{"id":181057,"date":"2023-11-15T15:19:53","date_gmt":"2023-11-15T12:19:53","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=181057"},"modified":"2023-11-15T15:20:27","modified_gmt":"2023-11-15T12:20:27","slug":"paks-ii-ngs-projesi-ne-iliskin-gorusme-yapildi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/paks-ii-ngs-projesi-ne-iliskin-gorusme-yapildi\/","title":{"rendered":"(Turkish) &#8217;Paks-II NGS Projesi&#8217;ne \u0130li\u015fkin G\u00f6r\u00fc\u015fme Yap\u0131ld\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/181057\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2>Rusya Devlet N\u00fckleer Enerji Kurulu\u015fu Rosatom Genel M\u00fcd\u00fcr\u00fc Aleksey Likhachev ve Macaristan D\u0131\u015fi\u015fleri ve Ticaret Bakan\u0131 P\u00e9ter Szijj\u00e1rt\u00f3, Macaristan\u2019da in\u015fa edilen Paks-II N\u00fckleer G\u00fc\u00e7 Santrali (NGS) projesinin hayata ge\u00e7irilmesiyle ilgili olarak bir araya geldi ve ard\u0131ndan NGS sahas\u0131n\u0131 ziyaret etti.<\/h2>\n<p><img loading=\"lazy\" class=\"aligncenter wp-image-181060\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/11\/paks-ii-ngs-projesi-ne-iliskin-gorusme-yapildi-1.jpg\" alt=\"\" width=\"500\" height=\"334\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/11\/paks-ii-ngs-projesi-ne-iliskin-gorusme-yapildi-1.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/11\/paks-ii-ngs-projesi-ne-iliskin-gorusme-yapildi-1-300x200.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/11\/paks-ii-ngs-projesi-ne-iliskin-gorusme-yapildi-1-500x334.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/11\/paks-ii-ngs-projesi-ne-iliskin-gorusme-yapildi-1-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/11\/paks-ii-ngs-projesi-ne-iliskin-gorusme-yapildi-1-450x300.jpg 450w\" sizes=\"(max-width: 500px) 100vw, 500px\" \/><\/p>\n<p>G\u00f6r\u00fc\u015fmede Likhachev ve Szijj\u00e1rt\u00f3, ge\u00e7en y\u0131l genel lisans\u0131n al\u0131nmas\u0131 ve bu y\u0131l\u0131n a\u011fustos ay\u0131nda projenin in\u015fa a\u015famas\u0131na ge\u00e7mesinin ard\u0131ndan sahada y\u00fcr\u00fct\u00fclen <strong>\u00e7al\u0131\u015fmalar\u0131n kapsam\u0131<\/strong> ve<strong> yo\u011funlu\u011fundan<\/strong> \u00f6vg\u00fcyle s\u00f6z etti.<\/p>\n<p><strong>Rosatom Genel M\u00fcd\u00fcr\u00fc Aleksey Likhachev<\/strong> yapt\u0131\u011f\u0131 a\u00e7\u0131klamada en s\u00fcrd\u00fcr\u00fclebilir, \u00f6ng\u00f6r\u00fclebilir ve en \u00e7evre dostu elektrik \u00fcretim t\u00fcrlerinden biri olan n\u00fckleer enerjiyi kullanman\u0131n alternatifi olmad\u0131\u011f\u0131n\u0131 s\u00f6yledi. Rosatom&#8217;un VVER-1200 reakt\u00f6rlerinin seri in\u015fas\u0131nda deneyim kazand\u0131\u011f\u0131n\u0131 belirten Aleksey Likhachev, <em>\u201cYeni Macar g\u00fc\u00e7 \u00fcnitelerine \u00f6zel bir \u00f6nem veriyoruz ve bu projeyi m\u00fcmk\u00fcn oldu\u011funca etkili \u015fekilde uygulamaya haz\u0131r\u0131z. Rusya&#8217;da <strong>VVER-1200 tipi 4 g\u00fc\u00e7 \u00fcnitesini<\/strong> halihaz\u0131rda ba\u015far\u0131yla i\u015fletiliyor. K\u0131sa bir s\u00fcre \u00f6nce, kas\u0131m ay\u0131 ba\u015f\u0131nda Rosatom, bu t\u00fcr <strong>2 g\u00fc\u00e7 \u00fcnitesini in\u015fa etti\u011fimiz Belarus NGS&#8217;nin<\/strong> yap\u0131m\u0131n\u0131 tamamlad\u0131. Rosatom, yurt d\u0131\u015f\u0131ndaki di\u011fer sahalarda <strong>VVER-1200 reakt\u00f6re<\/strong> sahip olacak <strong>14 \u00fcnite<\/strong> daha in\u015fa ediyor\u201d<\/em> dedi.