{"id":185864,"date":"2024-03-18T15:24:09","date_gmt":"2024-03-18T12:24:09","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=185864"},"modified":"2024-03-18T15:24:59","modified_gmt":"2024-03-18T12:24:59","slug":"voltrun-turkiye-den-en-hizli-sarj-unitesi-boost-e-kurulumu","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/voltrun-turkiye-den-en-hizli-sarj-unitesi-boost-e-kurulumu\/","title":{"rendered":"(Turkish) &#8217;VOLTRUN T\u00fcrkiye&#8217;den En H\u0131zl\u0131 \u015earj \u00dcnitesi BOOST-E Kurulumu"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/185864\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2>T\u00fcrkiye\u2019nin \u00d6nc\u00fc \u015earj \u0130stasyon A\u011f\u0131 Voltrun, tek bir araca 500kW g\u00fc\u00e7 aktarabilen ve karde\u015f \u015firketi Zebra Elektronik taraf\u0131ndan geli\u015ftirilen <strong>Boost-E<\/strong> da\u011f\u0131t\u0131c\u0131 \u015farj \u00fcnitesi ile ilk kurulumunu ger\u00e7ekle\u015ftirdi.<\/h2>\n<p>Voltrun; Zebra Elektronik\u2019in teknoloji orta\u011f\u0131 oldu\u011fu, EnerjiSA \u00dcretim\u2019in farkl\u0131 \u015farj a\u011f\u0131 i\u015fletmecileri i\u00e7in <img loading=\"lazy\" class=\"alignright wp-image-185867\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/03\/voltrun-turkiye-den-en-hizli-sarj-unitesi-boost-e-kurulumu-1.jpg\" alt=\"\" width=\"320\" height=\"427\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/03\/voltrun-turkiye-den-en-hizli-sarj-unitesi-boost-e-kurulumu-1.jpg 360w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/03\/voltrun-turkiye-den-en-hizli-sarj-unitesi-boost-e-kurulumu-1-225x300.jpg 225w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/03\/voltrun-turkiye-den-en-hizli-sarj-unitesi-boost-e-kurulumu-1-300x400.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/03\/voltrun-turkiye-den-en-hizli-sarj-unitesi-boost-e-kurulumu-1-38x50.jpg 38w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>ortak bulu\u015fma noktas\u0131 olarak geli\u015ftirdi\u011fi Charging Hub projesinin \u0130stanbul Ata\u015fehir\u2019deki ilk noktas\u0131nda, a\u011f operat\u00f6r\u00fc olarak yerini ald\u0131.<\/p>\n<p>Voltrun proje kapsam\u0131nda ger\u00e7ekle\u015ftirdi\u011fi kurulumda, Zebra Elektronik taraf\u0131ndan geli\u015ftirilen <strong>Boost-E<\/strong> da\u011f\u0131t\u0131c\u0131 \u015farj \u00fcnitesini kullanarak tek bir araca<strong> 500kW<\/strong> g\u00fc\u00e7 aktarabilmekte. Huawei\u2019in geli\u015ftirdi\u011fi <strong>720kW<\/strong> kapasiteli <strong>Fusion Charge s\u0131v\u0131 so\u011futmal\u0131 g\u00fc\u00e7 \u00fcnitesi<\/strong> ile b\u00fct\u00fcnle\u015fik olarak \u00e7al\u0131\u015fabilen <strong>Boost-E<\/strong> ile ula\u015f\u0131lan ultra h\u0131zl\u0131 \u015farj imk\u00e2n\u0131 sayesinde sadece binek ve SUV ara\u00e7lar de\u011fil; hafif ticari ve a\u011f\u0131r ticari segmentlerdeki ara\u00e7lar da y\u00fcksek h\u0131zl\u0131 \u015farj olabiliyor.<\/p>\n<p>Zebra Elektonik ve Huawei taraf\u0131ndan geli\u015ftirilen bu b\u00fct\u00fcnle\u015fik \u015farj sistemi <strong>e\u015f zamanl\u0131 12 araca kadar y\u00fcksek h\u0131zda \u015farj imk\u00e2n\u0131<\/strong> sa\u011flarken, bu teknolojiyi kullan\u0131c\u0131lar\u0131na sunan<strong> Voltrun<\/strong> da <strong>\u015farj deneyimini<\/strong> en \u00fcste seviyeye ta\u015f\u0131yor.<\/p>\n<p><strong>Voltrun, Boost-e<\/strong> ile kullan\u0131c\u0131lar\u0131n \u015farj deneyimini ve yat\u0131r\u0131mc\u0131lar\u0131n yat\u0131r\u0131m getirisini \u00fcst seviyeye ta\u015f\u0131yan bu yeni \u00e7\u00f6z\u00fcm\u00fc \u00f6zellikle elektrikli ara\u00e7 kullan\u0131c\u0131lar\u0131n\u0131n h\u0131zl\u0131 \u015farj ihtiyac\u0131 olan uzun mesafe seyahat noktalar\u0131nda kurmay\u0131 planl\u0131yor. Voltrun bu sayede e\u015f zamanl\u0131 12 araca hizmet sa\u011flarken kullan\u0131c\u0131lar\u0131na zaman y\u00f6n\u00fcnden olduk\u00e7a b\u00fcy\u00fck bir avantaj da sa\u011flam\u0131\u015f olacak.<\/p>\n<p><strong>Voltrun Genel M\u00fcd\u00fcr\u00fc Berkay Somal\u0131 konu ile ilgili yapt\u0131\u011f\u0131 a\u00e7\u0131klamada;<\/strong> <em>&#8220;Voltrun Boost-e Ultra H\u0131zl\u0131 da\u011f\u0131t\u0131c\u0131 \u015farj \u00fcnitesi \u015farj istasyonlar\u0131m\u0131zda yerini almaya ba\u015flad\u0131. \u015earj s\u00fcresi azald\u0131k\u00e7a, elektrikli araca olan ilgi art\u0131yor ve kullan\u0131m al\u0131\u015fkanl\u0131klar\u0131 de\u011fi\u015fiyor<strong>. Boost-E<\/strong> kurulumlar\u0131n\u0131n elektrikli ara\u00e7 kullan\u0131m\u0131n\u0131 te\u015fvik etmede \u00f6nemli bir rol oynayaca\u011f\u0131n\u0131 d\u00fc\u015f\u00fcn\u00fcyoruz. S\u00fcrd\u00fcr\u00fclebilir bir ya\u015fam i\u00e7in ula\u015f\u0131m sisteminin elektrikliye d\u00f6n\u00fc\u015f\u00fcm\u00fcn\u00fcn \u00e7ok \u00f6nemli oldu\u011funu biliyor ve bu kapsamda yat\u0131r\u0131mlar\u0131m\u0131za devam ediyoruz.\u201d<\/em> dedi.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. T\u00fcrkiye\u2019nin \u00d6nc\u00fc \u015earj \u0130stasyon A\u011f\u0131 Voltrun, tek bir araca 500kW g\u00fc\u00e7 aktarabilen ve karde\u015f \u015firketi Zebra Elektronik taraf\u0131ndan geli\u015ftirilen Boost-E da\u011f\u0131t\u0131c\u0131 \u015farj [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":185866,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53],"tags":[112995,112997,76503,112993,112996,112994,108259],"views":65,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/185864"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=185864"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/185864\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/185866"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=185864"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=185864"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=185864"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}