{"id":181987,"date":"2023-12-07T16:51:25","date_gmt":"2023-12-07T13:51:25","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=181987"},"modified":"2023-12-07T16:51:57","modified_gmt":"2023-12-07T13:51:57","slug":"akkuyu-ngs-nin-1-inci-unitesinde-reaktor-kurulumu-testi-tamamlandi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/akkuyu-ngs-nin-1-inci-unitesinde-reaktor-kurulumu-testi-tamamlandi\/","title":{"rendered":"(Turkish) &#8217;Akkuyu NGS&#8217;nin 1\u2019inci \u00dcnitesi\u2019nde Reakt\u00f6r Kurulumu Testi Tamamland\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/181987\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2>Akkuyu N\u00fckleer G\u00fc\u00e7 Santrali\u2019nin (NGS) 1\u2019inci \u00fcnitesinin reakt\u00f6r i\u00e7 par\u00e7alar\u0131n\u0131n t\u00fcm\u00fc, AKKUYU N\u00dcKLEER A.\u015e uzmanlar\u0131 taraf\u0131ndan ekipman\u0131n g\u00fcvenli ve emniyetli i\u015fletilmesine ili\u015fkin gerekliliklere uygunlu\u011funun kontrol\u00fc i\u00e7in tasar\u0131m konumuna yerle\u015ftirildi.<\/h2>\n<p style=\"text-align: center;\"><img loading=\"lazy\" class=\"aligncenter wp-image-181990\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/12\/akkuyu-ngs-nin-1-inci-unitesinde-reaktor-kurulumu-testi-tamamlandi-1.jpg\" alt=\"\" width=\"500\" height=\"281\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/12\/akkuyu-ngs-nin-1-inci-unitesinde-reaktor-kurulumu-testi-tamamlandi-1.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/12\/akkuyu-ngs-nin-1-inci-unitesinde-reaktor-kurulumu-testi-tamamlandi-1-300x169.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/12\/akkuyu-ngs-nin-1-inci-unitesinde-reaktor-kurulumu-testi-tamamlandi-1-500x281.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/12\/akkuyu-ngs-nin-1-inci-unitesinde-reaktor-kurulumu-testi-tamamlandi-1-80x45.jpg 80w\" sizes=\"(max-width: 500px) 100vw, 500px\" \/><\/p>\n<p>Ba\u015fta reakt\u00f6r \u00e7ekirde\u011fini i\u00e7eren reakt\u00f6r \u00e7ekirdek \u015faft\u0131 olmak \u00fczere pek \u00e7ok b\u00fcy\u00fck boyutlu ekipman 1\u2019inci \u00fcniteye ait kutup vinci kullan\u0131larak reakt\u00f6r binas\u0131na yerle\u015ftirildi. Bu ekipmanlar aras\u0131nda <strong>yak\u0131t demetlerini ay\u0131rmak<\/strong> ve <strong>n\u00f6tron \u0131\u015f\u0131nlar\u0131n\u0131n reakt\u00f6r kab\u0131 \u00fczerindeki etkisini s\u0131n\u0131rland\u0131rmak<\/strong> i\u00e7in tasarlanm\u0131\u015f <strong>bir b\u00f6lme<\/strong> ve <strong>yak\u0131t demetlerini<\/strong> tasarlanan konumlar\u0131nda sabitleyen koruyucu t\u00fcplerden olu\u015fan <strong>bir blok da<\/strong> bulunuyor.<\/p>\n<p>Montaj\u0131n son a\u015famas\u0131nda ise, kapakl\u0131 \u00fcst blok reakt\u00f6r\u00fcn ana konekt\u00f6r\u00fcn\u00fcn s\u0131zd\u0131rmazl\u0131\u011f\u0131n\u0131n yan\u0131 s\u0131ra kontrol ve koruma sistemleri ile reakt\u00f6r i\u00e7i izleme sens\u00f6rlerinin daha sonra yap\u0131lacak kurulumu i\u00e7in monte edildi. Kurulu halde <strong>600 tondan<\/strong> fazla a\u011f\u0131rl\u0131\u011fa, <strong>19,3<\/strong> <strong>metre<\/strong> uzunlu\u011fa ve <strong>4,8 metre<\/strong> \u00e7apa sahip reakt\u00f6r\u00fcn ana par\u00e7alar\u0131n\u0131n uyumlulu\u011funu kontrol eden uzmanlar, ekipman\u0131n ger\u00e7ek boyutlar\u0131n\u0131n tasar\u0131m gerekliliklerini kar\u015f\u0131lad\u0131\u011f\u0131n\u0131 do\u011frulad\u0131.