{"id":186617,"date":"2024-04-03T16:32:04","date_gmt":"2024-04-03T13:32:04","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=186617"},"modified":"2024-04-03T16:32:04","modified_gmt":"2024-04-03T13:32:04","slug":"aedas-antalya-da-enerji-altyapisini-guclendirdi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/aedas-antalya-da-enerji-altyapisini-guclendirdi\/","title":{"rendered":"(Turkish) &#8217;AEDA\u015e&#8217; Antalya\u2019da Enerji Altyap\u0131s\u0131n\u0131 G\u00fc\u00e7lendirdi"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/186617\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2>Akdeniz Elektrik Da\u011f\u0131t\u0131m A\u015e (AEDA\u015e), ge\u00e7en y\u0131l yapt\u0131\u011f\u0131 yat\u0131r\u0131mlarla Antalya Merkez, Aksu, D\u00f6\u015femealt\u0131, Kemer, Kepez, Konyaalt\u0131 ve Muratpa\u015fa\u2019y\u0131 kapsayan b\u00f6lgede enerji altyap\u0131s\u0131n\u0131 g\u00fc\u00e7lendirdi. \u015eirketten yap\u0131lan a\u00e7\u0131klamaya g\u00f6re, AEDA\u015e, hizmet b\u00f6lgesindeki her noktaya kesintisiz ve kaliteli elektrik da\u011f\u0131t\u0131m hizmeti sunmak i\u00e7in, g\u00f6rev alan\u0131 kapsam\u0131na giren her b\u00f6lgeye \u00f6zel yat\u0131r\u0131m, bak\u0131m ve onar\u0131m \u00e7al\u0131\u015fmalar\u0131 yap\u0131yor.<\/h2>\n<p style=\"text-align: center;\"><img loading=\"lazy\" class=\"aligncenter wp-image-186619\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/04\/aedas-antalya-da-enerji-altyapisini-guclendirdi.jpg\" alt=\"\" width=\"500\" height=\"281\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/04\/aedas-antalya-da-enerji-altyapisini-guclendirdi.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/04\/aedas-antalya-da-enerji-altyapisini-guclendirdi-300x169.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/04\/aedas-antalya-da-enerji-altyapisini-guclendirdi-500x281.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/04\/aedas-antalya-da-enerji-altyapisini-guclendirdi-80x45.jpg 80w\" sizes=\"(max-width: 500px) 100vw, 500px\" \/><\/p>\n<p>Bu \u00e7er\u00e7evede 2023&#8217;te Antalya Merkez, Aksu, D\u00f6\u015femealt\u0131, Kemer, Kepez, Konyaalt\u0131 ve Muratpa\u015fa&#8217;n\u0131n enerji altyap\u0131s\u0131n\u0131 g\u00fc\u00e7lendirmek i\u00e7in <strong>128 yeni trafo merkezi<\/strong> kuran AEDA\u015e, <strong>2,358 ayd\u0131nlatma dire\u011fi<\/strong> yat\u0131r\u0131m\u0131 yaparken, <strong>6,906 armat\u00fcr\u00fc<\/strong> yeniledi.<\/p>\n<p>AEDA\u015e Metropol B\u00f6lge M\u00fcd\u00fcrl\u00fc\u011f\u00fc&#8217;ne ba\u011fl\u0131 olan il\u00e7elerde ayr\u0131ca <strong>1526<\/strong> al\u00e7ak gerilim, <strong>862<\/strong> orta gerilim dire\u011fi dikildi, <strong>483 kilometre yeni \u015febeke tesis yat\u0131r\u0131m\u0131<\/strong> da hayata ge\u00e7irildi. Ayr\u0131ca Aksu \u0130l\u00e7esi&#8217;nin Alt\u0131nta\u015f B\u00f6lgesi&#8217;nin tamam\u0131na y\u00f6nelik enerji arz\u0131n\u0131 sa\u011flayabilmek i\u00e7in TE\u0130A\u015e Trafo Merkezi&#8217;nden orta gerilim fider tesis \u00e7al\u0131\u015fmalar\u0131na ba\u015fland\u0131. \u015eirket, 35 kilometre yeralt\u0131 kablolu orta gerilim \u015febekesinin y\u00fczde 50&#8217;lik k\u0131sm\u0131n\u0131 tamamlad\u0131 ve yeralt\u0131 kablolu al\u00e7ak gerilim ve ayd\u0131nlatma \u015febekesi ile <strong>20<\/strong> adet <strong>1600 kilovolt-amper (kVA) trafo<\/strong> b\u00f6lgesi yapt\u0131. Bunlar\u0131n yan\u0131 s\u0131ra Ye\u015filkaraman Mahallesinde 3, Gaziler Mahallesinde 2, \u0130hsaniye, Karag\u00f6z, Kur\u015funlu, P\u0131narl\u0131, Y\u00f6r\u00fckler ve Yurtp\u0131nar Mahallelerinde 1&#8217;er ilave trafo b\u00f6lgesi tesisi, \u015febekenin yenilenmesi ve kapasite art\u0131\u015f\u0131 yap\u0131ld\u0131. AEDA\u015e ayr\u0131ca bu y\u0131l i\u00e7in Aksu il\u00e7esi genelinde, 435 yeni ayd\u0131nlatma dire\u011fi, 6 kilometre havai al\u00e7ak gerilim \u015febekesi, 12 kilometre AG+OG havai \u015febeke, 13 kilometre yeralt\u0131 al\u00e7ak gerilim \u015febekesi ve 12 kilometre yeralt\u0131 orta gerilim \u015febekesi tesisi planlad\u0131.