{"id":18136,"date":"2013-11-25T10:09:56","date_gmt":"2013-11-25T07:09:56","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=18136"},"modified":"2013-11-25T10:09:56","modified_gmt":"2013-11-25T07:09:56","slug":"kuzey-buz-denizine-1-33-milyar-euroluk-ruzgar-santrali-kuruluyor","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/kuzey-buz-denizine-1-33-milyar-euroluk-ruzgar-santrali-kuruluyor\/","title":{"rendered":"(Turkish) Kuzey Buz Denizine 1.33 milyar Euroluk R\u00fczgar Santrali Kuruluyor!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/18136\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Danimarka devlet enerji \u015f<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/11\/siemens-dong-energyden-97-adet-ruzgar-turbini-siparisi-aldi.jpg\"><img loading=\"lazy\" class=\"size-medium wp-image-18137 alignright\" title=\"siemens-dong-energyden-97-adet-ruzgar-turbini-siparisi-aldi\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/11\/siemens-dong-energyden-97-adet-ruzgar-turbini-siparisi-aldi-300x199.jpg\" alt=\"\" width=\"300\" height=\"199\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/11\/siemens-dong-energyden-97-adet-ruzgar-turbini-siparisi-aldi-300x199.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/11\/siemens-dong-energyden-97-adet-ruzgar-turbini-siparisi-aldi-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/11\/siemens-dong-energyden-97-adet-ruzgar-turbini-siparisi-aldi.jpg 479w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>irketi\u00a0Dong Energy, Siemens\u2019ten 97 adet r\u00fczgar t\u00fcrbini sipari\u015fi verdi. Dong Energy ve Siemens projenin maliyeti hakk\u0131nda bilgi vermedi. Yak\u0131n kaynaklar, Kuzey Buz Denizinde kurulacak Gode Wind 1 ve 2 projeleri i\u00e7in toplam maliyetin 1.33 milyar euro olaca\u011f\u0131n\u0131 s\u00f6yl\u00fcyor.<\/strong><\/p>\n<p>Projede Siemens\u2019in yeni 6 megavatl\u0131k t\u00fcrbinleri kullan\u0131lacak. Devasa t\u00fcrbinlerin kanat \u00e7ap\u0131 154 metre. Anla\u015fma kapsam\u0131nda Siemens 5 sene tam servis garantisi sunacak. \u0130ki santralin toplam kurulu g\u00fcc\u00fc 582 MW olacak. Dong Enerji ilk 10 sene te\u015fvikten yararlanarak sabit fiyat \u00fczerinden \u00a0daha sonra serbest piyasada sat\u0131\u015f yapmay\u0131 planl\u0131yor.<\/p>\n<p>Siemens\u2019in 6 megavatl\u0131k 197 metre uzunlu\u011fundaki t\u00fcrbininden bir bak\u0131\u015f:<\/p>\n<p><a href=\"http:\/\/enerjienstitusu.com\/medya\/dunyanin-en-buyuk-ruzgar-turbini-santrali.jpg\"><img loading=\"lazy\" src=\"http:\/\/enerjienstitusu.com\/medya\/dunyanin-en-buyuk-ruzgar-turbini-santrali.jpg\" alt=\"dunyanin en buyuk ruzgar turbini santrali\" width=\"311\" height=\"188\" \/><\/a><\/p>\n<p>Kaynak: <a href=\"http:\/\/enerjienstitusu.com\/2013\/11\/25\/siemens-dong-energyden-97-adet-ruzgar-turbini-siparisi-aldi\/\" target=\"_blank\">Enerji Enstit\u00fcs\u00fc<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Danimarka devlet enerji \u015firketi\u00a0Dong Energy, Siemens\u2019ten 97 adet r\u00fczgar t\u00fcrbini sipari\u015fi verdi. Dong Energy ve Siemens projenin maliyeti hakk\u0131nda bilgi vermedi. Yak\u0131n kaynaklar, [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":18137,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,50],"tags":[10626,63,67,1009,165,10628,10627,69,16,324,1053,5064],"views":866,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/18136"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=18136"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/18136\/revisions"}],"predecessor-version":[{"id":18138,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/18136\/revisions\/18138"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/18137"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=18136"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=18136"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=18136"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}