{"id":181430,"date":"2023-11-24T15:46:40","date_gmt":"2023-11-24T12:46:40","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=181430"},"modified":"2023-11-24T15:51:27","modified_gmt":"2023-11-24T12:51:27","slug":"dunya-nin-en-buyuk-enerji-depolama-tesisi-en-kurak-cole-kuruluyor","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/dunya-nin-en-buyuk-enerji-depolama-tesisi-en-kurak-cole-kuruluyor\/","title":{"rendered":"(Turkish) D\u00fcnyan\u0131n En B\u00fcy\u00fck Enerji Depolama Tesisi En Kurak \u00c7\u00f6le Kuruluyor"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/181430\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2>Atacama \u00e7\u00f6l\u00fc, d\u00fcnyan\u0131n en b\u00fcy\u00fck enerji depolama projesine ev sahipli\u011fi yapacak. 1 GW g\u00fcne\u015f enerjisi kapasitesini de i\u00e7ererek \u00fcretim ger\u00e7ekle\u015ftirecek.<\/h2>\n<p style=\"text-align: center;\"><img loading=\"lazy\" class=\"aligncenter wp-image-181432\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/11\/dunya-nin-en-buyuk-enerji-depolama-tesisi-en-kurak-cole-kuruluyor.jpg\" alt=\"\" width=\"500\" height=\"296\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/11\/dunya-nin-en-buyuk-enerji-depolama-tesisi-en-kurak-cole-kuruluyor.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/11\/dunya-nin-en-buyuk-enerji-depolama-tesisi-en-kurak-cole-kuruluyor-300x178.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/11\/dunya-nin-en-buyuk-enerji-depolama-tesisi-en-kurak-cole-kuruluyor-500x296.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/11\/dunya-nin-en-buyuk-enerji-depolama-tesisi-en-kurak-cole-kuruluyor-80x47.jpg 80w\" sizes=\"(max-width: 500px) 100vw, 500px\" \/><\/p>\n<p>Yenilenebilir enerji kaynaklar\u0131n\u0131n k\u0131smi s\u00fcrekli \u00fcretimi cazip olsa da \u00fcretilen enerjinin bir \u015fekilde depolanmas\u0131 da kritik \u00f6neme sahip. Bu ba\u011flamda son y\u0131llarda <strong>yenilenebilir enerji yat\u0131r\u0131mlar\u0131yla<\/strong> paralel olacak \u015fekilde <strong>depolama tesis yat\u0131r\u0131mlar\u0131n\u0131n da<\/strong> artt\u0131\u011f\u0131n\u0131 g\u00f6rd\u00fck. \u015eimdi ise <strong>\u0130spanyol yenilenebilir enerji \u015firketi Grenergy<\/strong>, <strong>\u015eili<\/strong>&#8216;nin <strong>Atacama \u00c7\u00f6l\u00fc<\/strong>&#8216;nde <strong>d\u00fcnyan\u0131n en b\u00fcy\u00fck enerji depolama tesisini<\/strong> in\u015fa etmeye ba\u015flad\u0131.<\/p>\n<h3>D\u00dcNYANIN EN B\u00dcY\u00dcK TES\u0130S\u0130 OLACAK<\/h3>\n<p>Grenergy, in\u015fa etmeye ba\u015flad\u0131\u011f\u0131 <strong>4,1 GWh<\/strong>&#8216;lik <strong>\u2018Oasis de Atacama\u2019 enerji depolama projesini<\/strong> d\u00fcnyan\u0131n en b\u00fcy\u00fc\u011f\u00fc olarak nitelendiriyor. Firma, \u00f6n\u00fcm\u00fczdeki 36 ay i\u00e7inde a\u015famal\u0131 olarak faaliyete ge\u00e7mesi beklenen projeye <strong>1,4 milyar dolar yat\u0131r\u0131m<\/strong> yapaca\u011f\u0131n\u0131 s\u00f6yledi. Grenergy, <strong>1GW<\/strong>&#8216;l\u0131k <strong>bir g\u00fcne\u015f enerjisi \u00e7iftli\u011fi de i\u00e7erecek<\/strong> olan proje i\u00e7in <strong>ne t\u00fcr bir depolama kullan\u0131laca\u011f\u0131n\u0131 belirtmedi.<\/strong><\/p>\n<p>\u015eili&#8217;nin kuzeyindeki Atacama \u00c7\u00f6l\u00fc d\u00fcnyan\u0131n en kurak topra\u011f\u0131 olmas\u0131n\u0131n yan\u0131 s\u0131ra d\u00fcnyan\u0131n en y\u00fcksek g\u00fcne\u015f \u0131\u015f\u0131n\u0131m\u0131na sahip olmas\u0131 nedeniyle b\u00f6yle bir proje i\u00e7in belki de en ideal konum. <strong>Grenergy CEO&#8217;su David Ruiz de Andres<\/strong>, <em>\u201cOasis de Atacama, Grenergy ve t\u00fcm yenilenebilir enerji sekt\u00f6r\u00fc i\u00e7in ikonik bir proje olacak\u201d<\/em> ifadelerini kullan\u0131rken \u015eili&#8217;deki ana yak\u0131t da\u011f\u0131t\u0131m \u015firketlerinden biri olan <strong>COPEC&#8217;in<\/strong> bir yan kurulu\u015funa <strong>8TWh&#8217;den fazla temiz enerji tedarik etmek<\/strong> \u00fczere <strong>15 y\u0131ll\u0131k<\/strong> bir <strong>elektrik sat\u0131n al\u0131m s\u00f6zle\u015fmesi<\/strong> imzalad\u0131\u011f\u0131n\u0131 s\u00f6yledi.<\/p>\n<p>Be\u015f uluslararas\u0131 bankan\u0131n deste\u011fine sahip olan proje ayn\u0131 zamanda <strong>g\u00fcne\u015f enerjisi<\/strong> ve<strong> depolama projelerini<\/strong> bir arada satarak <strong>Grenergy\u2019yi<\/strong> bu alanda ilk \u015firketlerden biri haline getiriyor. \u015eirket ayr\u0131ca <strong>2026 y\u0131l\u0131na<\/strong> kadar <strong>2,6 milyar Euro (2,8 milyar $)<\/strong> tutar\u0131nda <strong>k\u00fcresel yat\u0131r\u0131m yapma plan\u0131n\u0131 da<\/strong> a\u00e7\u0131klad\u0131. \u015eirket, <strong>2026<\/strong> y\u0131l\u0131na kadar <strong>5GW<\/strong> kurulu g\u00fcne\u015f enerjisi kapasitesine ve <strong>4.1GWh<\/strong> enerji depolama kapasitesine sahip olmay\u0131 hedefliyor.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Atacama \u00e7\u00f6l\u00fc, d\u00fcnyan\u0131n en b\u00fcy\u00fck enerji depolama projesine ev sahipli\u011fi yapacak. 1 GW g\u00fcne\u015f enerjisi kapasitesini de i\u00e7ererek \u00fcretim ger\u00e7ekle\u015ftirecek. Yenilenebilir enerji [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":181432,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53],"tags":[79722,111384,11668,25743,111383,11260],"views":49,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/181430"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=181430"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/181430\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/181432"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=181430"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=181430"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=181430"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}