{"id":185143,"date":"2024-02-29T14:50:16","date_gmt":"2024-02-29T11:50:16","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=185143"},"modified":"2024-02-29T14:50:16","modified_gmt":"2024-02-29T11:50:16","slug":"lila-kagit-tan-ergene-de-ges-yatirimi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/lila-kagit-tan-ergene-de-ges-yatirimi\/","title":{"rendered":"(Turkish) &#8217;Lila Ka\u011f\u0131t&#8217;tan Ergene\u2019de GES Yat\u0131r\u0131m\u0131&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/185143\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2><strong>T\u00fcrkiye\u2019nin \u00f6nde gelen hijyenik temizlik ka\u011f\u0131d\u0131 \u00fcreticisi Lila Ka\u011f\u0131t; s\u00fcrd\u00fcr\u00fclebilir b\u00fcy\u00fcme odakl\u0131 stratejisi do\u011frultusunda, yenilenebilir enerji yat\u0131r\u0131mlar\u0131na h\u0131z verdi. \u015eirket; ilk olarak Ergene\u2019de bulunan \u00fcretim sahas\u0131nda yeni GES projesini faaliyete ge\u00e7irdi.<\/strong><\/h2>\n<p>D\u00fcnyada 80\u2019den fazla \u00fclkeye yapt\u0131\u011f\u0131 ihracat\u0131; Sofia, Maylo, UltraBerrak, Nua markalar\u0131 ve \u00f6nc\u00fc <img loading=\"lazy\" class=\"alignright wp-image-185147\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/02\/lila-kagit-tan-ergene-de-ges-yatirimi-1.jpg\" alt=\"\" width=\"320\" height=\"227\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/02\/lila-kagit-tan-ergene-de-ges-yatirimi-1.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/02\/lila-kagit-tan-ergene-de-ges-yatirimi-1-300x213.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/02\/lila-kagit-tan-ergene-de-ges-yatirimi-1-500x355.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/02\/lila-kagit-tan-ergene-de-ges-yatirimi-1-71x50.jpg 71w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>yat\u0131r\u0131mlar\u0131 ile temizlik ka\u011f\u0131d\u0131 sekt\u00f6r\u00fcn\u00fcn ezber bozan oyuncusu <strong>Lila Ka\u011f\u0131t<\/strong>;<strong>\u00a0<\/strong>\u00e7evreye duyarl\u0131 yakla\u015f\u0131m\u0131 ve s\u00fcrd\u00fcr\u00fclebilir b\u00fcy\u00fcme hedefleri do\u011frultusunda, T\u00fcrkiye\u2019nin \u00fc\u00e7 farkl\u0131 noktas\u0131nda, toplam <strong>50 MW<\/strong> g\u00fcc\u00fcnde yenilenebilir enerji yat\u0131r\u0131m\u0131n\u0131 hayata ge\u00e7irmeye haz\u0131rlan\u0131yor.<\/p>\n<p>\u015eirketin bu kapsamdaki ilk yat\u0131r\u0131m\u0131 olan ve <strong>Ergene<\/strong>&#8216;deki \u00fcretim sahas\u0131na kurulan<strong>\u00a014.5 MW<\/strong> kapasiteli <strong>\u00c7at\u0131 tipi GES<\/strong> devreye al\u0131narak, test \u00fcretimlerine ba\u015flad\u0131.<\/p>\n<p>\u00dcretim sahas\u0131ndaki \u00e7at\u0131lar\u0131n tamam\u0131 toplam <strong>33.761 adet g\u00fcne\u015f enerjisi paneli<\/strong> ile kaplan\u0131rken, \u00e7evresel anlamda da \u00f6nemli bir \u00e7al\u0131\u015fmaya imza at\u0131ld\u0131. Proje sayesinde sadece bir y\u0131lda <strong>karbon sal\u0131n\u0131m\u0131n\u0131n 8.613 ton azalt\u0131lmas\u0131<\/strong> planlan\u0131yor.<\/p>\n<h3><strong>S\u0131rada Yeni Lokasyonlar Var<\/strong><\/h3>\n<p>Bir yandan, ge\u00e7ti\u011fimiz aylarda <strong>Erzurum<\/strong>&#8216;da temelini att\u0131\u011f\u0131 tesis ile\u00a0Do\u011fu Anadolu ve Do\u011fu Karadeniz\u2019in ilk temizlik ka\u011f\u0131d\u0131 \u00fcretim merkezi ve en b\u00fcy\u00fck a\u011f\u0131r sanayi yat\u0131r\u0131mlar\u0131ndan birini T\u00fcrkiye\u2019ye kazand\u0131rmay\u0131 hedefleyen Lila Ka\u011f\u0131t; di\u011fer yandan, yenilenebilir enerji yat\u0131r\u0131mlar\u0131na da h\u0131z kesmeden devam edecek.