{"id":185127,"date":"2024-02-28T17:42:00","date_gmt":"2024-02-28T14:42:00","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=185127"},"modified":"2024-02-28T17:56:18","modified_gmt":"2024-02-28T14:56:18","slug":"turkiyenin-en-buyuk-elektrik-ureticileri-belli-oldu","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/turkiyenin-en-buyuk-elektrik-ureticileri-belli-oldu\/","title":{"rendered":"(Turkish) T\u00fcrkiye\u2019nin En B\u00fcy\u00fck Elektrik \u00dcreticileri Belli Oldu"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/185127\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2>Enerji G\u00fcnl\u00fc\u011f\u00fc ve uluslararas\u0131 dan\u0131\u015fmanl\u0131k kurulu\u015fu Kearney taraf\u0131ndan haz\u0131rlanan MW100 &#8211; T\u00fcrkiye&#8217;nin En B\u00fcy\u00fck Elektrik \u00dcreticileri Raporu&#8217;nun 5&#8217;incisi yay\u0131nland\u0131.<\/h2>\n<p style=\"text-align: center;\"><img loading=\"lazy\" class=\"aligncenter wp-image-185135\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/02\/00.jpg\" alt=\"\" width=\"500\" height=\"313\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/02\/00.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/02\/00-300x188.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/02\/00-500x313.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/02\/00-80x50.jpg 80w\" sizes=\"(max-width: 500px) 100vw, 500px\" \/><\/p>\n<p>Elektrik \u00fcreticilerinin 31 Aral\u0131k 2023 tarihi itibar\u0131yla sahip olduklar\u0131 kurulu g\u00fc\u00e7lerine g\u00f6re yap\u0131lan ara\u015ft\u0131rma, 2001 y\u0131l\u0131ndan itibaren ba\u015flayan, 2013\u2019ten sonra h\u0131zlanan \u00f6zelle\u015ftirmelere \u00e7abalar\u0131na ra\u011fmen kamu kurulu\u015fu Elektrik \u00dcretim Anonim \u015eirketi\u2019nin (E\u00dcA\u015e) sekt\u00f6rdeki a\u011f\u0131rl\u0131\u011f\u0131n\u0131n s\u00fcrd\u00fc\u011f\u00fcn\u00fc ortaya koydu. MW100 ara\u015ft\u0131rmas\u0131na g\u00f6re E\u00dcA\u015e\u2019a ba\u011fl\u0131 santrallerin 21.802 MWe\u2019lik kurulu g\u00fcc\u00fc bulunuyor.<\/p>\n<p>Bu kapasite, T\u00fcrkiye\u2019nin 106.659 MWe\u2019lik toplam kurulu \u00fcretim kapasitesinin y\u00fczde 20\u2019sini olu\u015fturuyor. E\u00dcA\u015e\u2019\u0131n kurulu g\u00fcc\u00fcn\u00fcn 14.451 MWe\u2019si hidroelektrik santrallerden, 4.735 MWe\u2019si do\u011falgaz santrallerinden, 2.424 MWe\u2019si yerli k\u00f6m\u00fcr santrallerinden, 17 MWe\u2019si ise r\u00fczgar santrallerinden geliyor.<\/p>\n<h3 style=\"text-align: center;\"><strong>MW100\u2019\u00fcn \u0130lk 10\u2019u \u015e\u00f6yle S\u0131ralan\u0131yor:<\/strong><\/h3>\n<p><img loading=\"lazy\" class=\"aligncenter wp-image-185134\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/02\/01.jpg\" alt=\"\" width=\"400\" height=\"395\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/02\/01.jpg 486w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/02\/01-300x296.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/02\/01-405x400.jpg 405w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/02\/01-51x50.jpg 51w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/02\/01-100x100.jpg 100w\" sizes=\"(max-width: 400px) 100vw, 400px\" \/><\/p>\n<h3><strong>\u00d6ZEL SEKT\u00d6RDE \u0130LK SIRA ENKA\u2019NIN<\/strong><\/h3>\n<p>\u00d6zel sekt\u00f6r \u015firketleri aras\u0131nda kurulu g\u00fc\u00e7 a\u00e7\u0131s\u0131ndan en b\u00fcy\u00fc\u011f\u00fc ise ENKA. MW100 Ara\u015ft\u0131rmas\u0131\u2019na g\u00f6re ENKA\u2019ya ait santrallerin 3.978 MWe kurulu g\u00fcc\u00fc bulunuyor. ENKA, santralleri bu rakamla T\u00fcrkiye\u2019nin toplam \u00fcretim kapasitesinin y\u00fczde 4\u2019\u00fcn\u00fc olu\u015fturuyor. Ancak ara\u015ft\u0131rmaya imza atan Enerji G\u00fcnl\u00fc\u011f\u00fc ve Kearney T\u00fcrkiye yetkilileri, ENKA\u2019ya ait do\u011falgaz santrallerinin kurulu g\u00fc\u00e7leri y\u00fcksek olsa da piyasa \u015fartlar\u0131 nedeniyle \u00fcretim faaliyetlerinin giderek azald\u0131\u011f\u0131na dikkat \u00e7ekiyor.