{"id":185292,"date":"2024-03-04T15:56:10","date_gmt":"2024-03-04T12:56:10","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=185292"},"modified":"2024-03-04T15:56:10","modified_gmt":"2024-03-04T12:56:10","slug":"cengiz-holding-ges-yatirimiyla-yenilenebilir-payini-artiracak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/cengiz-holding-ges-yatirimiyla-yenilenebilir-payini-artiracak\/","title":{"rendered":"(Turkish) &#8217;Cengiz Holding&#8217; GES Yat\u0131r\u0131m\u0131yla &#8216;Yenilenebilir&#8217; Pay\u0131n\u0131 Art\u0131racak"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/185292\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2><strong>Cengiz Holding, sanayide kulland\u0131\u011f\u0131 elektri\u011fi yenilenebilir kaynaklardan temin etme vizyonu do\u011frultusunda yat\u0131r\u0131mlar\u0131n\u0131 h\u0131zland\u0131rd\u0131. \u015eirket, Eti Al\u00fcminyum\u2019da hayata ge\u00e7irilen d\u00f6rt g\u00fcne\u015f enerji santralinin (GES) ard\u0131ndan, \u015fimdi de Eti Bak\u0131r\u2019\u0131n t\u00fcketimini \u2018yenilenebilir\u2019den sa\u011flamak i\u00e7in harekete ge\u00e7ti. Maz\u0131da\u011f\u0131\u2019nda tamamlanan 52 MW\u2019lik GES\u2019in, y\u0131l\u0131n ikinci yar\u0131s\u0131nda \u00fcretime ba\u015flamas\u0131 \u00f6ng\u00f6r\u00fcl\u00fcyor.<\/strong><\/h2>\n<p style=\"text-align: center;\"><img loading=\"lazy\" class=\"aligncenter wp-image-185294\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/03\/cengiz-holding-ges-yatirimiyla-yenilenebilir-payini-artiracak.jpg\" alt=\"\" width=\"500\" height=\"375\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/03\/cengiz-holding-ges-yatirimiyla-yenilenebilir-payini-artiracak.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/03\/cengiz-holding-ges-yatirimiyla-yenilenebilir-payini-artiracak-300x225.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/03\/cengiz-holding-ges-yatirimiyla-yenilenebilir-payini-artiracak-500x375.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/03\/cengiz-holding-ges-yatirimiyla-yenilenebilir-payini-artiracak-67x50.jpg 67w\" sizes=\"(max-width: 500px) 100vw, 500px\" \/><\/p>\n<p>T\u00fcrkiye\u2019nin en b\u00fcy\u00fck sanayi \u015firketlerinden biri olan Cengiz Holding, s\u00fcrd\u00fcr\u00fclebilirlik konusunda da sekt\u00f6re \u00f6nc\u00fcl\u00fck ediyor. Grup \u015firketleri aras\u0131nda sa\u011flad\u0131\u011f\u0131 Ar-Ge, inovasyon ve teknoloji entegrasyonu sayesinde, uygulad\u0131\u011f\u0131 \u2018en iyi\u2019 teknikleri daha da ileri ta\u015f\u0131mak i\u00e7in yat\u0131r\u0131mlar\u0131n\u0131 s\u00fcrd\u00fcren Cengiz Holding, sanayide kulland\u0131\u011f\u0131 elektri\u011fin yenilenebilir kaynaklardan sa\u011flanmas\u0131n\u0131 oda\u011f\u0131na ald\u0131. Eti Al\u00fcminyum\u2019da hayata ge\u00e7irdi\u011fi d\u00f6rt g\u00fcne\u015f enerji santrali (GES) sayesinde tesisin t\u00fcm elektri\u011fini yenilenebilir enerjiden kar\u015f\u0131lamaya ba\u015flayan Cengiz Holding, bir di\u011fer grup \u015firketi <strong>Eti Bak\u0131r<\/strong> i\u00e7in de benzer yolu izleyecek. Bu kapsamda yap\u0131lan Eti Bak\u0131r\u2019\u0131n <strong>Maz\u0131da\u011f\u0131 Metal Geri Kazan\u0131m ve Entegre G\u00fcbre Tesisleri<\/strong> arazisindeki <strong>g\u00fcne\u015f enerji santrali<\/strong> tamamlan\u0131rken, elektrik \u00fcretimi i\u00e7in g\u00fcn say\u0131yor.<\/p>\n<p><strong><img loading=\"lazy\" class=\"alignright wp-image-185295\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/03\/cengiz-holding-ges-yatirimiyla-yenilenebilir-payini-artiracak-1.jpg\" alt=\"\" width=\"320\" height=\"274\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/03\/cengiz-holding-ges-yatirimiyla-yenilenebilir-payini-artiracak-1.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/03\/cengiz-holding-ges-yatirimiyla-yenilenebilir-payini-artiracak-1-300x257.