{"id":183070,"date":"2024-01-09T15:21:42","date_gmt":"2024-01-09T12:21:42","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=183070"},"modified":"2024-01-09T15:21:42","modified_gmt":"2024-01-09T12:21:42","slug":"mega-metal-kuracagi-iki-ges-ile-yesil-enerji-yatirimlarina-basliyor","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/mega-metal-kuracagi-iki-ges-ile-yesil-enerji-yatirimlarina-basliyor\/","title":{"rendered":"(Turkish) &#8217;Mega Metal&#8217; Kuraca\u011f\u0131 \u0130ki GES ile Ye\u015fil Enerji Yat\u0131r\u0131mlar\u0131na Ba\u015fl\u0131yor"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/183070\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2><strong>Mega Metal, y\u0131ll\u0131k ortalama elektrik \u00fcretim miktarlar\u0131, K\u00fctahya GES Projesi 21 MW ve Bilecik GES Projesi 20 MW olan iki g\u00fcne\u015f enerjisi santrali kurma \u00e7al\u0131\u015fmalar\u0131na h\u0131z verdi. Santrallerin 2024 y\u0131l\u0131n\u0131n son \u00e7eyre\u011finde \u00fcretime ba\u015flamas\u0131 planlan\u0131yor. Mega Metal Y\u00f6netim Kurulu Ba\u015fkan\u0131 C\u00fcneyt Ali Turgut, \u201cK\u00fctahya\u2019daki projemizin y\u0131ll\u0131k ortalama elektrik \u00fcretimi, 21 MW, Bilecik\u2019teki projemizin ise 20 MW kapasitesinde olacak. Her iki projemiz devreye al\u0131nd\u0131\u011f\u0131nda \u015firketimizin elektrik t\u00fcketiminin y\u00fczde 75\u2019ini yenilenebilir enerjiden kar\u015f\u0131lamay\u0131 hedefliyoruz\u201d dedi.<\/strong><\/h2>\n<p>Katma de\u011ferli bak\u0131r tel sekt\u00f6r\u00fcn\u00fcn \u00f6nde gelen \u00fcreticilerinden biri olan Mega Metal, g\u00fcne\u015f enerjisi <img loading=\"lazy\" class=\"alignright wp-image-183073\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/01\/mega-metal-kuracagi-iki-ges-ile-yesil-enerji-yatirimlarina-basliyor-1.jpg\" alt=\"\" width=\"320\" height=\"308\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/01\/mega-metal-kuracagi-iki-ges-ile-yesil-enerji-yatirimlarina-basliyor-1.jpg 499w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/01\/mega-metal-kuracagi-iki-ges-ile-yesil-enerji-yatirimlarina-basliyor-1-300x289.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/01\/mega-metal-kuracagi-iki-ges-ile-yesil-enerji-yatirimlarina-basliyor-1-416x400.jpg 416w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/01\/mega-metal-kuracagi-iki-ges-ile-yesil-enerji-yatirimlarina-basliyor-1-52x50.jpg 52w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>projeleriyle \u00e7evresel s\u00fcrd\u00fcr\u00fclebilirlik yolunda \u00f6nemli ad\u0131mlar at\u0131yor. \u015eirket, <strong>Bilecik ve K\u00fctahya\u2019da<\/strong> yap\u0131lacak olan<strong> g\u00fcne\u015f enerjisi santralleriyle<\/strong> ye\u015fil enerji \u00fcretimine b\u00fcy\u00fck destek sa\u011flamay\u0131 ama\u00e7l\u0131yor.