{"id":181685,"date":"2023-11-30T15:31:42","date_gmt":"2023-11-30T12:31:42","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=181685"},"modified":"2023-11-30T15:44:05","modified_gmt":"2023-11-30T12:44:05","slug":"borsa-istanbul-gunes-enerjisine-yatirim-yapiyor","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/borsa-istanbul-gunes-enerjisine-yatirim-yapiyor\/","title":{"rendered":"(Turkish) &#8217;Borsa \u0130stanbul&#8217; G\u00fcne\u015f Enerjisine Yat\u0131r\u0131m Yap\u0131yor"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/181685\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2 class=\"detail-header-spot\">Borsa \u0130stanbul da g\u00fcne\u015fe yat\u0131r\u0131m yapanlar aras\u0131na <img loading=\"lazy\" class=\"alignright wp-image-181687\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/11\/borsa-istanbul-da-gunes-enerjisine-yatirim-yapiyor.jpg\" alt=\"\" width=\"320\" height=\"209\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/11\/borsa-istanbul-da-gunes-enerjisine-yatirim-yapiyor.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/11\/borsa-istanbul-da-gunes-enerjisine-yatirim-yapiyor-300x196.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/11\/borsa-istanbul-da-gunes-enerjisine-yatirim-yapiyor-500x326.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/11\/borsa-istanbul-da-gunes-enerjisine-yatirim-yapiyor-77x50.jpg 77w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>kat\u0131l\u0131yor. \u015eirketin Batman Gerc\u00fc\u015f\u2019te 20 hektarl\u0131k hazine arazisi \u00fczerinde kuraca\u011f\u0131 <strong>16.5 MWm&#8217;lik<\/strong> santral i\u00e7in \u00c7ED s\u00fcreci ba\u015flad\u0131. 30 bin g\u00fcne\u015f panelinin yer alaca\u011f\u0131 proje, yakla\u015f\u0131k 326 milyon liraya mal olacak.<\/h2>\n<p><strong>Borsa\u00a0\u0130stanbul<\/strong>, g\u00fcne\u015ften gelen enerjiden yararlanmaya haz\u0131rlan\u0131yor. \u015eirket, Batman Gerc\u00fc\u015f\u2019te <strong>20 hektarl\u0131k<\/strong> hazine arazisi \u00fczerine kurulacak <strong>16.5 MWm\u2019lik\u00a0<\/strong>g\u00fcne\u015f enerjisi santrali i\u00e7in <strong>\u00c7evresel Etki De\u011ferlendirme (\u00c7ED)<\/strong> s\u00fcrecini ba\u015flatt\u0131.<\/p>\n<p><strong>30.000<\/strong> g\u00fcne\u015f panelinin yer ald\u0131\u011f\u0131 projenin <strong>yakla\u015f\u0131k 326 milyon T\u00fcrk liras\u0131na<\/strong> mal olaca\u011f\u0131 tahmin ediliyor.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Borsa \u0130stanbul da g\u00fcne\u015fe yat\u0131r\u0131m yapanlar aras\u0131na kat\u0131l\u0131yor. \u015eirketin Batman Gerc\u00fc\u015f\u2019te 20 hektarl\u0131k hazine arazisi \u00fczerinde kuraca\u011f\u0131 16.5 MWm&#8217;lik santral i\u00e7in \u00c7ED [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":181687,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49],"tags":[4228,111460,2326,2569,2206],"views":57,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/181685"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=181685"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/181685\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/181687"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=181685"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=181685"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=181685"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}