{"id":184431,"date":"2024-02-12T17:50:15","date_gmt":"2024-02-12T14:50:15","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=184431"},"modified":"2024-02-12T17:50:15","modified_gmt":"2024-02-12T14:50:15","slug":"2024-ocak-ayinda-toplam-kurulu-gucun-yuzde-11-lik-kismi-gunes-ten","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/2024-ocak-ayinda-toplam-kurulu-gucun-yuzde-11-lik-kismi-gunes-ten\/","title":{"rendered":"(Turkish) 2024 Ocak Ay\u0131nda Toplam Kurulu G\u00fcc\u00fcn %11,0\u2019l\u0131k K\u0131sm\u0131 G\u00fcne\u015f&#8217;ten&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/184431\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2><strong>2023 y\u0131l\u0131 Aral\u0131k ay\u0131 sonunda 107.050 MW olan toplam kurulu g\u00fc\u00e7 de\u011feri 208,42 MW\u2019l\u0131k art\u0131\u015fla 2024 y\u0131l\u0131 Ocak ay\u0131 sonunda 107.259 MW olarak kaydedildi. TE\u0130A\u015e taraf\u0131ndan yay\u0131mlanan \u00fcretim verilerine g\u00f6re, 2024 Ocak ay\u0131nda termik santrallerin ger\u00e7ekle\u015fen toplam \u00fcretimdeki pay\u0131 %50,61 olarak kaydedildi. Yenilenebilir enerji kaynaklar\u0131ndan elde edilen elektrik \u00fcretiminin pay\u0131 ise %49,39 olarak ger\u00e7ekle\u015fti.<\/strong><\/h2>\n<p style=\"text-align: center;\"><img loading=\"lazy\" class=\"aligncenter wp-image-184437\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/02\/2024-ocak-ayinda-toplam-kurulu-gucun-yuzde-11-lik-kismi-gunes-ten-1.jpg\" alt=\"\" width=\"500\" height=\"334\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/02\/2024-ocak-ayinda-toplam-kurulu-gucun-yuzde-11-lik-kismi-gunes-ten-1.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/02\/2024-ocak-ayinda-toplam-kurulu-gucun-yuzde-11-lik-kismi-gunes-ten-1-300x200.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/02\/2024-ocak-ayinda-toplam-kurulu-gucun-yuzde-11-lik-kismi-gunes-ten-1-500x334.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/02\/2024-ocak-ayinda-toplam-kurulu-gucun-yuzde-11-lik-kismi-gunes-ten-1-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/02\/2024-ocak-ayinda-toplam-kurulu-gucun-yuzde-11-lik-kismi-gunes-ten-1-450x300.jpg 450w\" sizes=\"(max-width: 500px) 100vw, 500px\" \/><\/p>\n<p>Aplus Enerji taraf\u0131ndan haz\u0131rlanan analizde, 2024 y\u0131l\u0131 Ocak ay\u0131 sonunda olu\u015fan toplam kurulu g\u00fcc\u00fcn %23,7\u2019lik k\u0131sm\u0131 (25.397 MW) do\u011fal gaz ve LNG yak\u0131t tipi santralleri ile kar\u015f\u0131lan\u0131rken, %22,0\u2019l\u0131k k\u0131sm\u0131 (23.650 MW) barajl\u0131 hidrolik santraller taraf\u0131ndan kar\u015f\u0131land\u0131. Bu yak\u0131t tiplerini %10,7\u2019lik (11.440 MW) oran ile yerli k\u00f6m\u00fcr santralleri ve %9,7\u2019lik oran (10.374 MW) ile ithal k\u00f6m\u00fcr santralleri izledi. Akarsu tipi hidrolik santraller %7,8\u2019lik bir orana (8.320 MW) sahipken, r\u00fczg\u00e2r santralleri toplam kurulu g\u00fcc\u00fcn %11,1\u2019lik bir k\u0131sm\u0131n\u0131 (11.886 MW) olu\u015fturdu. Toplam kurulu g\u00fcc\u00fcn %11,0\u2019l\u0131k k\u0131sm\u0131 (11.829 MW) g\u00fcne\u015f enerjisi santralleri, %1,6\u2019l\u0131k k\u0131sm\u0131 (1.691 MW) jeotermal enerji santrallerinden olu\u015furken %2,5\u2019lik k\u0131sm\u0131 (2.671 MW) ise di\u011fer termik santraller taraf\u0131ndan olu\u015fturuldu.<\/p>\n<p style=\"text-align: center;\"><img loading=\"lazy\" class=\"aligncenter wp-image-184435\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/02\/2024-ocak-ayinda-toplam-kurulu-gucun-yuzde-11-lik-kismi-gunes-ten.jpg\" alt=\"\" width=\"500\" height=\"274\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/02\/2024-ocak-ayinda-toplam-kurulu-gucun-yuzde-11-lik-kismi-gunes-ten.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/02\/2024-ocak-ayinda-toplam-kurulu-gucun-yuzde-11-lik-kismi-gunes-ten-300x164.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/02\/2024-ocak-ayinda-toplam-kurulu-gucun-yuzde-11-lik-kismi-gunes-ten-500x274.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/02\/2024-ocak-ayinda-toplam-kurulu-gucun-yuzde-11-lik-kismi-gunes-ten-80x44.jpg 80w\" sizes=\"(max-width: 500px) 100vw, 500px\" \/><\/p>\n<p>Toplam kurulu g\u00fcc\u00fcn %66,9\u2019luk (71.706 MW) k\u0131sm\u0131n\u0131 serbest \u00fcretim \u015firketleri olu\u015ftururken, E\u00dcA\u015e santrallerinin toplam kurulu g\u00fc\u00e7teki pay\u0131 %19,9 (21.391 MW) seviyesindedir. Yap i\u015flet devret santralleri %0,1\u2019lik (116 MW), i\u015fletme hakk\u0131 devredilen santraller %3,0\u2019l\u0131k (3,190 MW) bir orana sahiptir. Lisanss\u0131z santrallerin toplam kurulu g\u00fc\u00e7 i\u00e7indeki pay\u0131 da %10,1 (10.856 MW) olarak kaydedildi.<\/p>\n<p>Kaynak:\u00a0<a href=\"https:\/\/www.tenva.org\/aplus-enerji-ocak-2024-analizi\/\" target=\"_blank\" rel=\"noopener\">Aplus Enerji \/TENVA<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. 2023 y\u0131l\u0131 Aral\u0131k ay\u0131 sonunda 107.050 MW olan toplam kurulu g\u00fc\u00e7 de\u011feri 208,42 MW\u2019l\u0131k art\u0131\u015fla 2024 y\u0131l\u0131 Ocak ay\u0131 sonunda 107.259 MW [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":184437,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49],"tags":[35668,19,18,112476,13,1582,842,105],"views":139,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/184431"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=184431"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/184431\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/184437"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=184431"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=184431"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=184431"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}