{"id":185506,"date":"2024-03-08T19:02:05","date_gmt":"2024-03-08T16:02:05","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=185506"},"modified":"2024-03-08T19:02:26","modified_gmt":"2024-03-08T16:02:26","slug":"subat-2024-te-toplam-kurulu-gucun-yuzde-11-4-luk-kismi-gunes-ten","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/subat-2024-te-toplam-kurulu-gucun-yuzde-11-4-luk-kismi-gunes-ten\/","title":{"rendered":"(Turkish) \u015eubat 2024&#8217;te Toplam Kurulu G\u00fcc\u00fcn %11,4\u2019l\u00fck K\u0131sm\u0131 G\u00fcne\u015f&#8217;ten&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/185506\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2><strong>2024 y\u0131l\u0131 Ocak ay\u0131 sonunda 107.259 MW olan toplam kurulu g\u00fc\u00e7 de\u011feri 500,10 MW\u2019l\u0131k art\u0131\u015fla 2024 y\u0131l\u0131 \u015eubat ay\u0131 sonunda 107.759 MW olarak kaydedildi. 2024 \u015eubat ay\u0131nda toplam kurulu g\u00fcc\u00fcn %11,4\u2019l\u00fck k\u0131sm\u0131 (12.296 MW) g\u00fcne\u015f enerjisi santralleri taraf\u0131ndan olu\u015fturuldu.<\/strong><\/h2>\n<p style=\"text-align: center;\"><img loading=\"lazy\" class=\"aligncenter wp-image-185511\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/03\/subat-2024-te-toplam-kurulu-gucun-yuzde-11-4-luk-kismi-gunes-ten-1.jpg\" alt=\"\" width=\"500\" height=\"281\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/03\/subat-2024-te-toplam-kurulu-gucun-yuzde-11-4-luk-kismi-gunes-ten-1.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/03\/subat-2024-te-toplam-kurulu-gucun-yuzde-11-4-luk-kismi-gunes-ten-1-300x169.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/03\/subat-2024-te-toplam-kurulu-gucun-yuzde-11-4-luk-kismi-gunes-ten-1-500x281.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/03\/subat-2024-te-toplam-kurulu-gucun-yuzde-11-4-luk-kismi-gunes-ten-1-80x45.jpg 80w\" sizes=\"(max-width: 500px) 100vw, 500px\" \/><\/p>\n<p><a href=\"https:\/\/www.tenva.org\/aplus-enerji-subat-2024-analizi\/\" target=\"_blank\" rel=\"noopener\">APLUS Enerji taraf\u0131ndan yap\u0131lan analize g\u00f6re<\/a>, ger\u00e7ekle\u015fen elektrik \u00fcretimi kaynak bak\u0131m\u0131ndan incelendi\u011finde ise, 2024 \u015eubat ay\u0131nda toplam \u00fcretimin <strong>%11,5<\/strong>\u2019inin <strong>do\u011fal gaz ve LNG santralleri<\/strong> taraf\u0131ndan ger\u00e7ekle\u015ftirildi\u011fi g\u00f6r\u00fclmektedir. <strong>Barajl\u0131 hidroelektrik santraller<\/strong>, ilgili ayda toplam \u00fcretimin <strong>%22,0<\/strong>\u2019\u0131n\u0131 kar\u015f\u0131larken, <strong>akarsu tipi hidroelektrik santraller<\/strong> ise<strong> %6,1<\/strong> oran\u0131yla \u00fcretime katk\u0131da bulunmu\u015ftur. <strong>\u0130thal k\u00f6m\u00fcr santralleri<\/strong> \u015eubat ay\u0131nda toplam \u00fcretimin <strong>%23,7<\/strong>\u2019sini kar\u015f\u0131larken, <strong>yerli k\u00f6m\u00fcr santralleri<\/strong> ise <strong>%14,2<\/strong> oran\u0131nda katk\u0131 sa\u011flam\u0131\u015ft\u0131r. Yenilenebilir enerji santrallerinden <strong>r\u00fczg\u00e2r enerjisi santralleri<\/strong> toplam \u00fcretime <strong>%10,4<\/strong> <strong>jeotermal ve g\u00fcne\u015f enerjisi santralleri<\/strong> ise toplam<strong> %9,1<\/strong> oran\u0131nda katk\u0131da bulunmu\u015ftur. <strong>Di\u011fer termik santrallerin<\/strong> \u00fcretimdeki pay\u0131 ise<strong> %3,1<\/strong> olarak ger\u00e7ekle\u015fmi\u015ftir.<\/p>\n<p style=\"text-align: center;\"><img loading=\"lazy\" class=\"aligncenter wp-image-185509\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/03\/subat-2024-te-toplam-kurulu-gucun-yuzde-11-4-luk-kismi-gunes-ten.jpg\" alt=\"\" width=\"500\" height=\"307\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/03\/subat-2024-te-toplam-kurulu-gucun-yuzde-11-4-luk-kismi-gunes-ten.