{"id":186856,"date":"2024-04-09T13:22:56","date_gmt":"2024-04-09T10:22:56","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=186856"},"modified":"2024-04-09T13:22:56","modified_gmt":"2024-04-09T10:22:56","slug":"akfen-yenilenebilir-enerji-uc-hibrit-ges-yatirimi-anlasmasini-duyurdu","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/akfen-yenilenebilir-enerji-uc-hibrit-ges-yatirimi-anlasmasini-duyurdu\/","title":{"rendered":"(Turkish) &#8217;Akfen Yenilenebilir Enerji&#8217; \u00dc\u00e7 Hibrit GES Yat\u0131r\u0131m\u0131 Anla\u015fmas\u0131n\u0131 Duyurdu"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/186856\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2><strong>Akfen Yenilenebilir Enerji, yerli ve yenilenebilir kaynaklardan enerji sa\u011flayan 700 MW&#8217;l\u0131k kurulu g\u00fcc\u00fcn\u00fc, Denizli ve \u00c7anakkale&#8217;de 3 yeni Hibrit G\u00fcne\u015f Enerjisi Santrali (GES) projesi ile 20 MW art\u0131racak.<\/strong><\/h2>\n<p style=\"text-align: center;\"><img loading=\"lazy\" class=\"aligncenter wp-image-186859\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/04\/akfen-yenilenebilir-enerji-uc-hibrit-ges-yatirimi-anlasmasini-duyurdu-1.jpg\" alt=\"\" width=\"500\" height=\"345\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/04\/akfen-yenilenebilir-enerji-uc-hibrit-ges-yatirimi-anlasmasini-duyurdu-1.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/04\/akfen-yenilenebilir-enerji-uc-hibrit-ges-yatirimi-anlasmasini-duyurdu-1-300x207.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/04\/akfen-yenilenebilir-enerji-uc-hibrit-ges-yatirimi-anlasmasini-duyurdu-1-500x345.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/04\/akfen-yenilenebilir-enerji-uc-hibrit-ges-yatirimi-anlasmasini-duyurdu-1-72x50.jpg 72w\" sizes=\"(max-width: 500px) 100vw, 500px\" \/><\/p>\n<p><strong>G\u00fcne\u015f, su ve r\u00fczg\u00e2r<\/strong> olarak sadece yerli ve yenilenebilir kaynaklardan \u00fcretim yapan <strong>700 MW\u2019l\u0131k kurulu g\u00fcce sahip<\/strong> <strong>Akfen Yenilenebilir Enerji<\/strong>, daha \u00f6nce a\u00e7\u0131klad\u0131\u011f\u0131 yat\u0131r\u0131m plan\u0131 kapsam\u0131nda <strong>art arda yeni yat\u0131r\u0131mlar\u0131<\/strong> hayata ge\u00e7iriyor.<\/p>\n<p>\u015eirket, b\u00fcy\u00fcme stratejisi kapsam\u0131nda, <strong>Denizli ve \u00c7anakkale\u2019de<\/strong> yakla\u015f\u0131k <strong>20 MW b\u00fcy\u00fckl\u00fc\u011f\u00fcnde 3 Hibrit GES<\/strong> <strong>projesi<\/strong> i\u00e7in s\u00f6zle\u015fme imzalad\u0131\u011f\u0131n\u0131 ve in\u015faat s\u00fcrecinin ba\u015flad\u0131\u011f\u0131n\u0131 duyurdu.<\/p>\n<p><strong>Akfen Yenilenebilir Enerji taraf\u0131ndan yap\u0131lan a\u00e7\u0131klamada\u00a0<\/strong>m\u00fcteahhit <strong>Asunim Yenilenebilir Enerji<\/strong> \u015firketi ile Denizli ilinde yer alan <strong>6.37 MW<\/strong>\u2019l\u0131k Denizli Hibrit GES ile \u00c7anakkale ilinde yer alan <strong>4.96<\/strong> MW\u2019l\u0131k Kocalar Hibrit GES ve<strong> 8.4 MW<\/strong>\u2019l\u0131k Hasanoba Hibrit GES yat\u0131r\u0131m\u0131 hayata ge\u00e7irilmesi i\u00e7in anla\u015fma sa\u011fland\u0131.<\/p>\n<h3><strong>66 MW\u2019LIK H\u0130BR\u0130T GES <\/strong><strong>PROJES\u0130N\u0130N \u0130N\u015eA S\u00dcREC\u0130 BA\u015eLADI<\/strong><\/h3>\n<p>A\u00e7\u0131klamada al\u0131nan te\u015fvikler kapsam\u0131nda KDV, g\u00fcmr\u00fck ve damga vergisi istisnas\u0131 sa\u011fland\u0131\u011f\u0131 duyurulan yeni hibrit GES santrallerinin, \u00fczerinde kurulaca\u011f\u0131 tesisin kalan <strong>&#8220;Yenilenebilir Enerji Kaynaklar\u0131 Destekleme Mekanizmas\u0131 (YEKDEM)&#8221;<\/strong> s\u00fcresi boyunca, YEKDEM&#8217;den faydalanarak, <strong>ABD Dolar\u0131 bazl\u0131 sabit fiyat garantisinden faydalan\u0131laca\u011f\u0131na<\/strong> dikkat \u00e7ekildi.<\/p>\n<p>A\u00e7\u0131klamada, <em>\u201c\u0130n\u015faat s\u00fcreci ba\u015flam\u0131\u015f olan toplam <strong>66 MW<\/strong> hibrit GES projelerimiz ile birlikte, mevcut <strong>699 MW<\/strong> kurulu g\u00fcc\u00fcm\u00fcz\u00fc toplam <strong>785 MW<\/strong>&#8216;a \u00e7\u0131karacak Hibrit GES projeleri yat\u0131r\u0131mlar\u0131m\u0131z\u0131n \u015firketimiz \u00f6ng\u00f6r\u00fclebilir nakit ak\u0131\u015f\u0131na dayal\u0131 risk y\u00f6netimi politikas\u0131 ile uyumlu olarak nakit ak\u0131\u015flar\u0131m\u0131za gelecekte pozitif katk\u0131 sa\u011flamas\u0131 beklenmekte olup, s\u00f6z konusu yat\u0131r\u0131mlar\u0131n 2025 y\u0131l\u0131nda \u015firketimizin ciro ve faaliyet kar\u0131na katk\u0131 sa\u011flamas\u0131 \u00f6ng\u00f6r\u00fclmektedir\u201d<\/em> ifadelerine yer verildi.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Akfen Yenilenebilir Enerji, yerli ve yenilenebilir kaynaklardan enerji sa\u011flayan 700 MW&#8217;l\u0131k kurulu g\u00fcc\u00fcn\u00fc, Denizli ve \u00c7anakkale&#8217;de 3 yeni Hibrit G\u00fcne\u015f Enerjisi Santrali [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":186858,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49],"tags":[28245,113369,113368,113367],"views":36,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/186856"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=186856"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/186856\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/186858"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=186856"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=186856"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=186856"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}