan <strong>n\u00fckleer ve t\u00fcrbin adas\u0131 tesisleri<\/strong> ile <strong>Akkuyu NGS<\/strong>&#8216;nin <strong>k\u0131y\u0131 hidroteknik yap\u0131lar\u0131n\u0131<\/strong> inceledi. \u0130ncelemelerin ard\u0131ndan Rosatom Genel M\u00fcd\u00fcr\u00fc Aleksey Likhachev, projenin uygulanmas\u0131na ili\u015fkin temel hususlar\u0131 ayr\u0131nt\u0131l\u0131 olarak ele almak \u00fczere <strong>AKKUYU N\u00dcKLEER A.\u015e. Genel M\u00fcd\u00fcr\u00fc Anastasia Zoteeva<\/strong> ve <strong>di\u011fer proje y\u00f6neticileriyle<\/strong> bir araya geldi.<\/p>\n<p><strong>Rosatom Genel M\u00fcd\u00fcr\u00fc Aleksey Likhachev<\/strong>, 1&#8217;inci \u00dcnite&#8217;de \u00e7al\u0131\u015fmalar\u0131n gidi\u015fat\u0131na ili\u015fkin \u015funlar\u0131 s\u00f6yledi: \u201c<em>N\u00fckleer ada alan\u0131nda i\u015fler\u00a0takvime uygun\u00a0ilerliyor.\u00a0Bu y\u0131l b\u00fct\u00fcn sistemleri kontrol edece\u011fiz, bunlar aras\u0131nda ilk \u00e7evrim sistemleri\u00a0de\u00a0yer al\u0131yor. <strong>Hidrolik testleri ger\u00e7ekle\u015ftirece\u011fiz<\/strong> ve <strong>yak\u0131t sim\u00fclat\u00f6rlerini<\/strong> reakt\u00f6re y\u00fckleyece\u011fiz. Akkuyu NGS 1&#8217;inci \u00dcnitesinin \u00f6n\u00fcm\u00fczdeki y\u0131l T\u00fcrkiye enerji sistemine dahil olmas\u0131 i\u00e7in elimizden geleni yap\u0131yoruz. B\u00fct\u00fcn \u00e7abalar\u0131m\u0131z ve T\u00fcrk \u015firketlerinin \u00e7al\u0131\u015fmalar\u0131 buna y\u00f6nelik\u00a0olarak\u00a0devam ediyor. Projede bir\u00e7ok T\u00fcrk \u015firketi yer alarak b\u00fcy\u00fck bir profesyonellik ve bir o kadar da ba\u015far\u0131l\u0131 mobilizasyon g\u00f6steriyorlar.\u201d<\/em><\/p>\n<p><strong>Ba\u015flatma ve ayarlama \u00e7al\u0131\u015fmalar\u0131<\/strong> NGS g\u00fc\u00e7 \u00fcnitesi in\u015faat\u0131n\u0131n son a\u015famas\u0131n\u0131 te\u015fkil ediyor. Bu a\u015fama, santralin g\u00fcvenilir bir \u015fekilde \u00e7al\u0131\u015fmas\u0131n\u0131 sa\u011flamak \u00fczere <strong>ayarlama, kontrol ve test i\u015flemlerini<\/strong> kaps\u0131yor. Ba\u015flatma ve ayarlama i\u015flemlerinin bir di\u011fer \u00f6nemli amac\u0131n\u0131 da <strong>\u00e7e\u015fitli sistem<\/strong> ve <strong>ekipmanlar\u0131n<\/strong> i\u015fletmeye al\u0131nmas\u0131ndan \u00f6nce tasar\u0131m parametrelerine ula\u015fmak olu\u015fturuyor.<\/p>\n<p>Akkuyu NGS uzmanlar\u0131 bu \u00e7al\u0131\u015fmalar kapsam\u0131nda yak\u0131t depolama havuzunun hidrolik testlerini ba\u015far\u0131yla ger\u00e7ekle\u015ftirdi. Uzmanlar halihaz\u0131rda<strong> reakt\u00f6re yak\u0131t y\u00fckleme<\/strong> ve <strong>bo\u015faltma i\u015flemlerinde<\/strong> kullan\u0131lacak <strong>yeniden y\u00fckleme makinesinin montaj\u0131n\u0131<\/strong> yap\u0131yor. Ana sirk\u00fclasyon pompa \u00fcnitelerinin elektrik motorlar\u0131n\u0131n montaj\u0131 t\u00fcm h\u0131z\u0131yla devam ediyor. K\u0131sa s\u00fcre i\u00e7inde muhafaza \u00f6ngerme sisteminin \u00e7elik halatlar\u0131n\u0131 germek i\u00e7in \u00f6nemli bir operasyon ger\u00e7ekle\u015ftirilecek. Bu sistem reakt\u00f6r binas\u0131n\u0131n sa\u011flaml\u0131\u011f\u0131n\u0131 ve g\u00fcvenilirli\u011fini \u00f6nemli \u00f6l\u00e7\u00fcde art\u0131racak. Akkuyu NGS sahas\u0131nda in\u015fa edilen<strong> g\u00fc\u00e7 \u00fcnitelerinin<\/strong> ana tesislerindeki \u00e7al\u0131\u015fmalara paralel olarak, yard\u0131mc\u0131 altyap\u0131 da planland\u0131\u011f\u0131 \u015fekilde devreye al\u0131n\u0131yor ve santral binalar\u0131 in\u015fa ediliyor. <strong>D\u00f6rt grup NGS operat\u00f6r\u00fcn\u00fcn<\/strong>\u00a0e\u011fitimlerini tamamlam\u0131\u015f olduklar\u0131 <strong>e\u011fitim merkezinin ilk a\u015famas\u0131<\/strong>\u00a0ve\u00a0<strong>taze yak\u0131t depolama tesisi<\/strong> normal seyrinde \u00e7al\u0131\u015f\u0131yor. \u0130n\u015fa edilen n\u00fckleer santralin <strong>i\u015fletme at\u00f6lyeleri<\/strong> a\u015famal\u0131 olarak tamamlan\u0131yor. <strong>Kimyasal su ar\u0131tma tesislerinin, buhar tedarik sisteminin, termal boru hatt\u0131 sisteminin<\/strong> in\u015faat\u0131 da tamamlan\u0131rken birinci g\u00fc\u00e7 \u00fcnitesinin <strong>pompa istasyonunda ekipmanlar<\/strong> monte edilerek <strong>ana vin\u00e7 mekanizmalar\u0131<\/strong> i\u015fletmeye al\u0131nd\u0131.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Mersin&#8217;de in\u015fa edilen Akkuyu N\u00fckleer G\u00fc\u00e7 Santrali&#8217;nin (NGS) 1&#8217;inci G\u00fc\u00e7 \u00dcnitesi\u2019nde bir ba\u015fka \u00f6nemli a\u015fama olan ba\u015flatma ve ayarlama \u00e7al\u0131\u015fmalar\u0131 ba\u015flad\u0131. \u0130n\u015faat [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":186969,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,43],"tags":[3019,1303,113402,19356],"views":28,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/186967"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=186967"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/186967\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/186969"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=186967"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=186967"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=186967"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}