{"id":184622,"date":"2024-02-16T14:44:45","date_gmt":"2024-02-16T11:44:45","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=184622"},"modified":"2024-02-16T14:49:54","modified_gmt":"2024-02-16T11:49:54","slug":"akfen-yenilenebilir-enerji-den-bir-haftada-66-mw-lik-3-ges-yatirimi-anlasmasi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/akfen-yenilenebilir-enerji-den-bir-haftada-66-mw-lik-3-ges-yatirimi-anlasmasi\/","title":{"rendered":"(Turkish) &#8217;Akfen Yenilenebilir Enerji&#8217;den 66 MW&#8217;l\u0131k 3 GES Yat\u0131r\u0131m\u0131 Anla\u015fmas\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/184622\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2><strong>G\u00fcne\u015f, su ve r\u00fczgar olarak sadece yerli ve yenilenebilir kaynaklardan \u00fcretim yapan 700 MW\u2019l\u0131k kurulu g\u00fcce sahip Akfen Yenilenebilir Enerji, bir hafta i\u00e7erisinde 3 farkl\u0131 yat\u0131r\u0131m anla\u015fmas\u0131 duyurdu. Toplam kurulu g\u00fcc\u00fc 66 MW b\u00fcy\u00fckl\u00fc\u011f\u00fcnde olacak ve 2024 y\u0131l\u0131 i\u00e7erisinde tamamlanacak bu 3 hibrit g\u00fcne\u015f enerji santrali (GES) projesiyle \u015firketin sadece yerli ve yenilenebilir kaynaklardan \u00fcretim yapan kurulu g\u00fcc\u00fc 766 MW\u2019a ula\u015facak. Yat\u0131r\u0131mlar 2024 y\u0131l\u0131 i\u00e7erisinde devreye al\u0131n\u0131p enerji \u00fcretimine ba\u015flayacak.<\/strong><\/h2>\n<p style=\"text-align: center;\"><img loading=\"lazy\" class=\"aligncenter wp-image-184624\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/02\/akfen-yenilenebilir-enerji-den-bir-haftada-66-mw-lik-3-ges-yatirimi.jpg\" alt=\"\" width=\"500\" height=\"326\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/02\/akfen-yenilenebilir-enerji-den-bir-haftada-66-mw-lik-3-ges-yatirimi.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/02\/akfen-yenilenebilir-enerji-den-bir-haftada-66-mw-lik-3-ges-yatirimi-300x196.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/02\/akfen-yenilenebilir-enerji-den-bir-haftada-66-mw-lik-3-ges-yatirimi-500x326.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/02\/akfen-yenilenebilir-enerji-den-bir-haftada-66-mw-lik-3-ges-yatirimi-77x50.jpg 77w\" sizes=\"(max-width: 500px) 100vw, 500px\" \/><\/p>\n<p><strong>G\u00fcne\u015f, su ve r\u00fczgar<\/strong> olarak sadece yerli ve yenilenebilir kaynaklardan \u00fcretim yapan <strong>700 MW\u2019l\u0131k kurulu g\u00fcce sahip<\/strong> <strong>Akfen Yenilenebilir Enerji<\/strong>, bir hafta i\u00e7erisinde <strong>3 farkl\u0131 yat\u0131r\u0131m<\/strong> anla\u015fmas\u0131 duyurdu.<\/p>\n<p>Toplam kurulu g\u00fcc\u00fc <strong>66 MW<\/strong> b\u00fcy\u00fckl\u00fc\u011f\u00fcnde olacak bu <strong>3 hibrit g\u00fcne\u015f enerji santrali (GES)<\/strong> projesiyle \u015firketin sadece yerli ve yenilenebilir kaynaklardan \u00fcretim yapan kurulu g\u00fcc\u00fc <strong>766 MW\u2019a<\/strong> ula\u015facak. Anahtar teslim m\u00fchendislik, tedarik ve in\u015faat i\u015fleri s\u00f6zle\u015fmesi imzalanan projeler <strong>2024 y\u0131l\u0131 i\u00e7erisinde tamamlanarak<\/strong> enerji \u00fcretmeye ba\u015flayacak.<\/p>\n<h3><strong>OSMAN\u0130YE VE \u00c7ANAKKALE\u2019DE <\/strong><strong>HAYATA GE\u00c7\u0130R\u0130LECEK<\/strong><\/h3>\n<p>Akfen Yenilenebilir Enerji\u2019nin GES yat\u0131r\u0131mlar\u0131ndan ikisi \u015firkete ait <strong>\u0130mbat Enerji<\/strong> \u00e7at\u0131s\u0131 alt\u0131nda i\u015fletilen <strong>Osmaniye\u2019deki 57 MW\u2019l\u0131k Sar\u0131tepe ve 23 MW\u2019l\u0131k Demirciler r\u00fczg\u00e2r enerji projelerinin (RES)<\/strong> alanlar\u0131nda hayata ge\u00e7irilecek. Hibrit GES olarak kurulacak projelerden <strong>Demirciler Hibrit GES projesi 13,27 MW<\/strong>, <strong>Sar\u0131tepe Hibrit GES projesi ise 12,98 MW<\/strong> g\u00fcce sahip olacak.