{"id":184150,"date":"2024-02-06T14:26:57","date_gmt":"2024-02-06T11:26:57","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=184150"},"modified":"2024-02-06T14:26:57","modified_gmt":"2024-02-06T11:26:57","slug":"rosatom-yakutistan-daki-dusuk-guclu-nukleer-santralin-isletmecisi-oldu","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/rosatom-yakutistan-daki-dusuk-guclu-nukleer-santralin-isletmecisi-oldu\/","title":{"rendered":"(Turkish) &#8217;Rosatom&#8217; Yakutistan\u2019daki D\u00fc\u015f\u00fck G\u00fc\u00e7l\u00fc N\u00fckleer Santralin \u0130\u015fletmecisi Oldu"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/184150\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2>Rusya Devlet N\u00fckleer Enerji Kurulu\u015fu Rosatom\u2019un elektrik enerjisi b\u00f6l\u00fcm\u00fcn\u00fcn bir par\u00e7as\u0131 olan Rosenergoatom Concern A.\u015e., Yakutistan\u2019da in\u015fa edilen d\u00fcnyan\u0131n ilk kara tabanl\u0131 k\u00fc\u00e7\u00fck mod\u00fcler reakt\u00f6r\u00fc (SMR) Yakutsk\u2019un i\u015fletmeci kurulu\u015fu stat\u00fcs\u00fc kazand\u0131. \u0130lgili kararname Rosatom Genel M\u00fcd\u00fcr\u00fc Aleksey Likhachev taraf\u0131ndan imzaland\u0131.<\/h2>\n<p style=\"text-align: center;\"><img loading=\"lazy\" class=\"aligncenter wp-image-184153\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/02\/rosatom-yakutistan-daki-dusuk-guclu-nukleer-santralin-isletmecisi-oldu-1.jpg\" alt=\"\" width=\"500\" height=\"334\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/02\/rosatom-yakutistan-daki-dusuk-guclu-nukleer-santralin-isletmecisi-oldu-1.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/02\/rosatom-yakutistan-daki-dusuk-guclu-nukleer-santralin-isletmecisi-oldu-1-300x200.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/02\/rosatom-yakutistan-daki-dusuk-guclu-nukleer-santralin-isletmecisi-oldu-1-500x334.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/02\/rosatom-yakutistan-daki-dusuk-guclu-nukleer-santralin-isletmecisi-oldu-1-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/02\/rosatom-yakutistan-daki-dusuk-guclu-nukleer-santralin-isletmecisi-oldu-1-450x300.jpg 450w\" sizes=\"(max-width: 500px) 100vw, 500px\" \/><\/p>\n<p>Rusya\u2019n\u0131n en son geli\u015ftirdi\u011fi d\u00fc\u015f\u00fck g\u00fc\u00e7l\u00fc RITM-200N su so\u011futmal\u0131 SMR, kara tabanl\u0131 konu\u015fland\u0131rma i\u00e7in yenilik\u00e7i gemi teknolojisinin uyarlamas\u0131 olma \u00f6zelli\u011fi ta\u015f\u0131yor. RITM-200 serisi reakt\u00f6rler, Kuzey Kutbu\u2019nun zorlu ko\u015fullar\u0131nda en yeni Rus buzk\u0131ranlarda test edildi.<\/p>\n<p>Geleneksel n\u00fckleer g\u00fc\u00e7 santrallere (NGS) k\u0131yasla \u00e7ok daha k\u00fc\u00e7\u00fck olacak olan Yakutsk, boyutu sayesinde de k\u0131sa s\u00fcrede in\u015fa edilecek. Ust-Kuiga yerle\u015fim yerindeki haz\u0131rl\u0131k \u00e7al\u0131\u015fmalar\u0131 t\u00fcm h\u0131z\u0131yla devam ediyor. 250 ki\u015filik ilk i\u015f\u00e7i kamp\u0131n\u0131n (VGS-1) in\u015faat\u0131na y\u00f6nelik \u00e7al\u0131\u015fmalar tamamlan\u0131rken, 2024 y\u0131l\u0131n\u0131n d\u00f6rd\u00fcnc\u00fc \u00e7eyre\u011finde tamamlanmas\u0131 planlanan 683 ki\u015filik ikinci i\u015f\u00e7i kamp\u0131n\u0131n ilk etab\u0131n\u0131n in\u015faat\u0131na ba\u015fland\u0131. Ust-Kuiga yerle\u015fim yerini Yakutsk sahas\u0131na ba\u011flayan 12 km uzunlu\u011fundaki 1 numaral\u0131 yolun yap\u0131m\u0131na ve Pridorozhny ta\u015f oca\u011f\u0131ndan toprak ve ta\u015f gibi malzemelerin \u00e7\u0131kar\u0131lmas\u0131na da ba\u015fland\u0131.