<\/p>\n<p><strong>D\u0131\u015fi\u015fleri ve Ticaret Bakan\u0131 P\u00e9ter Szijj\u00e1rt\u00f3 da<\/strong> a\u00e7\u0131klamas\u0131nda, <em>\u201cPaks-II n\u00fckleer g\u00fc\u00e7 santrali projesi, ger\u00e7ek anlamda uluslararas\u0131 bir projedir. Paks-II NGS&#8217;de iki yeni g\u00fc\u00e7 \u00fcnitesinin in\u015fas\u0131n\u0131n \u015fu anda Avrupa\u2019da in\u015faat lisans\u0131 alm\u0131\u015f en b\u00fcy\u00fck n\u00fckleer proje olmas\u0131ndan gurur duyuyoruz. Rus genel y\u00fcklenicinin yan\u0131 s\u0131ra <strong>94 Macar \u015firketinin<\/strong> ve \u00e7ok say\u0131da A<strong>merikal\u0131, Alman, Frans\u0131z, \u0130sve\u00e7li ve Avusturyal\u0131 y\u00fcklenicinin de<\/strong> projede yer almas\u0131 dolay\u0131s\u0131yla bu proje <strong>uluslararas\u0131 bir proje<\/strong> niteli\u011fini ta\u015f\u0131yor\u201d<\/em> ifadelerini kulland\u0131.<\/p>\n<p>Macar y\u00fcklenici, <strong>6\u2019nc\u0131 g\u00fc\u00e7 \u00fcnitesinin temel \u00e7ukurunun kaz\u0131lma i\u015flemini<\/strong> planlanandan \u00f6nce, <strong>5 metre derinli\u011fe kadar<\/strong> tamamlad\u0131. B\u00f6ylece toplam 4 hektarl\u0131k bir alanda yeralt\u0131 suyu seviyesine kadar kazma i\u015flemi tamamlanm\u0131\u015f oldu.<\/p>\n<p>Ay ba\u015f\u0131nda, t\u00fcm g\u00fcvenlik gerekliliklerine uyularak toprak stabilizasyon \u00e7al\u0131\u015fmalar\u0131 ba\u015flad\u0131. Bir Alman \u015firketinin \u00fcstlendi\u011fi bu \u00e7al\u0131\u015fma bir milyon tona kadar \u00e7imento kullan\u0131m\u0131n\u0131 i\u00e7eriyor. Ayn\u0131 zamanda, in\u015faat sahas\u0131n\u0131 yeralt\u0131 suyu s\u0131z\u0131nt\u0131s\u0131ndan korumak i\u00e7in tasarlanan <strong>2,7 km<\/strong> uzunlu\u011funda su ge\u00e7irmez katman\u0131n \u00fcnitelerin kurulaca\u011f\u0131 saha \u00e7evresindeki in\u015fas\u0131 devam ediyor. Bu \u00e7al\u0131\u015fmalar\u0131n 2023 y\u0131l\u0131 sonuna kadar tamamlanmas\u0131 ve bir sonraki \u00f6nemli a\u015fama olan topra\u011f\u0131n projede belirtilen derinlik olan <strong>23-27 metreye kadar<\/strong> kaz\u0131lmas\u0131 a\u015famas\u0131na ge\u00e7ilmesi planlan\u0131yor. B\u00f6ylece toplamda <strong>yakla\u015f\u0131k 4 milyon metrek\u00fcp<\/strong> toprak kaz\u0131lacak.<\/p>\n<p>Santral i\u00e7in uzun d\u00f6ng\u00fcl\u00fc ekipmanlar\u0131n \u00fcretimine Rusya\u2019da ba\u015fland\u0131. Bunlar aras\u0131nda <strong>reakt\u00f6r kab\u0131, kor tutucular, n\u00fckleer tesis makineleri ve di\u011fer ekipmanlar<\/strong> yer al\u0131yor. Sahadaki personel say\u0131s\u0131 da art\u0131yor. 2023 y\u0131l\u0131 sonuna kadar \u015fantiyedeki i\u015f\u00e7i say\u0131s\u0131n\u0131n<strong> 800<\/strong> ila <strong>900&#8217;e<\/strong> ula\u015fmas\u0131 bekleniyor. <strong>2024 y\u0131l\u0131 sonunda<\/strong> ise bu say\u0131n\u0131n<strong> 2 bin civar\u0131nda olmas\u0131<\/strong> \u00f6ng\u00f6r\u00fcl\u00fcyor. \u00c7al\u0131\u015fmalar\u0131n en yo\u011fun d\u00f6nemlerde de personel say\u0131s\u0131n\u0131n <strong>10<\/strong> ila <strong>13 bin ki\u015fiye<\/strong> \u00e7\u0131kaca\u011f\u0131 belirtiliyor.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Rusya Devlet N\u00fckleer Enerji Kurulu\u015fu Rosatom Genel M\u00fcd\u00fcr\u00fc Aleksey Likhachev ve Macaristan D\u0131\u015fi\u015fleri ve Ticaret Bakan\u0131 P\u00e9ter Szijj\u00e1rt\u00f3, Macaristan\u2019da in\u015fa edilen Paks-II [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":181059,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,43],"tags":[6666,19356,109992,2587],"views":39,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/181057"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=181057"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/181057\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/181059"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=181057"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=181057"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=181057"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}