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/03\/cengiz-holding-ges-yatirimiyla-yenilenebilir-payini-artiracak-1-467x400.jpg 467w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/03\/cengiz-holding-ges-yatirimiyla-yenilenebilir-payini-artiracak-1-58x50.jpg 58w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/03\/cengiz-holding-ges-yatirimiyla-yenilenebilir-payini-artiracak-1-500x428.jpg 500w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>Cengiz Holding Enerji Grup Ba\u015fkan\u0131 Ahmet Cengiz<\/strong>, enerji portf\u00f6y\u00fcnde yenilenebilir kaynakl\u0131 \u00fcretimin pay\u0131n\u0131 art\u0131rmaya devam edeceklerini belirterek, <em>\u201c\u015eirketimizin vizyonu do\u011frultusunda; m\u00fcmk\u00fcn olan en k\u0131sa d\u00f6nemde sanayi tesislerimizin elektri\u011fini tamamen yenilenebilir kaynaklardan sa\u011flamak istiyoruz. Bu kapsamda Eti Bak\u0131r i\u00e7in ilk g\u00fcne\u015f enerji santralimizin kurulumunu tamamlad\u0131k. <strong>52 MW<\/strong> kurulu g\u00fcce sahip GES\u2019in y\u0131l\u0131n ikinci yar\u0131s\u0131nda faaliyete ge\u00e7ece\u011fini \u00f6ng\u00f6r\u00fcyoruz. <strong>711 milyon TL<\/strong>\u2019lik yat\u0131r\u0131mla kurulan santral, <strong>210.000 hanenin t\u00fcketimine e\u015fde\u011fer<\/strong> elektri\u011fi \u00fcretecek\u201d<\/em> dedi.<\/p>\n<h3><strong>&#8216;T\u00dcRK\u0130YE\u2019N\u0130N \u0130LK H\u0130BR\u0130T ENERJ\u0130 SANTRAL\u0130N\u0130 YAPTIK\u2019<\/strong><\/h3>\n<p>Cengiz Holding\u2019in grup \u015firketi olan Cengiz Enerji\u2019nin, kurulu g\u00fcc\u00fc ve \u00fcretimiyle ilgili bilgi veren Cengiz, s\u00f6zlerini \u015f\u00f6yle s\u00fcrd\u00fcrd\u00fc:<em> \u201c<strong>Hidroelektrik, r\u00fczgar, solar ve termik santrallerden<\/strong> olu\u015fan portf\u00f6y\u00fcm\u00fcz \u015fu anda toplam <strong>4.845 MW<\/strong>\u2019l\u0131k kurulu g\u00fcce sahip. Bunun <strong>%60<\/strong>\u2019\u0131n\u0131 yenilenebilir kaynakl\u0131 enerji olu\u015fturuyor. Yenilenebilir enerjideki yat\u0131r\u0131mlar\u0131m\u0131z\u0131 bir ad\u0131m ileriye ta\u015f\u0131d\u0131k ve elektrik \u00fcretimini daha verimli hale getirmek i\u00e7in bu kaynaklar\u0131 \u00e7e\u015fitlendirerek <strong>hibrit santrallere<\/strong> y\u00f6neldik. T\u00fcrkiye\u2019de ilk hibrit enerji santralini, Bing\u00f6l\u2019deki A\u015fa\u011f\u0131 Kalek\u00f6y Baraj\u0131 ve Hidroelektrik Santrali\u2019ne ekledi\u011fimiz GES\u2019le biz ge\u00e7ekle\u015ftirdik. Bu hibrit enerji santrali, T\u00fcrkiye\u2019de ilk olmas\u0131n\u0131n yan\u0131 s\u0131ra Avrupa\u2019n\u0131n en b\u00fcy\u00fc\u011f\u00fc olmas\u0131yla da bizi gururland\u0131rmaya devam ediyor. Yine bu kapsamda r\u00fczgar enerji santrallerimizin oldu\u011fu yerlerde bu kayna\u011f\u0131 g\u00fcne\u015fle destekliyoruz; bunun da ilk \u00f6rne\u011fini Sinop\u2019ta yapt\u0131k. Orta vadede yenilenebilir portf\u00f6y\u00fcm\u00fcze <strong>1.020 MW<\/strong> kurulu g\u00fc\u00e7 ekleyerek bu alandaki toplam kurulu g\u00fcc\u00fcm\u00fcz\u00fc <strong>3.875 MW<\/strong>\u2019a, portf\u00f6y i\u00e7indeki pay\u0131n\u0131 da <strong>%70\u2019e<\/strong> \u00e7\u0131karmay\u0131 hedefliyoruz.\u201d<\/em><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Cengiz Holding, sanayide kulland\u0131\u011f\u0131 elektri\u011fi yenilenebilir kaynaklardan temin etme vizyonu do\u011frultusunda yat\u0131r\u0131mlar\u0131n\u0131 h\u0131zland\u0131rd\u0131. \u015eirket, Eti Al\u00fcminyum\u2019da hayata ge\u00e7irilen d\u00f6rt g\u00fcne\u015f enerji santralinin [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":185294,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[2889,7459,29013,2569,21101,105],"views":45,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/185292"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=185292"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/185292\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/185294"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=185292"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=185292"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=185292"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}