{"id":182245,"date":"2023-12-14T19:52:09","date_gmt":"2023-12-14T16:52:09","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=182245"},"modified":"2023-12-14T19:52:23","modified_gmt":"2023-12-14T16:52:23","slug":"karakaya-ya-yerli-ve-milli-turbin","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/karakaya-ya-yerli-ve-milli-turbin\/","title":{"rendered":"(Turkish) Karakaya\u2019ya Yerli ve Milli T\u00fcrbin"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/182245\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2>T\u00fcrkiye\u2019nin en b\u00fcy\u00fck ikinci hidroelektrik santrali olan Karakaya Baraj\u0131\u2019n\u0131n 36 y\u0131ld\u0131r g\u00fc\u00e7 \u00fcreten t\u00fcrbinleri yenileniyor.<\/h2>\n<p style=\"text-align: center;\"><img loading=\"lazy\" class=\"aligncenter wp-image-182248\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/12\/karakaya-ya-yerli-ve-milli-turbin-1.jpg\" alt=\"\" width=\"500\" height=\"329\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/12\/karakaya-ya-yerli-ve-milli-turbin-1.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/12\/karakaya-ya-yerli-ve-milli-turbin-1-300x197.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/12\/karakaya-ya-yerli-ve-milli-turbin-1-500x329.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/12\/karakaya-ya-yerli-ve-milli-turbin-1-76x50.jpg 76w\" sizes=\"(max-width: 500px) 100vw, 500px\" \/><\/p>\n<p>Yerli ve milli imkanlarla geli\u015ftirilen t\u00fcrbinler, Enerji ve Tabii Kaynaklar Bakanl\u0131\u011f\u0131\u2019n\u0131n ilgili iki kurulu\u015fu olan <strong>Elektrik \u00dcretim A.\u015e. (E\u00dcA\u015e)<\/strong> ile <strong>T\u00fcrkiye Elektromekanik A.\u015e.\u2019nin (TEMSAN)<\/strong> i\u015f birli\u011finde santralin <strong>6 \u00fcnitesine<\/strong> yerle\u015ftirilecek. 2026 y\u0131l\u0131nda tamamlanacak <strong>rehabilitasyon projesi<\/strong> ile Karakaya HES, y\u0131ll\u0131k 178 GWh ek \u00fcretim ger\u00e7ekle\u015ftirilecek. Bu ilave \u00fcretim, her y\u0131l 445 milyon liral\u0131k art\u0131 de\u011fer \u00fcretecek. Karakaya, 61 bin ailenin daha y\u0131ll\u0131k elektri\u011fini kar\u015f\u0131layacak.<\/p>\n<h3><strong>7,5 Milyar Dolarl\u0131k Yat\u0131r\u0131m<\/strong><\/h3>\n<p>Enerji ve Tabii Kaynaklar Bakanl\u0131\u011f\u0131, 2017-2022 y\u0131llar\u0131 aras\u0131nda enerji verimlili\u011fi alan\u0131na 7,5 milyar dolarl\u0131k yat\u0131r\u0131m yap\u0131lmas\u0131n\u0131 sa\u011flad\u0131. Bu yat\u0131r\u0131mlarla 18,7 milyon TEP k\u00fcm\u00fclatif enerji tasarruf elde edilirken 59 milyon ton sera gaz\u0131 emisyonu da engellendi. Bu alanda \u00f6zel sekt\u00f6r\u00fcn y\u00fck\u00fcn\u00fc hafifletmek i\u00e7in verimlilik artt\u0131r\u0131c\u0131 projeleri destekleyen bakanl\u0131k, b\u00fcnyesindeki santrallerde de <strong>verimlilik artt\u0131r\u0131c\u0131 projeler<\/strong> uyguluyor.<\/p>\n<h3><strong>85 Tonluk T\u00fcrbin \u00c7ark\u0131<\/strong><\/h3>\n<p>Bu projelerden biri de 1987 y\u0131l\u0131nda faaliyete ge\u00e7en ve T\u00fcrkiye\u2019nin en b\u00fcy\u00fck ikinci hidroelektrik santrali olan Karakaya HES\u2019te uygulanmaya ba\u015fland\u0131. Santralin birinci \u00fcnitesinde 36 y\u0131ll\u0131k t\u00fcrbinin demontaj\u0131 tamamland\u0131 ve 85 ton a\u011f\u0131rl\u0131\u011f\u0131ndaki t\u00fcrbin \u00e7ark\u0131 ve di\u011fer ekipmanlar\u0131n montaj\u0131na ge\u00e7ildi. Restorasyon proje ile 300 MW\u2019l\u0131k 6 \u00fcniteden meydana gelen toplam 1800 MW g\u00fc\u00e7 \u00fcreten santralin verimlili\u011fi y\u00fczde 91\u2019den y\u00fczde 94,5 \u00e7\u0131kart\u0131lacak.<\/p>\n<h3><strong>S\u0131rada Di\u011fer Santraller Var<\/strong><\/h3>\n<p>2026 y\u0131l\u0131nda santralin 6 \u00fcnitesinde de t\u00fcm rehabilitasyonu tamamlanacak. B\u00f6ylelikle Karakaya her y\u0131l 178 GWh ek \u00fcretim ger\u00e7ekle\u015ftirecek. Bu ilave \u00fcretim, her y\u0131l 445 milyon liral\u0131k art\u0131 de\u011fer \u00fcretecek. Karakaya, 61 bin ailenin daha y\u0131ll\u0131k elektri\u011fini kar\u015f\u0131layacak. Yani sadece Karakaya HES\u2019teki t\u00fcrbin yenileme \u00e7al\u0131\u015fmas\u0131, yakla\u015f\u0131k 250 bin n\u00fcfuslu bir il\u00e7enin y\u0131ll\u0131k elektri\u011fini kar\u015f\u0131layacak. Enerji ve Tabii Kaynaklar Bakanl\u0131\u011f\u0131, Karakaya HES\u2019te ba\u015flatt\u0131\u011f\u0131 yerli ve milli restorasyon \u00e7al\u0131\u015fmalar\u0131na di\u011fer santrallerde de ba\u015flayacak.<\/p>\n<p>Kaynak: <a href=\"https:\/\/enerji.gov.tr\/haber-detay?id=21204\" target=\"_blank\" rel=\"noopener\">ETKB<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. T\u00fcrkiye\u2019nin en b\u00fcy\u00fck ikinci hidroelektrik santrali olan Karakaya Baraj\u0131\u2019n\u0131n 36 y\u0131ld\u0131r g\u00fc\u00e7 \u00fcreten t\u00fcrbinleri yenileniyor. Yerli ve milli imkanlarla geli\u015ftirilen t\u00fcrbinler, Enerji [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":182247,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,47],"tags":[111650,1090,111649,6408,111651,111652,3802],"views":55,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/182245"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=182245"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/182245\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/182247"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=182245"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=182245"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=182245"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}