{"id":186120,"date":"2024-03-22T17:21:57","date_gmt":"2024-03-22T14:21:57","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=186120"},"modified":"2024-03-22T17:22:14","modified_gmt":"2024-03-22T14:22:14","slug":"akkuyu-ngs-nin-4-uncu-unitesinde-konsol-kirisi-kuruldu","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/akkuyu-ngs-nin-4-uncu-unitesinde-konsol-kirisi-kuruldu\/","title":{"rendered":"(Turkish) &#8217;Akkuyu NGS&#8217;nin 4\u2019\u00fcnc\u00fc \u00dcnitesinde Konsol Kiri\u015fi Kuruldu"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/186120\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2>Akkuyu N\u00fckleer G\u00fc\u00e7 Santrali\u2019nin (NGS) 4\u2019\u00fcnc\u00fc g\u00fc\u00e7 \u00fcnitesinde, g\u00f6vde ve y\u00f6nlendirici plaka ile birlikte kor tutucu ekipman\u0131n\u0131n bile\u015fenlerinden olan konsol kiri\u015fi, tasar\u0131m konumuna yerle\u015ftirildi.<\/h2>\n<p style=\"text-align: center;\"><img loading=\"lazy\" class=\"aligncenter wp-image-186123\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/03\/akkuyu-ngs-nin-4-uncu-unitesinde-konsol-kirisi-kuruldu-1.jpg\" alt=\"\" width=\"500\" height=\"334\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/03\/akkuyu-ngs-nin-4-uncu-unitesinde-konsol-kirisi-kuruldu-1.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/03\/akkuyu-ngs-nin-4-uncu-unitesinde-konsol-kirisi-kuruldu-1-300x200.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/03\/akkuyu-ngs-nin-4-uncu-unitesinde-konsol-kirisi-kuruldu-1-500x334.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/03\/akkuyu-ngs-nin-4-uncu-unitesinde-konsol-kirisi-kuruldu-1-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/03\/akkuyu-ngs-nin-4-uncu-unitesinde-konsol-kirisi-kuruldu-1-450x300.jpg 450w\" sizes=\"(max-width: 500px) 100vw, 500px\" \/><\/p>\n<p><strong>Su temini, buhar giderme<\/strong> ve <strong>havaland\u0131rman\u0131n<\/strong> yan\u0131 s\u0131ra \u00f6l\u00e7\u00fcm cihazlar\u0131 i\u00e7in ileti\u015fim ge\u00e7i\u015fini d\u00fczenlemek \u00fczere tasarlanan <strong>konsol kiri\u015fi<\/strong>, g\u00fcvenlik sisteminin \u00f6nemli bir par\u00e7as\u0131 olma \u00f6zelli\u011fini ta\u015f\u0131yor.<\/p>\n<p>A\u011f\u0131rl\u0131\u011f\u0131 166 ton, \u00e7ap\u0131 9,5 metre, y\u00fcksekli\u011fi ise 2,3 metre olan ekipman, 4\u2019\u00fcnc\u00fc \u00fcnitenin bas\u0131n\u00e7 kab\u0131n\u0131n alt k\u0131sm\u0131nda bulunuyor. Olduk\u00e7a b\u00fcy\u00fck bir metal ekipman olan konsol kiri\u015fi, <strong>6 ayr\u0131 par\u00e7adan<\/strong> olu\u015fuyor. Bu par\u00e7alar, kuru koruma kab\u0131 ve k\u0131lavuz plakay\u0131 so\u011futmaya yarayan hava beslemesi sistemi i\u00e7in bir hava kolekt\u00f6r\u00fc alan\u0131, \u015faft betonuna sabitlemek i\u00e7in destek ayaklar\u0131, buhar \u00e7\u0131karma borular\u0131, bak\u0131m i\u00e7in bir i\u015flem koridoru, sens\u00f6r korumas\u0131 i\u00e7in kapak borular\u0131 ve reakt\u00f6r \u015faft\u0131na hava eri\u015fimi i\u00e7in hava kanal\u0131 gibi bile\u015fenleri bar\u0131nd\u0131r\u0131yor.<\/p>\n<p>Konuya ili\u015fkin a\u00e7\u0131klama yapan <strong>Akkuyu<em>\u00a0<\/em>NGS Genel M\u00fcd\u00fcr Birinci Yard\u0131mc\u0131s\u0131 ve Yap\u0131 \u0130\u015fleri Direkt\u00f6r\u00fc Sergey Butckikh<\/strong>,\u00a0<em>\u201cAkkuyu NGS projesinde g\u00f6rev alan Rus ve T\u00fcrk uzmanlar, \u00e7e\u015fitli reakt\u00f6r tesisi yap\u0131lar\u0131n\u0131n kurulumunda geni\u015f deneyime sahipler. 4\u2019\u00fcnc\u00fc \u00fcnitede konsol kiri\u015finin kurulumu m\u00fckemmel bir \u015fekilde ger\u00e7ekle\u015ftirildi. T\u00fcm operasyon sadece 3 saat s\u00fcrd\u00fc. Bir sonraki a\u015famada y\u00f6nlendirme plakas\u0131 ve reakt\u00f6r\u00fcn kuru korumas\u0131 kurulacak.<strong> 4\u2019\u00fcnc\u00fc \u00fcnitede<\/strong> ve <strong>di\u011fer Akkuyu NGS tesislerinde montaj \u00e7al\u0131\u015fmalar\u0131<\/strong> t\u00fcm standartlara ve g\u00fcvenlik kurallar\u0131na uygun \u015fekilde y\u00fcr\u00fct\u00fcl\u00fcyor\u201d <\/em>dedi<em>.<\/em><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Akkuyu N\u00fckleer G\u00fc\u00e7 Santrali\u2019nin (NGS) 4\u2019\u00fcnc\u00fc g\u00fc\u00e7 \u00fcnitesinde, g\u00f6vde ve y\u00f6nlendirici plaka ile birlikte kor tutucu ekipman\u0131n\u0131n bile\u015fenlerinden olan konsol kiri\u015fi, tasar\u0131m [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":186122,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,43],"tags":[113103,3019,1303,113101,113102,19356],"views":30,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/186120"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=186120"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/186120\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/186122"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=186120"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=186120"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=186120"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}