<\/p>\n<p>\u015eirket, D\u00f6\u015femealt\u0131 \u0130l\u00e7esi&#8217;nin Ek\u015fili Mahallesinde 9, Alt\u0131nkale, Orta, Yenik\u00f6y Mahallelerinde 3, Kovanl\u0131k Mahallesinde 2, A\u015fa\u011f\u0131oba, Da\u011fbeli, Karata\u015f, Kiri\u015f\u00e7iler Mahallerinde 1&#8217;er ilave trafo b\u00f6lgesi tesisi, \u015febekenin yenilenmesi ve kapasite art\u0131\u015f\u0131 yap\u0131ld\u0131. \u015eirket ayr\u0131ca, 2024&#8217;te il\u00e7e genelinde; 735 yeni ayd\u0131nlatma dire\u011fi, 7 kilometre havai al\u00e7ak gerilim \u015febekesi, 19 kilometre AG+OG havai \u015febeke, 21 kilometre yeralt\u0131 al\u00e7ak gerilim \u015febekesi ve 14 km yeralt\u0131 orta gerilim \u015febekesi tesisi planlad\u0131.<\/p>\n<p>AEDA\u015e, Kepez \u0130l\u00e7esi&#8217;nin Varsak Kar\u015f\u0131yaka&#8217;da 9, Alt\u0131nova Mahallesinde 4, Bar\u0131\u015f, Yeni Emek, Fatih Mahallerinde 2&#8217;\u015fer, Gazi, Habibler, K\u00fct\u00fck\u00e7\u00fc, \u015eafak, \u015eelale Mahalleri ve Ye\u015fil Sanayi Sitesi&#8217;nde 1&#8217;er ilave trafo b\u00f6lgesi tesisi, \u015febekenin yenilenmesi ve kapasite art\u0131\u015f\u0131 ve yenileme \u00e7al\u0131\u015fmalar\u0131 yap\u0131ld\u0131. 2024\u2019te il\u00e7e genelinde 1.100 yeni ayd\u0131nlatma dire\u011fi, 33 kilometre yeralt\u0131 al\u00e7ak gerilim \u015febekesi ve 25 kilometre yeralt\u0131 orta gerilim \u015febekesi tesisi planland\u0131.<\/p>\n<p>Yine \u015firket, Konyalt\u0131 \u0130l\u00e7esi&#8217;nin Yarba\u015f\u00e7and\u0131r-Hisar\u00e7and\u0131r Mahallesinde 17, G\u00f6kdere G\u00fcrsu, Hurma Mahallelerinde 1&#8217;er ilave trafo b\u00f6lgesi tesisi, \u015febekenin yenilenmesi ve kapasite art\u0131\u015f\u0131na gidildi. P\u0131narba\u015f\u0131 ve Uncal\u0131 Mahallelerine mevcut \u015febekede alternatif beslenme hatt\u0131 tesis edildi. 2024&#8217;te il\u00e7e genelinde 100 yeni ayd\u0131nlatma dire\u011fi, 18 km havai al\u00e7ak gerilim \u015febekesi, 40 kilometre AG+OG havai \u015febeke, 7 kilometre yeralt\u0131 al\u00e7ak gerilim \u015febekesi ve 3 kilometre yeralt\u0131 orta gerilim \u015febekesi tesisi planland\u0131.<\/p>\n<p>Di\u011fer yandan AEDA\u015e, Muratpa\u015fa \u0130l\u00e7esi&#8217;nin Ermenek Mahallesinde 2 ilave trafo b\u00f6lgesi tesisi, G\u00fczeloba Mahallesinde ise 2 ilave trafo b\u00f6lgesi tesisi ile 11 mevcut trafo tesisinde kapasite art\u0131\u015f\u0131 ve yenileme \u00e7al\u0131\u015fmalar\u0131 yap\u0131ld\u0131. Bu y\u0131l i\u00e7in il\u00e7e genelinde 370 yeni ayd\u0131nlatma dire\u011fi, 2 kilometre AG+OG havai \u015febeke, 11 kilometre yeralt\u0131 al\u00e7ak gerilim \u015febekesi ve 9 kilometre yeralt\u0131 orta gerilim \u015febekesi tesis edilmesi planland\u0131.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Akdeniz Elektrik Da\u011f\u0131t\u0131m A\u015e (AEDA\u015e), ge\u00e7en y\u0131l yapt\u0131\u011f\u0131 yat\u0131r\u0131mlarla Antalya Merkez, Aksu, D\u00f6\u015femealt\u0131, Kemer, Kepez, Konyaalt\u0131 ve Muratpa\u015fa\u2019y\u0131 kapsayan b\u00f6lgede enerji altyap\u0131s\u0131n\u0131 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":186619,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53],"tags":[31338,101448,15016,4546],"views":61,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/186617"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=186617"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/186617\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/186619"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=186617"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=186617"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=186617"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}