{"id":182160,"date":"2023-12-12T17:02:50","date_gmt":"2023-12-12T14:02:50","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=182160"},"modified":"2023-12-12T17:03:07","modified_gmt":"2023-12-12T14:03:07","slug":"akkuyu-ngs-ni%cc%87n-i%cc%87lk-unitesi-icin-isletmeye-alma-izni-verildi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/akkuyu-ngs-ni%cc%87n-i%cc%87lk-unitesi-icin-isletmeye-alma-izni-verildi\/","title":{"rendered":"(Turkish) &#8217;Akkuyu NGS&#8217;n\u0131\u0307n I\u0307lk \u00dcnitesi \u0130\u00e7in \u0130\u015fletmeye Alma \u0130zni Verildi"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/182160\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2>N\u00fckleer D\u00fczenleme Kurumu (NDK), Akkuyu N\u00fckleer G\u00fc\u00e7 Santrali (NGS) in\u015faat projesini y\u00fcr\u00fcten AKKUYU N\u00dcKLEER A.\u015e\u2019ye ilk g\u00fc\u00e7 \u00fcnitesini devreye almak i\u00e7in gerekli olan \u201c\u0130\u015fletmeye Alma \u0130znini\u201d verdi.<\/h2>\n<p>S\u00fcre\u00e7, AKKUYU N\u00dcKLEER A.\u015e\u2019nin birinci g\u00fc\u00e7 \u00fcnitesinin devreye alma a\u015famas\u0131na ba\u015flamaya haz\u0131r oldu\u011funu teyit eden kapsaml\u0131 belgeleri NDK\u2019ya sunmas\u0131yla ba\u015flad\u0131. \u0130zin i\u00e7in gereken ba\u015fvuru <img loading=\"lazy\" class=\"alignright wp-image-182163\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/12\/akkuyu-ngs-ni\u0307n-i\u0307lk-unitesi-icin-isletmeye-alma-izni-verildi-1.jpg\" alt=\"\" width=\"320\" height=\"214\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/12\/akkuyu-ngs-ni\u0307n-i\u0307lk-unitesi-icin-isletmeye-alma-izni-verildi-1.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/12\/akkuyu-ngs-ni\u0307n-i\u0307lk-unitesi-icin-isletmeye-alma-izni-verildi-1-300x200.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/12\/akkuyu-ngs-ni\u0307n-i\u0307lk-unitesi-icin-isletmeye-alma-izni-verildi-1-500x334.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/12\/akkuyu-ngs-ni\u0307n-i\u0307lk-unitesi-icin-isletmeye-alma-izni-verildi-1-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/12\/akkuyu-ngs-ni\u0307n-i\u0307lk-unitesi-icin-isletmeye-alma-izni-verildi-1-450x300.jpg 450w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>belgelerinin <strong>ilki 17 Mart 2023<\/strong> tarihinde,<strong> ikincisi<\/strong> ise <strong>24 A\u011fustos 2023<\/strong> tarihinde NDK\u2019ya sunuldu.<\/p>\n<p>NDK Kurulu, ba\u015fvuru belgelerinin ayr\u0131nt\u0131l\u0131 \u015fekilde incelenmesinin ard\u0131ndan Akkuyu NGS\u2019nin 1\u2019inci \u00fcnitesinin i\u015fletime al\u0131nmas\u0131 i\u00e7in gerekli iznin verilmesini onaylad\u0131. Verilen bu izin, NGS in\u015faat\u0131n\u0131n son a\u015famas\u0131 olan ve santralin g\u00fcvenli bir \u015fekilde i\u015fletilmesine temel te\u015fkil eden ba\u015flatma, ayarlama ve \u00e7al\u0131\u015ft\u0131rma s\u00fcre\u00e7lerine ge\u00e7ilmesini m\u00fcmk\u00fcn k\u0131l\u0131yor.