{"id":180783,"date":"2023-11-08T13:19:05","date_gmt":"2023-11-08T10:19:05","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=180783"},"modified":"2023-11-08T13:19:05","modified_gmt":"2023-11-08T10:19:05","slug":"akkuyu-ngs-de-tam-olcekli-simulasyon-merkezi-devreye-alindi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/akkuyu-ngs-de-tam-olcekli-simulasyon-merkezi-devreye-alindi\/","title":{"rendered":"(Turkish) &#8217;Akkuyu NGS&#8217;de Tam \u00d6l\u00e7ekli Sim\u00fclasyon Merkezi Devreye Al\u0131nd\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/180783\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2>T\u00fcrkiye\u2019nin ilk n\u00fckleer g\u00fc\u00e7 santrali olan Akkuyu N\u00fckleer G\u00fc\u00e7 Santrali (NGS) sahas\u0131na kurulan<strong>\u00a0<\/strong>Tam \u00d6l\u00e7ekli Sim\u00fclat\u00f6r\u2019\u00fcn (T\u00d6S) a\u00e7\u0131l\u0131\u015f t\u00f6reni, E\u011fitim ve Tatbikat Merkezi&#8217;nin yeni binas\u0131nda ger\u00e7ekle\u015ftirildi. T\u00f6rene AKKUYU N\u00dcKLEER A.\u015e. ve Enerji ve Tabii Kaynaklar Bakanl\u0131\u011f\u0131 yetkililerinin yan\u0131 s\u0131ra, sim\u00fclat\u00f6r\u00fcn tedariki, kurulumu ve devreye al\u0131nmas\u0131ndan sorumlu NGS Rusatom Service \u015firketinin temsilcileri ile sim\u00fclat\u00f6r \u00fczerinde uygulamal\u0131 e\u011fitim alacak Akkuyu NGS m\u00fchendislerinden baz\u0131lar\u0131 da kat\u0131ld\u0131.<\/h2>\n<p style=\"text-align: center;\"><img loading=\"lazy\" class=\"aligncenter wp-image-180787\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/11\/akkuyu-ngs-de-tam-olcekli-simulasyon-merkezi-devreye-alindi-1.jpg\" alt=\"\" width=\"500\" height=\"333\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/11\/akkuyu-ngs-de-tam-olcekli-simulasyon-merkezi-devreye-alindi-1.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/11\/akkuyu-ngs-de-tam-olcekli-simulasyon-merkezi-devreye-alindi-1-300x200.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/11\/akkuyu-ngs-de-tam-olcekli-simulasyon-merkezi-devreye-alindi-1-500x333.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/11\/akkuyu-ngs-de-tam-olcekli-simulasyon-merkezi-devreye-alindi-1-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/11\/akkuyu-ngs-de-tam-olcekli-simulasyon-merkezi-devreye-alindi-1-450x300.jpg 450w\" sizes=\"(max-width: 500px) 100vw, 500px\" \/><\/p>\n<p>T\u00f6rende, AKKUYU N\u00dcKLEER A.\u015e. Genel M\u00fcd\u00fcr Birinci Yard\u0131mc\u0131s\u0131 ve NGS Yap\u0131 \u0130\u015fleri Direkt\u00f6r\u00fc Sergey Butckikh, T\u00fcrkiye Cumhuriyeti Enerji ve Tabii Kaynaklar Bakanl\u0131\u011f\u0131 temsilcisine tam \u00f6l\u00e7ekli sim\u00fclat\u00f6r\u00fcn ticari i\u015fletmeye al\u0131nmas\u0131na ili\u015fkin bir sertifika takdim etti. Sim\u00fclat\u00f6r\u00fcn a\u00e7\u0131l\u0131\u015f\u0131 yetkililerin kurdele kesmesiyle yap\u0131ld\u0131.<\/p>\n<p>T\u00f6rende konu\u015fan <strong>AKKUYU N\u00dcKLEER A.\u015e. Genel M\u00fcd\u00fcr Birinci Yard\u0131mc\u0131s\u0131 ve NGS Yap\u0131 \u0130\u015fleri Direkt\u00f6r\u00fc Sergey Butckikh<\/strong> \u015funlar\u0131 s\u00f6yledi:<em> &#8220;Bir n\u00fckleer enerji santralinin g\u00fcvenli ve istikrarl\u0131 bir \u015fekilde i\u015fletilmesinin \u00f6nemli bir \u015fart\u0131 i\u015fletme personelinin becerileri ve yeterlilikleridir. Tam \u00f6l\u00e7ekli bir sim\u00fclasyon merkezinin devreye al\u0131nmas\u0131 sayesinde operat\u00f6rlerimiz, ger\u00e7ek n\u00fckleer santralde oldu\u011fu gibi santralin i\u015fletilmesine ili\u015fkin t\u00fcm olas\u0131 senaryolar\u0131 m\u00fcmk\u00fcn oldu\u011funca yak\u0131n ko\u015fullar alt\u0131nda tecr\u00fcbe edecekler. 29 Ekim\u2019de, t\u00fcm devreye alma i\u015flemlerinin tamamlanmas\u0131n\u0131n ard\u0131ndan, AKKUYU N\u00dcKLEER A.