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/03\/subat-2024-te-toplam-kurulu-gucun-yuzde-11-4-luk-kismi-gunes-ten-300x184.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/03\/subat-2024-te-toplam-kurulu-gucun-yuzde-11-4-luk-kismi-gunes-ten-500x307.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/03\/subat-2024-te-toplam-kurulu-gucun-yuzde-11-4-luk-kismi-gunes-ten-80x50.jpg 80w\" sizes=\"(max-width: 500px) 100vw, 500px\" \/><\/p>\n<p>2024 y\u0131l\u0131 \u015eubat ay\u0131 sonunda olu\u015fan toplam kurulu g\u00fcc\u00fcn <strong>%23,6<\/strong>\u2019l\u0131k k\u0131sm\u0131 (25.403 MW) <strong>do\u011fal gaz ve LNG yak\u0131t tipi santralleri<\/strong> ile kar\u015f\u0131lan\u0131rken,<strong> %22,0<\/strong>\u2019l\u0131k k\u0131sm\u0131 (23.654 MW) <strong>barajl\u0131 hidrolik santraller<\/strong> taraf\u0131ndan kar\u015f\u0131lanmaktad\u0131r. Bu yak\u0131t tiplerini<strong> %10,6\u2019l\u0131k<\/strong> (11.440 MW) oran ile <strong>yerli k\u00f6m\u00fcr<\/strong> santralleri ve <strong>%9,6<\/strong>\u2019l\u0131k oran (10.374 MW) ile <strong>ithal k\u00f6m\u00fcr santralleri<\/strong> izlemektedir. <strong>Akarsu tipi hidrolik santraller %7,7<\/strong>\u2019lik bir orana (8.321 MW) sahipken, <strong>r\u00fczg\u00e2r santralleri<\/strong> toplam kurulu g\u00fcc\u00fcn <strong>%11,1<\/strong>\u2019lik bir k\u0131sm\u0131n\u0131 (11.909 MW) olu\u015fturmaktad\u0131r. Toplam kurulu g\u00fcc\u00fcn <strong>%11,4<\/strong>\u2019l\u00fck k\u0131sm\u0131 (12.296 MW) <strong>g\u00fcne\u015f enerjisi santralleri<\/strong>, <strong>%1,6<\/strong>\u2019l\u0131k k\u0131sm\u0131 (1.691 MW) <strong>jeotermal enerji santrallerinden<\/strong> olu\u015furken, <strong>%2,5<\/strong>\u2019lik k\u0131sm\u0131 (2.672 MW) ise <strong>di\u011fer termik santraller<\/strong> taraf\u0131ndan olu\u015fturulmaktad\u0131r.<\/p>\n<p>Toplam kurulu g\u00fcc\u00fcn <strong>%66,5<\/strong>\u2019lik (71.678 MW) k\u0131sm\u0131n\u0131 <strong>serbest \u00fcretim \u015firketleri<\/strong> olu\u015ftururken, <strong>E\u00dcA\u015e<\/strong> santrallerinin toplam kurulu g\u00fc\u00e7teki pay\u0131 <strong>%19,9<\/strong> (21.391 MW) seviyesindedir.<strong> Yap i\u015flet devret santralleri %0,1<\/strong>\u2019lik (116 MW), <strong>i\u015fletme hakk\u0131 devredilen santraller %3,0<\/strong>\u2019l\u0131k (3,244 MW) bir orana sahiptir. <strong>Lisanss\u0131z santrallerin<\/strong> toplam kurulu g\u00fc\u00e7 i\u00e7indeki pay\u0131 da<strong> %10,5 (11.330 MW)<\/strong> olarak kaydedilmi\u015ftir.<\/p>\n<p>Kaynak:\u00a0<a href=\"https:\/\/www.tenva.org\/aplus-enerji-subat-2024-analizi\/\" target=\"_blank\" rel=\"noopener\">APLUS Enerji \/ TENVA<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. 2024 y\u0131l\u0131 Ocak ay\u0131 sonunda 107.259 MW olan toplam kurulu g\u00fc\u00e7 de\u011feri 500,10 MW\u2019l\u0131k art\u0131\u015fla 2024 y\u0131l\u0131 \u015eubat ay\u0131 sonunda 107.759 MW [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":185511,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[112840,23679,1325,110018,846],"views":163,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/185506"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=185506"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/185506\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/185511"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=185506"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=185506"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=185506"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}