<\/p>\n<p>Yap\u0131m\u0131na ba\u015flan\u0131lan \u00fc\u00e7\u00fcnc\u00fc hibrit GES projesi ise yine Akfen Yenilenebilir Enerji\u2019ye ait <strong>Derbent Enerji<\/strong> \u00e7at\u0131s\u0131 alt\u0131nda i\u015fletilen <strong>\u00c7anakkale\u2019deki 112,2 MW g\u00fcc\u00fcndeki \u00dc\u00e7p\u0131nar RES<\/strong> sahas\u0131nda hayata ge\u00e7ecek. <strong>\u00dc\u00e7p\u0131nar Hibrit GES<\/strong> ad\u0131yla kurulacak hibrit projenin kurulu g\u00fcc\u00fc <strong>40 MW g\u00fcc\u00fcnde<\/strong> olacak.<\/p>\n<p>2024 y\u0131l\u0131nda tamamlanacak 3 yeni hibrit GES santrali, \u00fczerinde kurulaca\u011f\u0131 tesisin kalan <strong>&#8220;Yenilenebilir Enerji Kaynaklar\u0131 Destekleme Mekanizmas\u0131 (YEKDEM)&#8221;<\/strong> s\u00fcresi boyunca, <strong>YEKDEM&#8217;den<\/strong> faydalanarak, ABD Dolar\u0131 bazl\u0131 sabit fiyat garantisinden faydalanabilecek.<\/p>\n<h3><strong>G\u00dcNG\u00d6R: S\u00dcRD\u00dcR\u00dcLEB\u0130L\u0130R ENERJ\u0130 <\/strong><strong>\u00dcRET\u0130M\u0130NE BA\u011eLILI\u011eIMIZI PEK\u0130\u015eT\u0130R\u0130YOR<img loading=\"lazy\" class=\"alignright wp-image-184625\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/02\/akfen-yenilenebilir-enerji-den-bir-haftada-66-mw-lik-3-ges-yatirimi-1.jpg\" alt=\"\" width=\"300\" height=\"265\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/02\/akfen-yenilenebilir-enerji-den-bir-haftada-66-mw-lik-3-ges-yatirimi-1.jpg 543w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/02\/akfen-yenilenebilir-enerji-den-bir-haftada-66-mw-lik-3-ges-yatirimi-1-300x265.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/02\/akfen-yenilenebilir-enerji-den-bir-haftada-66-mw-lik-3-ges-yatirimi-1-453x400.jpg 453w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/02\/akfen-yenilenebilir-enerji-den-bir-haftada-66-mw-lik-3-ges-yatirimi-1-57x50.jpg 57w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/02\/akfen-yenilenebilir-enerji-den-bir-haftada-66-mw-lik-3-ges-yatirimi-1-500x442.jpg 500w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/strong><\/h3>\n<p>Yat\u0131r\u0131mlar hakk\u0131nda bilgi veren <strong>Akfen Yenilenebilir Enerji Genel M\u00fcd\u00fcr\u00fc Mustafa Kemal G\u00fcng\u00f6r<\/strong>, <em>\u201cAkfen Yenilenebilir Enerji&#8217;nin bir hafta i\u00e7inde \u00fc\u00e7 farkl\u0131 yat\u0131r\u0131m anla\u015fmas\u0131 duyurmas\u0131, yenilenebilir kaynaklara odaklanan portf\u00f6y\u00fcn\u00fcn \u00f6nemli \u00f6l\u00e7\u00fcde geni\u015fledi\u011fini g\u00f6steriyor. Bu yeni giri\u015fimler, <strong>hibrit g\u00fcne\u015f enerjisi projeleri<\/strong> arac\u0131l\u0131\u011f\u0131yla toplamda <strong>66 MW kapasite<\/strong> ekleyerek \u015firketin s\u00fcrd\u00fcr\u00fclebilir enerji \u00fcretimine olan ba\u011fl\u0131l\u0131\u011f\u0131n\u0131 peki\u015ftiriyor. Gelece\u011fe d\u00f6n\u00fck olarak, yeni yat\u0131r\u0131m f\u0131rsatlar\u0131n\u0131 takip etmeye ve g\u00fc\u00e7l\u00fc stratejimizi s\u00fcrd\u00fcrmeye devam ediyoruz. Her yeni proje ile yenilenebilir enerji alan\u0131nda lider konumumuzu g\u00fc\u00e7lendirerek, daha parlak ve s\u00fcrd\u00fcr\u00fclebilir bir gelecek i\u00e7in \u00e7al\u0131\u015fmalar\u0131m\u0131z\u0131 s\u00fcrd\u00fcr\u00fcyoruz\u201d <\/em>ifadelerini kulland\u0131.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. G\u00fcne\u015f, su ve r\u00fczgar olarak sadece yerli ve yenilenebilir kaynaklardan \u00fcretim yapan 700 MW\u2019l\u0131k kurulu g\u00fcce sahip Akfen Yenilenebilir Enerji, bir hafta [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":184624,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49],"tags":[28245,112547,18,35307,112545,112550,112546,112548,842,112549,105],"views":59,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/184622"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=184622"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/184622\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/184624"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=184622"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=184622"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=184622"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}