{"id":183093,"date":"2024-01-09T16:45:42","date_gmt":"2024-01-09T13:45:42","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=183093"},"modified":"2024-01-09T16:45:58","modified_gmt":"2024-01-09T13:45:58","slug":"bim-gunes-enerjisi-santrali-yatirimlarina-devam-ediyor","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/bim-gunes-enerjisi-santrali-yatirimlarina-devam-ediyor\/","title":{"rendered":"(Turkish) &#8217;B\u0130M&#8217; G\u00fcne\u015f Enerjisi Santrali Yat\u0131r\u0131mlar\u0131na Devam Ediyor"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/183093\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2>Ya\u015fanabilir bir \u00e7evre ve s\u00fcrd\u00fcr\u00fclebilir bir gelecek i\u00e7in yenilenebilir enerji yat\u0131r\u0131mlar\u0131na devam eden B\u0130M, 16. GES\u2019i \u00c7umra deposuna kurdu.<\/h2>\n<p style=\"text-align: center;\"><img loading=\"lazy\" class=\"aligncenter wp-image-183095\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/01\/bim-gunes-enerjisi-santrali-yatirimlarina-devam-ediyor.jpg\" alt=\"\" width=\"500\" height=\"289\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/01\/bim-gunes-enerjisi-santrali-yatirimlarina-devam-ediyor.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/01\/bim-gunes-enerjisi-santrali-yatirimlarina-devam-ediyor-300x173.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/01\/bim-gunes-enerjisi-santrali-yatirimlarina-devam-ediyor-500x289.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/01\/bim-gunes-enerjisi-santrali-yatirimlarina-devam-ediyor-80x46.jpg 80w\" sizes=\"(max-width: 500px) 100vw, 500px\" \/><\/p>\n<p>554 kWp kurulu g\u00fcce sahip G\u00fcne\u015f Enerjisi Santrali ile depo enerji ihtiyac\u0131n\u0131n %100\u2019\u00fc do\u011fal kaynaklardan kar\u015f\u0131lan\u0131rken karbon sal\u0131m\u0131nda y\u0131ll\u0131k 435 ton azalma sa\u011flanacak. 302 hanenin y\u0131ll\u0131k enerji t\u00fcketimine denk \u00fcretim yapacak olan <strong>\u00c7umra GES<\/strong> ile y\u0131ll\u0131k toplam a\u011fa\u00e7 kazan\u0131m\u0131 6.700 adet olacak.<\/p>\n<p>2020 y\u0131l\u0131ndan bu yana GES yat\u0131r\u0131mlar\u0131na devam eden B\u0130M ilk \u00f6nce <strong>Batman<\/strong>, ard\u0131ndan <strong>\u0130stanbul Arnavutk\u00f6y, I\u011fd\u0131r, Denizli, \u0130stanbul Samand\u0131ra, Erzurum, Aksaray, Isparta, L\u00fcleburgaz, Bal\u0131kesir, Ankara Sincan, Kastamonu, \u015eanl\u0131urfa ve Ankara G\u00fczelhisar<\/strong> olmak \u00fczere \u00fclke genelinde <strong>15 b\u00f6lgede<\/strong> bulunan<strong> depolar\u0131na g\u00fcne\u015f enerjisi sistemi<\/strong> kurdu.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Ya\u015fanabilir bir \u00e7evre ve s\u00fcrd\u00fcr\u00fclebilir bir gelecek i\u00e7in yenilenebilir enerji yat\u0131r\u0131mlar\u0131na devam eden B\u0130M, 16. GES\u2019i \u00c7umra deposuna kurdu. 554 kWp kurulu [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":183095,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49],"tags":[46776,111970,111971,21886,431,842,1245],"views":60,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/183093"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=183093"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/183093\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/183095"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=183093"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=183093"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=183093"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}