{"id":18268,"date":"2013-11-27T10:53:06","date_gmt":"2013-11-27T07:53:06","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=18268"},"modified":"2013-11-27T10:53:06","modified_gmt":"2013-11-27T07:53:06","slug":"borusandan-200-mwlik-res-yatirimi-daha","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/borusandan-200-mwlik-res-yatirimi-daha\/","title":{"rendered":"(Turkish) Borusan&#8217;dan, 200 MW\u2019l\u0131k RES Yat\u0131r\u0131m\u0131 Daha&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/18268\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Borusan CEO Agah U\u011fur y<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/05\/dunyanin-en-buyuk-ruzgar-turbini-test-merkezi-siemens-ruzgar-enerjisi.jpg\"><img loading=\"lazy\" class=\"size-medium wp-image-10491 alignright\" title=\"ruzgar-enerjisi\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/05\/dunyanin-en-buyuk-ruzgar-turbini-test-merkezi-siemens-ruzgar-enerjisi-300x186.jpg\" alt=\"\" width=\"300\" height=\"186\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/05\/dunyanin-en-buyuk-ruzgar-turbini-test-merkezi-siemens-ruzgar-enerjisi-300x186.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/05\/dunyanin-en-buyuk-ruzgar-turbini-test-merkezi-siemens-ruzgar-enerjisi-500x310.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/05\/dunyanin-en-buyuk-ruzgar-turbini-test-merkezi-siemens-ruzgar-enerjisi-80x50.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/05\/dunyanin-en-buyuk-ruzgar-turbini-test-merkezi-siemens-ruzgar-enerjisi.jpg 624w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>apt\u0131\u011f\u0131 a\u00e7\u0131klamada, 250 milyon Euro maliyetinde 5 projeden olu\u015fan 200 MW portf\u00f6ye sahip r\u00fczgar yat\u0131r\u0131m\u0131n\u0131 ba\u015flatacaklar\u0131n\u0131 a\u00e7\u0131klad\u0131.<\/strong><\/p>\n<p>Enerjideki yat\u0131r\u0131mlar\u0131n uzun vadeli yat\u0131r\u0131mlar oldu\u011funu kaydeden U\u011fur, geri d\u00f6n\u00fc\u015f\u00fcm\u00fcn 3-4 y\u0131l sonra ba\u015flad\u0131\u011f\u0131n\u0131 dolay\u0131s\u0131yla ciroyu etkilemedi\u011fini s\u00f6yledi.<\/p>\n<p><strong>50 MW\u2019LIK RES 3-4 AY \u0130\u00c7\u0130NDE \u00dcRET\u0130ME ALINACAK<\/strong><\/p>\n<p>\u015eirketin, 250 MW hidrolik, 450 MW r\u00fczgar olmak \u00fczere 700 MW enerji portf\u00f6y\u00fc bulunuyor. ENBW ile ortakl\u0131\u011f\u0131 bulunan \u015firketin, 110 MW kurulu g\u00fcc\u00fc \u00fcretim yap\u0131yor. \u015eirket, 50 MW kurulu g\u00fc\u00e7teki RES projesini 3-4 ay i\u00e7inde \u00fcretime almay\u0131 hedefliyor.<\/p>\n<p>Kaynak: <a href=\"http:\/\/enerjigunlugu.net\/borusan-200-mwlik-res-yatirimi-daha-yapacak_5798.html\" target=\"_blank\">Enerji G\u00fcnl\u00fc\u011f\u00fc<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Borusan CEO Agah U\u011fur yapt\u0131\u011f\u0131 a\u00e7\u0131klamada, 250 milyon Euro maliyetinde 5 projeden olu\u015fan 200 MW portf\u00f6ye sahip r\u00fczgar yat\u0131r\u0131m\u0131n\u0131 ba\u015flatacaklar\u0131n\u0131 a\u00e7\u0131klad\u0131. Enerjideki yat\u0131r\u0131mlar\u0131n [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":10491,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,50],"tags":[10594,829,1556,63,67,1009,165,474,10595,69,16,5484],"views":677,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/18268"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=18268"}],"version-history":[{"count":2,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/18268\/revisions"}],"predecessor-version":[{"id":18270,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/18268\/revisions\/18270"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/10491"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=18268"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=18268"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=18268"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}