{"id":186331,"date":"2024-03-27T17:18:53","date_gmt":"2024-03-27T14:18:53","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=186331"},"modified":"2024-03-27T17:18:53","modified_gmt":"2024-03-27T14:18:53","slug":"keban-barajina-yuzer-ges-kuruldu","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/keban-barajina-yuzer-ges-kuruldu\/","title":{"rendered":"(Turkish) Keban Baraj\u0131\u2019na Y\u00fczer GES Kuruldu"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/186331\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2><strong>Elaz\u0131\u011f Keban Baraj\u0131 G\u00f6l\u00fc y\u00fczeyine kurulu Kuzuova Y\u00fczer G\u00fcne\u015f Enerji Santraliyle y\u0131ll\u0131k 1 milyon 806 bin kilovatsaat elektrik \u00fcretilecek. Tar\u0131m ve Orman Bakan\u0131 \u0130brahim Yumakl\u0131, Elaz\u0131\u011f merkeze ba\u011fl\u0131 Fatmal\u0131 k\u00f6y\u00fc Be\u015fevler mezras\u0131 mevkiinde Keban Baraj\u0131\u2019nda in\u015fa edilen T\u00fcrkiye\u2019nin ilk y\u00fczer g\u00fcne\u015f enerjisi santralinde (GES) incelemelerde bulunarak, yetkililerden bilgi ald\u0131.<\/strong><\/h2>\n<p style=\"text-align: center;\"><img loading=\"lazy\" class=\"aligncenter wp-image-186333\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/03\/keban-barajina-yuzer-ges-kuruldu.jpg\" alt=\"\" width=\"500\" height=\"327\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/03\/keban-barajina-yuzer-ges-kuruldu.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/03\/keban-barajina-yuzer-ges-kuruldu-300x196.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/03\/keban-barajina-yuzer-ges-kuruldu-500x327.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/03\/keban-barajina-yuzer-ges-kuruldu-76x50.jpg 76w\" sizes=\"(max-width: 500px) 100vw, 500px\" \/><\/p>\n<p>Elaz\u0131\u011f Keban Baraj\u0131 g\u00f6l\u00fc y\u00fczeyine kurulu T\u00fcrkiye\u2019nin \u0130lk Y\u00fczer G\u00fcne\u015f Enerji Santrali, su \u00fcst\u00fcnde y\u00fczlerce g\u00fcne\u015f enerji paneline sahip. Santralin ayr\u0131ca milyonlarca kilovatsaat elektrik \u00fcretece\u011fi bilgisi payla\u015f\u0131ld\u0131.<\/p>\n<p>Elaz\u0131\u011f\u2019daki Keban Baraj\u0131\u2019n\u0131n elektrik \u00fcretimi ve sulama i\u00e7in \u00f6nemli su rezervuarlar\u0131ndan biri oldu\u011funu kaydeden Yumakl\u0131, sulama projelerinin \u00fclkede yayg\u0131nla\u015ft\u0131r\u0131lmas\u0131 i\u00e7in projeler geli\u015ftirmeye devam ettiklerini belirtti.<\/p>\n<p>Sistemin \u00f6nemli oldu\u011funu kaydeden Yumakl\u0131, <em>\u201cSu rezervuar\u0131 \u00fczerinde yapt\u0131\u011f\u0131m\u0131z g\u00fcne\u015f enerjisi sistemi temiz bir enerji. Karada yap\u0131lan enerji sistemlerinden y\u00fczde 10 daha verimli. Bu rezervuarlardaki elbette belli bir planlamayla yap\u0131lacak. Yap\u0131lacak olan g\u00fcne\u015f enerji sistemleri ayn\u0131 zamanda karadaki alan ihtiyac\u0131 ile ilgili bask\u0131y\u0131 da azaltacak\u201d<\/em> ifadelerini kulland\u0131.<\/p>\n<h3><strong>\u201cY\u0131ll\u0131k \u0130htiyac\u0131n Y\u00fczde 25\u2019ini Kar\u015f\u0131layacak Potansiyel Var\u201d<\/strong><\/h3>\n<p>Bakan Yumakl\u0131, bunun b\u00fct\u00fcn \u00fclke \u00e7ap\u0131nda yayg\u0131nla\u015ft\u0131r\u0131lmas\u0131yla ilgili Enerji ve Tabii Kaynaklar Bakanl\u0131\u011f\u0131 ile koordineli bir \u00e7al\u0131\u015fma y\u00fcr\u00fctt\u00fcklerini s\u00f6yledi.<\/p>\n<p><em>\u201cT\u00fcrkiye\u2019deki b\u00fct\u00fcn i\u00e7me suyu hari\u00e7, su rezervuarlar\u0131n\u0131n, barajlar\u0131n, g\u00f6letlerin elbette belli bir seviyede olmas\u0131 gerekir. Y\u00fczde 10\u2019unu bile kulland\u0131\u011f\u0131m\u0131zda T\u00fcrkiye\u2019nin y\u0131ll\u0131k elektrik ihtiyac\u0131n\u0131n 4\u2019te 1\u2019ini kar\u015f\u0131lama potansiyeline sahip. Elbette bu konu teorik bir konu\u201d<\/em> ifadelerini kullanan Yumakl\u0131, pratikte de ba\u015far\u0131l\u0131 \u00f6rnekten hareketle bunun geli\u015ftirilmesi i\u00e7in \u00e7al\u0131\u015fmaya devam edeceklerini kaydetti.<\/p>\n<h3><strong>Y\u00fczer GES Ekonomiye Katk\u0131 Sa\u011flayacak<\/strong><\/h3>\n<p>Kuzova Y\u00fczer G\u00fcne\u015f Enerji Santrali, y\u0131ll\u0131k 1 milyon 806 bin kilovatsaat elektrik enerjisi \u00fcretecek. Bu \u00fcretim miktar\u0131n\u0131n ekonomik kar\u015f\u0131l\u0131\u011f\u0131ysa 5,6 milyon TL seviyesini buluyor. 6 d\u00f6n\u00fcml\u00fck alana kurulu santral, d\u00f6rt blok halinde, 1840 g\u00fcne\u015f enerjisi panelinden olu\u015fuyor. Y\u00fczer GES projesinin \u00fclke \u00e7ap\u0131nda yayg\u0131nla\u015ft\u0131r\u0131lmas\u0131 hedefleniyor.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Elaz\u0131\u011f Keban Baraj\u0131 G\u00f6l\u00fc y\u00fczeyine kurulu Kuzuova Y\u00fczer G\u00fcne\u015f Enerji Santraliyle y\u0131ll\u0131k 1 milyon 806 bin kilovatsaat elektrik \u00fcretilecek. Tar\u0131m ve Orman [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":186333,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49],"tags":[4249,18,2326,2206,113173,113172,23002],"views":89,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/186331"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=186331"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/186331\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/186333"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=186331"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=186331"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=186331"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}