<\/p>\n<p>Konuyla ilgili olarak a\u00e7\u0131klama yapan <strong>AKKUYU N\u00dcKLEER A.\u015e. Genel M\u00fcd\u00fcr Birinci Yard\u0131mc\u0131s\u0131 ve NGS Yap\u0131 \u0130\u015fleri Direkt\u00f6r\u00fc Sergey Butckikh<\/strong> \u015funlar\u0131 kaydetti:\u00a0\u201c<em>Rosatom\u00a0\u00e7al\u0131\u015fanlar\u0131n\u0131n uzun y\u0131llara dayanan mesleki deneyimi, teknik a\u00e7\u0131dan karma\u015f\u0131k operasyonlar\u0131n m\u00fcmk\u00fcn olan en k\u0131sa s\u00fcrede ger\u00e7ekle\u015ftirilmesini sa\u011flamaktad\u0131r. Bu durum, d\u00fcnya \u00e7ap\u0131nda b\u00fcy\u00fck \u00f6l\u00e7ekli projelerin hayata ge\u00e7irilmesiyle de teyit edilmektedir. Reakt\u00f6r\u00fcn kontrol i\u00e7in monte edilmesi i\u015flemi, bir g\u00fc\u00e7 \u00fcnitesinin in\u015fas\u0131ndaki en \u00f6nemli a\u015famalardan biridir. Bu i\u015flem, kurulumu tamamlanan reakt\u00f6r\u00fcn t\u00fcm teknik gereklilikleri kar\u015f\u0131lad\u0131\u011f\u0131n\u0131 do\u011frulamak i\u00e7in gereklidir. Her a\u015fama, Akkuyu NGS<\/em><em>\u2019nin 1<\/em><em>\u2019inci \u00fcnitesinin \u00e7ok a\u015famal\u0131 devreye alma s\u00fcrecinin \u00f6nemli bir par\u00e7as\u0131d\u0131r.<\/em> <em>Reakt\u00f6r, n\u00fckleer yak\u0131t y\u00fcklenmeden \u00f6nce iki kez test edilir. \u0130lk kurulum testini tamamlam\u0131\u015f bulunuyoruz. Bu i\u015flemi, \u00e7ekirde\u011fin konfig\u00fcrasyonunu sim\u00fcle etmek i\u00e7in yak\u0131t montaj sim\u00fclat\u00f6rlerinin y\u00fcklenmesi takip edecek. \u0130kinci kurulum testi, reakt\u00f6r tesisinin so\u011fuk-s\u0131cak su sirk\u00fclasyonundan hemen \u00f6nce yap\u0131lacak.<\/em><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Akkuyu N\u00fckleer G\u00fc\u00e7 Santrali\u2019nin (NGS) 1\u2019inci \u00fcnitesinin reakt\u00f6r i\u00e7 par\u00e7alar\u0131n\u0131n t\u00fcm\u00fc, AKKUYU N\u00dcKLEER A.\u015e uzmanlar\u0131 taraf\u0131ndan ekipman\u0131n g\u00fcvenli ve emniyetli i\u015fletilmesine ili\u015fkin [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":181989,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,43],"tags":[108195,3019,111556,1303,19356,111555],"views":49,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/181987"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=181987"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/181987\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/181989"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=181987"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=181987"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=181987"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}