<\/p>\n<h3><strong>ENERJ\u0130SA \u00dc\u00c7\u00dcNC\u00dcL\u00dcK KOLTU\u011eUNDA<\/strong><\/h3>\n<p>MW100 Ara\u015ft\u0131rmas\u0131\u2019nda en b\u00fcy\u00fck \u00fc\u00e7\u00fcnc\u00fc elektrik \u00fcreticisi 3.792 MWe\u2019lik kurulu g\u00fcc\u00fcyle Enerjisa. Alman E.ON ile Sabanc\u0131 Holding ortakl\u0131\u011f\u0131 Enerjisa\u2019n\u0131n MW100 listesinin ilk 3 s\u0131ras\u0131ndakiler aras\u0131nda en dengeli kaynak da\u011f\u0131l\u0131m\u0131na sahip \u015firket oldu\u011fu dikkat \u00e7ekiyor. MW100\u2019e g\u00f6re Enerjisa\u2019n\u0131n \u00fcretim portf\u00f6y\u00fcnde 1.583 MWe\u2019lik do\u011falgaz, 450 MWe\u2019lik yerli k\u00f6m\u00fcr, 1.353 MWe\u2019lik hidroelektrik, 397 MWe\u2019lik de r\u00fczgar santrali var.<\/p>\n<h3><strong>ONUR OKUTUR: DEPOLAMA YATIRIMLARI ELEKTR\u0130K \u00dcRET\u0130M\u0130 EKOS\u0130STEM\u0130NE DAMGA VURACAK<\/strong><\/h3>\n<p>MW100\u2019\u00fcn enerji sekt\u00f6r\u00fcn\u00fcn yat\u0131r\u0131mc\u0131 profilini detayl\u0131 \u015fekilde ortaya koydu\u011funu vurgulayan Kearney T\u00fcrkiye Direkt\u00f6r\u00fc Onur Okutur, \u201cT\u00fcrkiye\u2019nin elektrik \u00fcretimi kurulu g\u00fcc\u00fc 106 bin MW\u2019leri bulurken, yeni kurulumlar\u0131n tamam\u0131na yak\u0131n\u0131 yenilenebilir kaynaklara dayal\u0131 elektrik \u00fcretim tesislerinden olu\u015ftu\u201d dedi. Enerji y\u00f6netiminin son d\u00f6nemde depolama yat\u0131r\u0131m\u0131 \u015fartl\u0131 s\u0131f\u0131rdan elektrik \u00fcretim tesisi lisanslar\u0131 vermeye ba\u015flad\u0131\u011f\u0131n\u0131 belirten Okutur, \u201cA\u00e7\u0131lan bu kap\u0131dan giren yat\u0131r\u0131mlar\u0131n \u00f6n\u00fcm\u00fczdeki y\u0131llarda elektrik \u00fcretim ekosisteminin geli\u015fimine damga vuracak fakt\u00f6rler aras\u0131nda yer alaca\u011f\u0131n\u0131 s\u00f6ylemek yanl\u0131\u015f olmaz\u201d de\u011ferlendirmesini yapt\u0131.<\/p>\n<h3><strong>MEHMET KARA: KURULU G\u00dc\u00c7LE ELEKTR\u0130K \u00dcRET\u0130M\u0130 M\u0130KTARI AYRI\u015eTI<\/strong><\/h3>\n<p>Enerji G\u00fcnl\u00fc\u011f\u00fc Genel Yay\u0131n Y\u00f6netmeni Mehmet Kara ise MW100\u2019\u00fcn ilk kez yay\u0131nland\u0131\u011f\u0131 be\u015f y\u0131l \u00f6nceye g\u00f6re elektrik sekt\u00f6r\u00fcnde b\u00fcy\u00fck bir farkl\u0131l\u0131k oldu\u011funu belirterek \u015funlar\u0131 s\u00f6yledi: <em>\u201cAradan ge\u00e7en s\u00fcrede kurulu g\u00fc\u00e7 ile \u00fcretilen elektrik miktar\u0131 aras\u0131ndaki ba\u011f neredeyse koptu. Ancak bu, korkulacak bir durumdan kaynaklanm\u0131yor. Son y\u0131llarda devreye giren yeni elektrik \u00fcretim santrallerinin tamam\u0131na yak\u0131n\u0131n\u0131 yenilenebilir kaynaklara dayal\u0131 tesisler olu\u015fturuyor. G\u00fcne\u015f ve r\u00fczg\u00e2r santralleri sadece g\u00fcn \u0131\u015f\u0131rken ve r\u00fczg\u00e2r eserken \u00e7al\u0131\u015ft\u0131klar\u0131 i\u00e7in kurulu g\u00fc\u00e7leri y\u00fcksek bile olsa, \u00fcrettikleri elektrik miktar\u0131 buna g\u00f6re olu\u015fuyor. Bir di\u011fer fakt\u00f6r de yenilenebilir kaynaklar\u0131n elektrik \u00fcretim maliyetlerini d\u00fc\u015f\u00fcrmesiyle, k\u00f6m\u00fcre dayal\u0131 santrallerin y\u0131ll\u0131k ortalama \u00e7al\u0131\u015fma s\u00fcrelerinin \u00e7ok d\u00fc\u015fmesi.