<\/p>\n<p>Bir sonraki a\u015fama ise birinci g\u00fc\u00e7 \u00fcnitesinin i\u015fletilmesi i\u00e7in gerekli lisans\u0131n al\u0131nmas\u0131na y\u00f6nelik \u00e7al\u0131\u015fmalar\u0131n yap\u0131lmas\u0131 olacak. Bu lisans, <strong>n\u00fckleer yak\u0131t\u0131n reakt\u00f6re y\u00fcklenmesini<\/strong> ve <strong>devreye alma \u00f6ncesi kontrol i\u015flemlerine ba\u015flanmas\u0131n\u0131<\/strong> sa\u011flayacak. AKKUYU N\u00dcKLEER A.\u015e. uzmanlar\u0131 <strong>lisans ba\u015fvurusu<\/strong> i\u00e7in <strong>teknik belgeleri haz\u0131rlamay\u0131<\/strong> s\u00fcrd\u00fcr\u00fcyor.<\/p>\n<p><strong>AKKUYU N\u00dcKLEER A.\u015e Genel M\u00fcd\u00fcr\u00fc Anastasia Zoteeva<\/strong>, T\u00fcrkiye\u2019nin ilk n\u00fckleer g\u00fc\u00e7 santralinin devreye al\u0131nmas\u0131na ili\u015fkin \u00f6nemli bir a\u015fama olan i\u015fletmeye alma izninin verilmesi konusunda \u015funlar\u0131 s\u00f6yledi: <em>\u201cLisanslama bir n\u00fckleer g\u00fc\u00e7 santrali i\u00e7in son derece \u00f6nemli bir s\u00fcre\u00e7tir. T\u00fcrkiye\u2019nin ilk n\u00fckleer g\u00fc\u00e7 santrali Akkuyu NGS i\u00e7in al\u0131nan her lisans T\u00fcrkiye\u2019de ilktir. N\u00fckleer D\u00fczenleme Kurumu\u2019nun Akkuyu NGS\u2019nin ilk \u00fcnitesinin i\u015fletime al\u0131nmas\u0131 i\u00e7in izin verme karar\u0131, T\u00fcrk mevzuat\u0131n\u0131n ve NGS in\u015fas\u0131na y\u00f6nelik uluslararas\u0131 standartlar\u0131n t\u00fcm gerekliliklerini yerine getirdi\u011fimizi ve ilerlemeye haz\u0131r oldu\u011fumuzu teyit etmektedir. Ba\u015fvuru belgelerini haz\u0131rlayan uzmanlar\u0131m\u0131za, ba\u015fvurunun incelenmesine kat\u0131lan NDK uzmanlar\u0131na ve tabii ki ilk \u00fcnitenin zaman\u0131nda i\u015fletime al\u0131nmaya haz\u0131r olmas\u0131n\u0131 sa\u011flayan<strong> in\u015faat\u00e7\u0131lara<\/strong> ve <strong>montajc\u0131lara te\u015fekk\u00fcr etmek<\/strong> istiyorum. Akkuyu NGS\u2019nin ilk \u00fcnitesinin devreye al\u0131nmas\u0131na izin verilmesiyle projenin geli\u015fiminde yeni, \u00f6nemli ve daha da sorumluluk gerektiren bir a\u015famaya giriyoruz.\u201d<\/em><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. N\u00fckleer D\u00fczenleme Kurumu (NDK), Akkuyu N\u00fckleer G\u00fc\u00e7 Santrali (NGS) in\u015faat projesini y\u00fcr\u00fcten AKKUYU N\u00dcKLEER A.\u015e\u2019ye ilk g\u00fc\u00e7 \u00fcnitesini devreye almak i\u00e7in gerekli [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":182162,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,43],"tags":[3019,48024,111612,77987,111614,111613,64574,19356],"views":36,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/182160"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=182160"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/182160\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/182162"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=182160"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=182160"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=182160"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}