<\/p>\n<p>Lila Ka\u011f\u0131t bu hedef do\u011frultusunda, yak\u0131n zamanda T\u00fcrkiye\u2019nin iki farkl\u0131 noktas\u0131nda daha g\u00fcne\u015f enerjisi santrali kurmay\u0131 ve toplam yenilenebilir enerji \u00fcretim kapasitesini <strong>50 MW\u2019a<\/strong> \u00e7\u0131karmay\u0131 hedefliyor.<\/p>\n<p>Yenilenebilir enerji yat\u0131r\u0131mlar\u0131na y\u00f6nelme karar\u0131n\u0131n temelinde yatan nedenlerin; daha az karbon <img loading=\"lazy\" class=\"alignleft wp-image-185146\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/02\/lila-kagit-tan-ergene-de-ges-yatirimi-2.jpg\" alt=\"\" width=\"320\" height=\"331\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/02\/lila-kagit-tan-ergene-de-ges-yatirimi-2.jpg 464w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/02\/lila-kagit-tan-ergene-de-ges-yatirimi-2-290x300.jpg 290w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/02\/lila-kagit-tan-ergene-de-ges-yatirimi-2-387x400.jpg 387w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/02\/lila-kagit-tan-ergene-de-ges-yatirimi-2-48x50.jpg 48w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>sal\u0131n\u0131m\u0131, yerli ve yenilenebilir kaynak kullan\u0131m\u0131 ile \u00fclke ekonomisine katk\u0131, AB&#8217;nin <strong>\u2018S\u0131n\u0131rda Karbon D\u00fczenleme Mekanizmas\u0131&#8217;na<\/strong> uyum ve yurt d\u0131\u015f\u0131 pazarlardaki rekabet avantaj\u0131 oldu\u011funun alt\u0131n\u0131 \u00e7izen <strong>Lila Ka\u011f\u0131t Genel M\u00fcd\u00fcr\u00fc Alp \u00d6\u011f\u00fcc\u00fc<\/strong>; <em>&#8220;Ergene tesisimizin ard\u0131ndan devreye alaca\u011f\u0131m\u0131z di\u011fer GES projelerimiz tamamland\u0131\u011f\u0131nda; Lila Ka\u011f\u0131t olarak t\u00fcketti\u011fimiz toplam elektri\u011fin d\u00f6rtte birini yenilenebilir kaynaklardan kar\u015f\u0131layabilece\u011fiz. <strong>Toplam 1 milyar TL\u2019lik yat\u0131r\u0131m bedeli<\/strong> olan yenilenebilir enerji santrallerimiz ile gelecek nesillere daha ya\u015fanabilir bir d\u00fcnya b\u0131rakmay\u0131 ve kendi kendine yetebilen, s\u00fcrd\u00fcr\u00fclebilir bir \u00fcretim sistemi olu\u015fturmay\u0131 hedefliyoruz. Sadece Ergene tesisimizde faaliyete ge\u00e7en GES sayesinde 25 y\u0131ll\u0131k s\u00fcrede 200 bin tona yak\u0131n karbon sal\u0131m\u0131n\u0131n \u00f6n\u00fcne ge\u00e7ebilecek ve buna e\u015f olarak 1.3 milyon a\u011fac\u0131 kurtarm\u0131\u015f olaca\u011f\u0131z. Di\u011fer yat\u0131r\u0131mlar\u0131m\u0131z\u0131n da tamamlanmas\u0131yla, bu rakamlar\u0131n \u00fc\u00e7 kat artaca\u011f\u0131n\u0131 s\u00f6yleyebiliriz. Lila Ka\u011f\u0131t olarak; duyarl\u0131 ve ezber bozan kurumsal karakterimizi yans\u0131tan yenilik\u00e7i at\u0131l\u0131mlar\u0131m\u0131z\u0131, \u00f6n\u00fcm\u00fczdeki d\u00f6nemde de s\u00fcrd\u00fcrece\u011fiz&#8221;<\/em> dedi.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. T\u00fcrkiye\u2019nin \u00f6nde gelen hijyenik temizlik ka\u011f\u0131d\u0131 \u00fcreticisi Lila Ka\u011f\u0131t; s\u00fcrd\u00fcr\u00fclebilir b\u00fcy\u00fcme odakl\u0131 stratejisi do\u011frultusunda, yenilenebilir enerji yat\u0131r\u0131mlar\u0131na h\u0131z verdi. \u015eirket; ilk olarak [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":185145,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49],"tags":[30581,29013,2569,2206,431,112712,21101,1245],"views":92,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/185143"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=185143"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/185143\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/185145"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=185143"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=185143"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=185143"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}