<\/p>\n<p>\u00d6te yandan bu y\u0131l i\u00e7inde \u00fcretim ve teknik temel ile in\u015faat ve montaj tesislerinin in\u015fas\u0131n\u0131n, in\u015faat sahas\u0131n\u0131n tesviyesinin ve in\u015faat ile montaj \u00e7al\u0131\u015fmalar\u0131n\u0131n ana a\u015famas\u0131n\u0131n ba\u015flamas\u0131 planlan\u0131yor. Ge\u00e7ici k\u0131\u015f rotas\u0131 i\u015fletimi d\u00f6neminde \u00f6ng\u00f6r\u00fclen \u00e7al\u0131\u015fmalar\u0131n yap\u0131labilmesi i\u00e7in 9,5 bin ton y\u00fck\u00fcn getirilmesi planlan\u0131yor.<\/p>\n<p>Rusya\u2019n\u0131n Arktik b\u00f6lgesi, elektrik s\u0131k\u0131nt\u0131s\u0131 \u00e7eken ve yerel enerji olmadan kalk\u0131nman\u0131n imk\u00e2ns\u0131z oldu\u011fu b\u00f6lgelerden biri olma \u00f6zelli\u011fini ta\u015f\u0131yor. Devletin geli\u015ftirilmesine stratejik \u00f6nem verdi\u011fi, bu b\u00f6lgede b\u00fcy\u00fck g\u00fc\u00e7 santrallerinin in\u015fas\u0131n\u0131n ekonomik a\u00e7\u0131dan m\u00fcmk\u00fcn olmamas\u0131 sebebiyle Rosatom, bu t\u00fcr b\u00f6lgelerde d\u00fc\u015f\u00fck g\u00fc\u00e7l\u00fc \u00fcretim projelerini art\u0131rmaya karar vermi\u015fti. Bu ama\u00e7la Pevek kentinde faaliyet g\u00f6steren y\u00fczer n\u00fckleer g\u00fc\u00e7 santrali, halihaz\u0131rda sadece Bilibino N\u00fckleer Santrali\u2019nin kapasitesinin yenilenmesiyle de\u011fil, ayn\u0131 zamanda Baimsk cevher b\u00f6lgesindeki projelerin uygulanmas\u0131yla da ilgili sorunlar\u0131 \u00e7\u00f6z\u00fcyor.<\/p>\n<p>Rosatom ve Yakutistan h\u00fck\u00fcmeti 2019 y\u0131l\u0131nda ilk kara tabanl\u0131 k\u00fc\u00e7\u00fck mod\u00fcler reakt\u00f6r Yakutsk\u2019un in\u015fa edilmesi i\u00e7in anla\u015fma imzalad\u0131. Bu proje sayesinde Yakutistan\u2019\u0131n kuzeydeki \u00fccra b\u00f6lgeleri, Kyuchus alt\u0131n yata\u011f\u0131n\u0131n ve di\u011fer maden yataklar\u0131n\u0131n geli\u015ftirilmesi i\u00e7in g\u00fcvenilir ve y\u00fcksek kaliteli bir enerji kayna\u011f\u0131 elde edecek. Nisan 2023\u2019te Rusya Federasyonu Federal \u00c7evre, Sanayi ve N\u00fckleer Denetim Kurumu Rostekhnadzor\u2019dan lisans al\u0131nmas\u0131yla da bu projenin hayata ge\u00e7irilmesinde \u00f6nemli bir ad\u0131m at\u0131lm\u0131\u015f oldu.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Rusya Devlet N\u00fckleer Enerji Kurulu\u015fu Rosatom\u2019un elektrik enerjisi b\u00f6l\u00fcm\u00fcn\u00fcn bir par\u00e7as\u0131 olan Rosenergoatom Concern A.\u015e., Yakutistan\u2019da in\u015fa edilen d\u00fcnyan\u0131n ilk kara tabanl\u0131 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":184152,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,43],"tags":[112360,19356,2587,112359,65627,112361],"views":18,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/184150"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=184150"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/184150\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/184152"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=184150"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=184150"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=184150"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}