{"id":186539,"date":"2024-04-02T13:44:23","date_gmt":"2024-04-02T10:44:23","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=186539"},"modified":"2024-04-02T13:52:35","modified_gmt":"2024-04-02T10:52:35","slug":"ninova-yenilenebilir-enerji-den-izmir-e-depolamali-ges-yatirimi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/ninova-yenilenebilir-enerji-den-izmir-e-depolamali-ges-yatirimi\/","title":{"rendered":"(Turkish) &#8217;Ninova Yenilenebilir Enerji&#8217;den \u0130zmir\u2019e Depolamal\u0131 GES Yat\u0131r\u0131m\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/186539\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2>Ninova Yenilenebilir Enerji \u0130n\u015faat Taahh\u00fct Sanayi ve Ticaret A\u015e, &#8220;Seferihisar Camiikebir Depolamal\u0131 G\u00fcne\u015f Enerji Santrali (DGES)&#8221; projesi i\u00e7in \u00c7evre, \u015eehircilik ve \u0130klim De\u011fi\u015fikli\u011fi Bakanl\u0131\u011f\u0131 taraf\u0131ndan \u00c7ED s\u00fcreci ba\u015flat\u0131ld\u0131. \u015eirket taraf\u0131ndan \u0130zmir \u0130li, Seferihisar \u0130l\u00e7esi, s\u0131n\u0131rlar\u0131 i\u00e7inde 29,48 hektarl\u0131k alanda 20 MW kurulu g\u00fcc\u00fcnde Seferihisar Camiikebir DGES&#8217;in kurulup i\u015fletilmesi planlan\u0131yor.<\/h2>\n<p style=\"text-align: center;\"><img loading=\"lazy\" class=\"aligncenter wp-image-186542\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/04\/ninova-yenilenebilir-enerji-den-izmir-e-depolamali-ges-yatirimi.jpg\" alt=\"\" width=\"500\" height=\"289\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/04\/ninova-yenilenebilir-enerji-den-izmir-e-depolamali-ges-yatirimi.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/04\/ninova-yenilenebilir-enerji-den-izmir-e-depolamali-ges-yatirimi-300x173.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/04\/ninova-yenilenebilir-enerji-den-izmir-e-depolamali-ges-yatirimi-500x289.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/04\/ninova-yenilenebilir-enerji-den-izmir-e-depolamali-ges-yatirimi-80x46.jpg 80w\" sizes=\"(max-width: 500px) 100vw, 500px\" \/><\/p>\n<p><strong>249.500.000 TL<\/strong>&#8216;ye mal olmas\u0131 beklenen proje kapsam\u0131nda santralde toplam <strong>54.000 adet<\/strong> monokristal panel ve <strong>8 adet<\/strong> inverter kullan\u0131lacak.<\/p>\n<p>Santral i\u00e7in Vadi M\u00fchendislik Ltd. \u015eti. taraf\u0131ndan haz\u0131rlanan \u00c7evresel Etki De\u011ferlendirmesi (\u00c7ED) Ba\u015fvuru Dosyas\u0131, \u00c7evre \u015eehircilik ve \u0130klim De\u011fi\u015fikli\u011fi Bakanl\u0131\u011f\u0131na sunuldu. Dosyay\u0131 formata uygun bulan Bakanl\u0131k \u00c7ED s\u00fcrecini ba\u015flatt\u0131.<\/p>\n<p>Proje kapsam\u0131nda<strong> 27 MWm\/20 MWe ve 20 MWe\/20 MWh<\/strong> depolama alan\u0131na sahip bir depolama tesisi kurulacak. Bu tesis, <strong>Li-Ion (Lityum \u0130yon) batarya teknolojisi<\/strong> ile \u00e7al\u0131\u015facak olan ve<strong> GES ba\u011flant\u0131l\u0131 \u015fekilde kurulacak<\/strong> olan bir \u00fcnite olacak.<\/p>\n<p>Sistemin devreye al\u0131nmas\u0131 sonucu \u00fcretilmesi idealize edilen y\u0131ll\u0131k<strong> 40 milyon kWh<\/strong> elektrik enerjisi, proje alan\u0131n\u0131n kuzeyinde bulunan ku\u015f u\u00e7u\u015fu yakla\u015f\u0131k<strong> 11,30 km<\/strong> mesafedeki <strong>&#8220;Urla-2 TM&#8217;nin OG (TR-B) Baras\u0131&#8221;<\/strong>na ba\u011flant\u0131 yap\u0131larak \u015febekeye entegre edilecek.<\/p>\n<p><strong>Yay\u0131na Haz\u0131rlayan:<\/strong>\u00a0Emrecan Y\u00dcCEL \u2013 Enerji Sistemleri M\u00fchendisi \u2013\u00a0<a href=\"mailto:canemre2390@gmail.com\" target=\"_blank\" rel=\"noopener\">canemre2390@gmail.com<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Ninova Yenilenebilir Enerji \u0130n\u015faat Taahh\u00fct Sanayi ve Ticaret A\u015e, &#8220;Seferihisar Camiikebir Depolamal\u0131 G\u00fcne\u015f Enerji Santrali (DGES)&#8221; projesi i\u00e7in \u00c7evre, \u015eehircilik ve \u0130klim [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":186542,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49],"tags":[5927,113248,2206,113247],"views":107,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/186539"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=186539"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/186539\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/186542"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=186539"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=186539"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=186539"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}