<\/p>\n<p>15 Aral\u0131k 2023\u2019te hisseleri Borsa \u0130stanbul\u2019da i\u015flem g\u00f6rmeye ba\u015flayan ve halka arzdan elde edilen gelirin yeni yat\u0131r\u0131mlarda kullan\u0131laca\u011f\u0131n\u0131 a\u00e7\u0131klayan Mega Metal, ger\u00e7ekle\u015ftirmeyi planlad\u0131\u011f\u0131 projelerle ilgili yat\u0131r\u0131mlar\u0131na h\u0131z verdi. Konuyla ilgili bir a\u00e7\u0131klama yapan <strong>Mega Metal Y\u00f6netim Kurulu Ba\u015fkan\u0131 C\u00fcneyt Ali Turgut<\/strong>, <em>\u201c7-8 Aral\u0131k\u2019ta rekor k\u0131ran bir talep toplama s\u00fcrecinin ard\u0131ndan \u015firket hisselerimiz, 15 Aral\u0131k tarihinde Borsa \u0130stanbul\u2019da i\u015flem g\u00f6rmeye ba\u015flad\u0131. Halka arz s\u00fcrecinde, elde edece\u011fimiz geliri hem yurt i\u00e7i hem de yurt d\u0131\u015f\u0131nda yeni yat\u0131r\u0131mlara imza atarak b\u00fcy\u00fcmek i\u00e7in kullanaca\u011f\u0131m\u0131z\u0131 s\u00f6ylemi\u015ftik. Bu do\u011frultuda planlar\u0131m\u0131z\u0131 h\u0131zl\u0131ca aksiyona \u00e7evirmeye y\u00f6nelik \u00e7al\u0131\u015fmalar\u0131m\u0131za devam ediyoruz.<\/em><\/p>\n<h3><strong>Elektrik T\u00fcketiminin Y\u00fczde 65\u2019i Yenilenebilir Kaynaklardan <\/strong><\/h3>\n<p>Daha \u00f6nce ald\u0131klar\u0131 lisanslar do\u011frultusunda Bilecik ve K\u00fctahya\u2019da g\u00fcne\u015f enerjisi santrali kurmak i\u00e7in harekete ge\u00e7tiklerini ve yat\u0131r\u0131m i\u00e7in \u00c7ED s\u00fcrecinin ba\u015flad\u0131\u011f\u0131n\u0131 belirten Turgut, <em>\u201cK\u00fctahya\u2019daki projemizin y\u0131ll\u0131k ortalama elektrik \u00fcretimi 21 MW, Bilecik\u2019teki projemizin ise 20 MW kapasitesinde olaca\u011f\u0131n\u0131 belirterek, \u201cHer iki projemiz devreye al\u0131nd\u0131\u011f\u0131nda \u015firketimizin elektrik t\u00fcketiminin y\u00fczde 75\u2019ini yenilenebilir enerjiden kar\u015f\u0131lamay\u0131 hedefliyoruz\u201d<\/em> \u015feklinde konu\u015ftu.<\/p>\n<p>GES projelerinin, Mega Metal\u2019in \u00e7evresel sorumluluklar\u0131n\u0131 yerine getirme ve ye\u015fil enerjiye olan katk\u0131s\u0131n\u0131 art\u0131rma yolundaki kararl\u0131l\u0131\u011f\u0131n\u0131 g\u00f6sterdi\u011fini belirten Turgut, a\u00e7\u0131klamalar\u0131na \u015f\u00f6yle devam etti: <em>\u201cHer iki santralimizin de 2024 y\u0131l\u0131n\u0131n son \u00e7eyre\u011finde \u00fcretime ba\u015flamas\u0131 hedefleniyor. Mega Metal\u2019in ye\u015fil enerjiye verdi\u011fi destek, \u00e7evresel s\u00fcrd\u00fcr\u00fclebilirlik ve Avrupa Ye\u015fil Mutabakat\u0131\u2019na uyum konusunda da \u00e7ok \u00f6nemli bir ad\u0131m olacak. \u0130lerleyen d\u00f6nemde hem yurt i\u00e7i hem de yurt d\u0131\u015f\u0131 talebi kar\u015f\u0131lamak i\u00e7in yeni \u00fcretim tesislerimizin yat\u0131r\u0131mlar\u0131na da ba\u015flayaca\u011f\u0131z. 2024 hem \u015firketimiz hem de \u00fclkemiz i\u00e7in istikrarl\u0131 bir b\u00fcy\u00fcme y\u0131l\u0131 olacak.\u201d<\/em><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Mega Metal, y\u0131ll\u0131k ortalama elektrik \u00fcretim miktarlar\u0131, K\u00fctahya GES Projesi 21 MW ve Bilecik GES Projesi 20 MW olan iki g\u00fcne\u015f enerjisi [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":183072,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[7440,21768,2206,111963,105],"views":60,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/183070"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=183070"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/183070\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/183072"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=183070"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=183070"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=183070"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}