\u015e. Genel M\u00fcd\u00fcr\u00fc Anastasia Zoteeva, tam \u00f6l\u00e7ekli sim\u00fclat\u00f6r\u00fcn ticari i\u015fletmeye al\u0131nmas\u0131 i\u00e7in bir talimat imzalad\u0131 ve bu tarihten itibaren sim\u00fclat\u00f6r resmi olarak \u00e7al\u0131\u015fmaya tamamen haz\u0131r hale geldi.&#8221;\u00a0<\/em><\/p>\n<p><strong>T\u00fcrkiye Cumhuriyeti Enerji ve Tabii Kaynaklar Bakanl\u0131\u011f\u0131 N\u00fckleer Altyap\u0131 Geli\u015ftirme Dairesi Ba\u015fkan\u0131 Salih Sar\u0131<\/strong> da Tam \u00d6l\u00e7ekli Sim\u00fclat\u00f6r\u00fcn geli\u015ftirilmesi, kurulumu ve devreye al\u0131nmas\u0131nda eme\u011fi ge\u00e7enlere te\u015fekk\u00fcr ederek, \u015funlar\u0131 kaydetti: <em>\u201cN\u00fckleer santralde \u00e7al\u0131\u015facaklar\u0131n y\u00fcksek bilgi ve becerinin yan\u0131 s\u0131ra y\u00fcksek d\u00fczeyde g\u00fcvenlik ve kalite k\u00fclt\u00fcr\u00fcne sahip olmas\u0131 gerekiyor.\u00a0 Bu merkez, santralde \u00e7al\u0131\u015facak operat\u00f6r ve m\u00fchendislerin gerekli yetkinlikleri kazanmas\u0131na b\u00fcy\u00fck bir katk\u0131 sa\u011flayacak. Tam \u00f6l\u00e7ekli sim\u00fclat\u00f6r\u00fcn y\u0131llar boyunca Akkuyu santralinde hizmet edece\u011fini biliyoruz On binlerce T\u00fcrk m\u00fchendis ve operat\u00f6r buralarda e\u011fitim alacak.\u201d<\/em><\/p>\n<p>Tam \u00d6l\u00e7ekli Sim\u00fclat\u00f6r, Akkuyu NGS reakt\u00f6r g\u00fc\u00e7 kayna\u011f\u0131 ve kontrol sistemlerinin <strong>dijital ikizi<\/strong> olan bir yaz\u0131l\u0131m ve donan\u0131m kompleksi i\u00e7eriyor. Bu kompleks, bir n\u00fckleer enerji santralinin t\u00fcm \u00e7al\u0131\u015fma modlar\u0131n\u0131n ger\u00e7ek zamanl\u0131 sim\u00fclasyonunu sa\u011flayan karma\u015f\u0131k bir matematiksel model kullan\u0131yor. T\u00fcm ekipmanlar\u0131 ve kontrol panelleri Akkuyu NGS g\u00fc\u00e7 \u00fcnitesinin y\u00f6netim panosundaki ekipmanlar\u0131yla ayn\u0131 olan sim\u00fclat\u00f6r\u00fcn monit\u00f6rlerinde g\u00f6r\u00fcnt\u00fclenen bilgiler, operat\u00f6re ger\u00e7ek bir NGS g\u00fc\u00e7 \u00fcnitesindekine benzer bir bi\u00e7imde ve de\u011ferlerde yans\u0131yor.<\/p>\n<p>G\u00fc\u00e7 \u00fcnitesi operasyonunun <strong>t\u00fcm senaryolar\u0131n\u0131 uygulamay\u0131<\/strong> ve <strong>i\u015fletme personelinin niteliklili\u011fini geli\u015ftirmeyi<\/strong> ama\u00e7layan sim\u00fclat\u00f6rde e\u011fitim g\u00f6ren \u00e7al\u0131\u015fanlar\u0131n<strong> Akkuyu NGS&#8217;de<\/strong> \u00e7al\u0131\u015fmaya ba\u015flamadan \u00f6nce<strong> sertifika s\u0131nav\u0131n\u0131 ge\u00e7me<\/strong> ve <strong>T\u00fcrkiye Cumhuriyeti N\u00fckleer D\u00fczenleme Kurumu&#8217;ndan (NDK) lisans alma<\/strong> gibi di\u011fer a\u015famalar\u0131 da tamamlamalar\u0131 gerekecek.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. T\u00fcrkiye\u2019nin ilk n\u00fckleer g\u00fc\u00e7 santrali olan Akkuyu N\u00fckleer G\u00fc\u00e7 Santrali (NGS) sahas\u0131na kurulan\u00a0Tam \u00d6l\u00e7ekli Sim\u00fclat\u00f6r\u2019\u00fcn (T\u00d6S) a\u00e7\u0131l\u0131\u015f t\u00f6reni, E\u011fitim ve Tatbikat Merkezi&#8217;nin [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":180786,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,43],"tags":[3019,48024,19356,110045],"views":22,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/180783"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=180783"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/180783\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/180786"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=180783"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=180783"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=180783"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}