{"id":182058,"date":"2023-12-09T14:14:04","date_gmt":"2023-12-09T11:14:04","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=182058"},"modified":"2023-12-09T14:14:04","modified_gmt":"2023-12-09T11:14:04","slug":"kasim-2023-te-toplam-kurulu-gucun-yuzde-10-6-si-gunes-santrallerinden","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/kasim-2023-te-toplam-kurulu-gucun-yuzde-10-6-si-gunes-santrallerinden\/","title":{"rendered":"(Turkish) Kas\u0131m 2023&#8217;te Toplam Kurulu G\u00fcc\u00fcn %10,6\u2019s\u0131 G\u00fcne\u015f Santrallerinden"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/182058\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2><strong>2023 Kas\u0131m ay\u0131nda toplam kurulu g\u00fcc\u00fcn %10,6\u2019l\u0131k k\u0131sm\u0131 (11.268 MW) g\u00fcne\u015f enerjisi santralleri taraf\u0131ndan olu\u015fturuldu. 2023 y\u0131l\u0131 Ekim ay\u0131 sonunda 105.927 MW olan toplam kurulu g\u00fc\u00e7 de\u011feri 143,89 MW\u2019l\u0131k art\u0131\u015fla 2023 y\u0131l\u0131 Kas\u0131m ay\u0131 sonunda 106.071 MW olarak kaydedildi.<\/strong><\/h2>\n<p>APLUS Enerji\u2019den yap\u0131lan analize g\u00f6re; 2023 y\u0131l\u0131 Kas\u0131m ay\u0131 sonunda olu\u015fan toplam kurulu g\u00fcc\u00fcn %23,9\u2019luk k\u0131sm\u0131 (25.354 MW) do\u011fal gaz ve LNG yak\u0131t tipi santralleri ile kar\u015f\u0131lan\u0131rken, %22,0\u2019l\u0131k k\u0131sm\u0131 (23.285 MW) barajl\u0131 hidrolik santraller taraf\u0131ndan kar\u015f\u0131lanmaktad\u0131r. Bu yak\u0131t tiplerini %10,8\u2019lik (11.440 MW) oran ile yerli k\u00f6m\u00fcr santralleri ve %9,8\u2019lik oran (10.374 MW) ile ithal k\u00f6m\u00fcr santralleri izlemektedir. Akarsu tipi hidrolik santraller %7,8\u2019lik bir orana (8.311 MW) sahipken, r\u00fczg\u00e2r santralleri toplam kurulu g\u00fcc\u00fcn %11,0\u2019l\u0131k bir k\u0131sm\u0131n\u0131 (11.643 MW) olu\u015fturmaktad\u0131r. Toplam kurulu g\u00fcc\u00fcn %10,6\u2019l\u0131k k\u0131sm\u0131 (11.268 MW) g\u00fcne\u015f enerjisi santralleri, %1,6\u2019l\u0131k k\u0131sm\u0131 (1.691 MW) jeotermal enerji santrallerinden olu\u015furken, %2,5\u2019lik k\u0131sm\u0131 (2.704 MW) ise di\u011fer termik santraller taraf\u0131ndan olu\u015fturulmaktad\u0131r.<\/p>\n<p style=\"text-align: center;\"><img loading=\"lazy\" class=\"aligncenter wp-image-182060\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/12\/kasim-2023-te-toplam-kurulu-gucun-yuzde-10-6-si-gunes-santrallerinden.jpg\" alt=\"\" width=\"500\" height=\"284\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/12\/kasim-2023-te-toplam-kurulu-gucun-yuzde-10-6-si-gunes-santrallerinden.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/12\/kasim-2023-te-toplam-kurulu-gucun-yuzde-10-6-si-gunes-santrallerinden-300x170.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/12\/kasim-2023-te-toplam-kurulu-gucun-yuzde-10-6-si-gunes-santrallerinden-500x284.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/12\/kasim-2023-te-toplam-kurulu-gucun-yuzde-10-6-si-gunes-santrallerinden-80x45.jpg 80w\" sizes=\"(max-width: 500px) 100vw, 500px\" \/><\/p>\n<p>2023 Kas\u0131m ay\u0131nda ger\u00e7ekle\u015fen elektrik \u00fcretimi kaynak bak\u0131m\u0131ndan incelendi\u011finde ise, 2023 Kas\u0131m ay\u0131nda toplam \u00fcretimin <strong>%18,1<\/strong>\u2019inin do\u011fal gaz ve LNG santralleri taraf\u0131ndan ger\u00e7ekle\u015ftirildi\u011fi g\u00f6r\u00fclmektedir. Barajl\u0131 hidroelektrik santraller, ilgili ayda toplam \u00fcretimin <strong>%12,5<\/strong>\u2019ini kar\u015f\u0131larken, akarsu tipi hidroelektrik santraller ise <strong>%3,8<\/strong> oran\u0131yla \u00fcretime katk\u0131da bulunmu\u015ftur. \u0130thal k\u00f6m\u00fcr santralleri Kas\u0131m ay\u0131nda toplam \u00fcretimin <strong>%25,9<\/strong>\u2019unu kar\u015f\u0131larken, yerli k\u00f6m\u00fcr santralleri ise <strong>%15,3<\/strong> oran\u0131nda katk\u0131 sa\u011flam\u0131\u015ft\u0131r. Yenilenebilir enerji santrallerinden r\u00fczg\u00e2r enerjisi santralleri toplam \u00fcretime <strong>%12,9<\/strong> jeotermal ve g\u00fcne\u015f enerjisi santralleri ise toplam<strong> %8,4<\/strong> oran\u0131nda katk\u0131da bulunmu\u015ftur. Di\u011fer termik santrallerin \u00fcretimdeki pay\u0131 ise <strong>%3,2<\/strong> olarak ger\u00e7ekle\u015fmi\u015ftir.<\/p>\n<p>2022 y\u0131l\u0131 Kas\u0131m ay\u0131 i\u00e7erisinde toplam <strong>25,118 GWh<\/strong> olan elektrik talebi, 2023 y\u0131l\u0131 Kas\u0131m ay\u0131nda bir \u00f6nceki y\u0131la g\u00f6re <strong>%3,11<\/strong> oran\u0131nda art\u0131\u015f g\u00f6stererek, <strong>25,899 GWh<\/strong> de\u011ferine ula\u015fm\u0131\u015ft\u0131r. 2022 y\u0131l\u0131 Kas\u0131m ay\u0131nda <strong>34,598 MWh<\/strong> olarak \u00f6l\u00e7\u00fclen saatlik ortalama talep, <strong>2023 y\u0131l\u0131 Kas\u0131m<\/strong> ay\u0131nda<strong> 35.972 MWh<\/strong> olarak ger\u00e7ekle\u015fmi\u015ftir.<\/p>\n<p>Kaynak:\u00a0<a href=\"https:\/\/www.tenva.org\/aplus-enerji-kasim-2023-analizi-yayinlandi\/\" target=\"_blank\" rel=\"noopener\">APLUS Enerji \/ TENVA<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. 2023 Kas\u0131m ay\u0131nda toplam kurulu g\u00fcc\u00fcn %10,6\u2019l\u0131k k\u0131sm\u0131 (11.268 MW) g\u00fcne\u015f enerjisi santralleri taraf\u0131ndan olu\u015fturuldu. 2023 y\u0131l\u0131 Ekim ay\u0131 sonunda 105.927 MW [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":182063,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[35668,19,18,2326,1325,110018],"views":81,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/182058"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=182058"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/182058\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/182063"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=182058"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=182058"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=182058"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}