{"id":184119,"date":"2024-02-05T17:07:07","date_gmt":"2024-02-05T14:07:07","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=184119"},"modified":"2024-02-05T17:07:23","modified_gmt":"2024-02-05T14:07:23","slug":"isdemir-corum-da-130-mw-gunes-enerjisi-santrali-kuracak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/isdemir-corum-da-130-mw-gunes-enerjisi-santrali-kuracak\/","title":{"rendered":"(Turkish) &#8217;\u0130SDEM\u0130R&#8217; \u00c7orum\u2019da 130 MW G\u00fcne\u015f Enerjisi Santrali Kuracak"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/184119\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2><strong>\u0130skenderun Demir ve \u00c7elik A.\u015e. (\u0130SDEM\u0130R), Hatay tesisinin elektrik ihtiyac\u0131n\u0131 kar\u015f\u0131lamak i\u00e7in \u00c7orum\u2019da 130 MW G\u00fcne\u015f Enerji Santrali kuracak.<\/strong><\/h2>\n<p style=\"text-align: center;\"><img loading=\"lazy\" class=\"aligncenter wp-image-184121\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/02\/isdemir-corum-da-130-mw-gunes-enerjisi-santrali-kuracak.jpg\" alt=\"\" width=\"500\" height=\"382\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/02\/isdemir-corum-da-130-mw-gunes-enerjisi-santrali-kuracak.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/02\/isdemir-corum-da-130-mw-gunes-enerjisi-santrali-kuracak-300x229.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/02\/isdemir-corum-da-130-mw-gunes-enerjisi-santrali-kuracak-500x382.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/02\/isdemir-corum-da-130-mw-gunes-enerjisi-santrali-kuracak-65x50.jpg 65w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/02\/isdemir-corum-da-130-mw-gunes-enerjisi-santrali-kuracak-260x200.jpg 260w\" sizes=\"(max-width: 500px) 100vw, 500px\" \/><\/p>\n<p>\u0130sdemir, Hatay tesisinin elektrik ihtiyac\u0131n\u0131 kar\u015f\u0131lamak i\u00e7in <strong>4,5 milyar lira<\/strong> yat\u0131r\u0131mla \u00c7orum\u2019da <strong>130 MW<\/strong> G\u00fcne\u015f Enerji Santrali kuracak. \u0130skenderun Demir ve \u00c7elik A.\u015e. \u00c7orum merkez il\u00e7eye ba\u011fl\u0131, Derek\u00f6y k\u00f6y\u00fc s\u0131n\u0131rlar\u0131nda <strong>194 hektarl\u0131k<\/strong> alanda <strong>\u00f6zt\u00fcketim amac\u0131yla kurmay\u0131 planlad\u0131\u011f\u0131<\/strong> g\u00fcne\u015f enerji santralinde m\u00fccbir sebepler nedeniyle yer de\u011fi\u015fikli\u011fi yapacak. \u015eirket, 130 MW kurulu g\u00fcc\u00fcnde <strong>\u0130sdemir \u00c7orum Alaca G\u00fcne\u015f Enerji Santrali\u2019ni (GES)<\/strong> \u00c7orum ili, Alaca il\u00e7esi, Per\u00e7em k\u00f6y\u00fc s\u0131n\u0131rlar\u0131 i\u00e7inde kurmay\u0131 planl\u0131yor. Projenin de\u011feri <strong>4,5 milyar lira<\/strong> olarak hesaplan\u0131yor.<\/p>\n<p>Proje kapsam\u0131nda <strong>550 Wp<\/strong> g\u00fcc\u00fcnde <strong>310 bin 905 adet<\/strong> panel kurulacak. Santralde y\u0131lda <strong>280 milyon Kwh\u2019den fazla<\/strong> elektrik \u00fcretilmesi \u00f6ng\u00f6r\u00fcl\u00fcyor. \u00dcretilecek olan elektrik <strong>\u0130skenderun Demir ve \u00c7elik A.\u015e\u2019ye<\/strong> ait <strong>Hatay tesisinin<\/strong> t\u00fcketimini kar\u015f\u0131lamak amac\u0131 ile kullan\u0131laca\u011f\u0131 \u00f6\u011frenildi.<\/p>\n<p>Kaynak: \u0130hlas Haber Ajans\u0131<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. \u0130skenderun Demir ve \u00c7elik A.\u015e. (\u0130SDEM\u0130R), Hatay tesisinin elektrik ihtiyac\u0131n\u0131 kar\u015f\u0131lamak i\u00e7in \u00c7orum\u2019da 130 MW G\u00fcne\u015f Enerji Santrali kuracak. \u0130sdemir, Hatay tesisinin [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":184121,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49],"tags":[24013,2326,2569,43487,112348,112347,112346],"views":83,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/184119"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=184119"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/184119\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/184121"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=184119"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=184119"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=184119"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}