\u201d<\/em><\/p>\n<h3><strong>L\u0130STEYE 4 YEN\u0130 \u015e\u0130RKET G\u0130RD\u0130<\/strong><\/h3>\n<p>MW100 listesine bu sene 4 yeni \u015firket dahil oldu. Yeni kat\u0131lan \u015firketlerden Doruk Madencilik, 145 MWe yerli k\u00f6m\u00fcr yat\u0131r\u0131m\u0131 ile 74. s\u0131rada yer ald\u0131. 78\u2019inci s\u0131radaki Genergy\u2019nin 136 MWe do\u011fal gaza dayal\u0131 elektrik \u00fcretim kapasitesi bulunuyor. Ecogreen Enerji Holding\u2019in g\u00fcne\u015f enerjisi alan\u0131ndaki yat\u0131r\u0131mlar\u0131 dikkat \u00e7ekiyor ve 96 MWe g\u00fcne\u015f kurulu g\u00fcc\u00fc ile 92. s\u0131rada yer al\u0131yor.<\/p>\n<h3><strong>ELEKTR\u0130K \u00dcRET\u0130M VE KURULU G\u00dc\u00c7 L\u0130STES\u0130NDEK\u0130 FARKLILIKLAR<\/strong><\/h3>\n<p>Kurulu g\u00fc\u00e7 kriterine g\u00f6re yap\u0131lan \u201cMW100, T\u00fcrkiye\u2019nin En B\u00fcy\u00fck 100 Elektrik \u00dcreticisi\u201d listesinde ilk s\u0131rada yer alan E\u00dcA\u015e, elektrik \u00fcretiminde de birinci s\u0131rada yer ald\u0131. E\u00dcA\u015e\u2019a ba\u011fl\u0131 santraller 2022 y\u0131l\u0131nda 43,4 TWh elektrik \u00fcretti. Bu T\u00fcrkiye\u2019nin toplam elektrik \u00fcretiminin y\u00fczde 13\u2019\u00fcne kar\u015f\u0131l\u0131k geliyor.<\/p>\n<p>\u00d6zel sekt\u00f6rde ise ilk s\u0131ra 18,4 TWh ile Eren Enerji\u2019nin oldu. 2022\u2019de 3. s\u0131rada yer alan Enerjisa \u00dcretim 13,1 TWh \u00fcretim ile yerini korudu.<\/p>\n<h3><strong>KAYNAKLAR BAZINDA TOP 10 ELEKTR\u0130K \u00dcRET\u0130C\u0130LER\u0130<\/strong><\/h3>\n<p>MW100 T\u00fcrkiye Ara\u015ft\u0131rmas\u0131, kurulu \u00fcretim kapasitesine g\u00f6re elektrik sekt\u00f6r\u00fcn\u00fcn kaynaklar baz\u0131ndaki Top 10 (\u0130lk 10) listelerini de belirledi.<\/p>\n<h3 style=\"text-align: center;\"><strong>Do\u011falgaz<\/strong><\/h3>\n<p><img loading=\"lazy\" class=\"wp-image-185133 aligncenter\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/02\/02-1.jpg\" alt=\"\" width=\"400\" height=\"381\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/02\/02-1.jpg 504w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/02\/02-1-300x286.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/02\/02-1-420x400.jpg 420w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/02\/02-1-53x50.jpg 53w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/02\/02-1-500x476.jpg 500w\" sizes=\"(max-width: 400px) 100vw, 400px\" \/><\/p>\n<h3 style=\"text-align: center;\">K\u00f6m\u00fcr<\/h3>\n<p style=\"text-align: center;\"><img loading=\"lazy\" class=\"aligncenter wp-image-185132\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/02\/03-1.jpg\" alt=\"\" width=\"400\" height=\"379\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/02\/03-1.jpg 507w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/02\/03-1-300x284.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/02\/03-1-423x400.jpg 423w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/02\/03-1-53x50.jpg 53w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/02\/03-1-500x473.jpg 500w\" sizes=\"(max-width: 400px) 100vw, 400px\" \/><\/p>\n<h3 style=\"text-align: center;\"><strong>Hidroelektrik<\/strong><\/h3>\n<p style=\"text-align: center;\"><img loading=\"lazy\" class=\"aligncenter wp-image-185131\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/02\/04-1.jpg\" alt=\"\" width=\"400\" height=\"375\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/02\/04-1.jpg 512w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/02\/04-1-300x281.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/02\/04-1-427x400.jpg 427w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/02\/04-1-53x50.jpg 53w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/02\/04-1-500x469.jpg 500w\" sizes=\"(max-width: 400px) 100vw, 400px\" \/><\/p>\n<h3 style=\"text-align: center;\"><strong>R\u00fczgar<\/strong><\/h3>\n<p style=\"text-align: center;\"><img loading=\"lazy\" class=\"aligncenter wp-image-185130\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/02\/05.jpg\" alt=\"\" width=\"400\" height=\"376\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/02\/05.jpg 510w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/02\/05-300x282.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/02\/05-425x400.jpg 425w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/02\/05-53x50.jpg 53w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/02\/05-500x471.jpg 500w\" sizes=\"(max-width: 400px) 100vw, 400px\" \/><\/p>\n<h3 style=\"text-align: center;\"><strong>G\u00fcne\u015f<\/strong><\/h3>\n<p style=\"text-align: center;\"><img loading=\"lazy\" class=\"aligncenter wp-image-185129\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/02\/06.jpg\" alt=\"\" width=\"400\" height=\"378\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/02\/06.jpg 508w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/02\/06-300x283.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/02\/06-423x400.jpg 423w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/02\/06-53x50.jpg 53w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/02\/06-500x472.jpg 500w\" sizes=\"(max-width: 400px) 100vw, 400px\" \/><\/p>\n<h3 style=\"text-align: center;\"><strong>Jeotermal<\/strong><\/h3>\n<p style=\"text-align: center;\"><img loading=\"lazy\" class=\"aligncenter wp-image-185128\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/02\/07.jpg\" alt=\"\" width=\"400\" height=\"374\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/02\/07.jpg 514w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/02\/07-300x280.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/02\/07-428x400.jpg 428w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/02\/07-54x50.jpg 54w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/02\/07-500x467.jpg 500w\" sizes=\"(max-width: 400px) 100vw, 400px\" \/><\/p>\n<p>Rapor Hakk\u0131nda Detayl\u0131 Bilgi \u0130\u00e7in: <a href=\"https:\/\/www.mw100.net\/?p=61\" target=\"_blank\" rel=\"noopener\">https:\/\/www.mw100.net\/?p=61<\/a> adresini ziyaret edebilirsiniz.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Enerji G\u00fcnl\u00fc\u011f\u00fc ve uluslararas\u0131 dan\u0131\u015fmanl\u0131k kurulu\u015fu Kearney taraf\u0131ndan haz\u0131rlanan MW100 &#8211; T\u00fcrkiye&#8217;nin En B\u00fcy\u00fck Elektrik \u00dcreticileri Raporu&#8217;nun 5&#8217;incisi yay\u0131nland\u0131. Elektrik \u00fcreticilerinin 31 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":185135,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[46,51,53,49,47,48,24649,50],"tags":[92,112710,19,24144,18,35365,1165,1033,227,70,58,65699,1675,108405,69],"views":239,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/185127"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=185127"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/185127\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/185135"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=185127"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=185127"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=185127"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}