{"id":18070,"date":"2013-11-22T16:28:55","date_gmt":"2013-11-22T13:28:55","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=18070"},"modified":"2013-11-22T16:35:59","modified_gmt":"2013-11-22T13:35:59","slug":"borusan-res-projesini-3-4-ay-icinde-devreye-alacak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/borusan-res-projesini-3-4-ay-icinde-devreye-alacak\/","title":{"rendered":"(Turkish) Borusan RES Projesini 3-4 Ay \u0130\u00e7inde Devreye Alacak!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/18070\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Borusan CEO Agah U\u011fur yapt\u0131\u011f\u0131 a\u00e7\u0131klam<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/11\/borusan-enbw-balabanli-ruzgar-santrali-devreye-girecek-enerji-yatirim.jpg\"><img loading=\"lazy\" class=\"alignleft size-medium wp-image-18071\" title=\"borusan-enbw-balabanli-ruzgar-santrali-devreye-girecek-enerji-yatirim\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/11\/borusan-enbw-balabanli-ruzgar-santrali-devreye-girecek-enerji-yatirim-300x200.jpg\" alt=\"\" width=\"300\" height=\"200\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/11\/borusan-enbw-balabanli-ruzgar-santrali-devreye-girecek-enerji-yatirim-300x200.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/11\/borusan-enbw-balabanli-ruzgar-santrali-devreye-girecek-enerji-yatirim-74x50.jpg 74w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/11\/borusan-enbw-balabanli-ruzgar-santrali-devreye-girecek-enerji-yatirim.jpg 451w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>ada, 250 milyon euro maliyetinde 5 projeden olu\u015fan 200 MW portf\u00f6ye sahip r\u00fczgar yat\u0131r\u0131m\u0131n\u0131 ba\u015flatacaklar\u0131n\u0131 a\u00e7\u0131klad\u0131. \u015eirket, r\u00fczgar projelerinde paket \u015feklinde projelerde ilerlemeyi hedefliyor.<\/strong><\/p>\n<p>Enerjideki yat\u0131r\u0131mlar\u0131n ucun vadeli yat\u0131r\u0131mlar oldu\u011funu kaydeden U\u011fur, geri d\u00f6n\u00fc\u015f\u00fcm\u00fcn 3-4 y\u0131l sonra ba\u015flad\u0131\u011f\u0131n\u0131 dolay\u0131s\u0131yla ciroyu etkilemedi\u011fini s\u00f6yledi.<\/p>\n<p>\u015eirketin, 250 MW hidrolik, 450 MW r\u00fczgar olmak \u00fczere 700 MW enerji portf\u00f6y\u00fc bulunuyor. ENBW ile ortakl\u0131\u011f\u0131 bulunan \u015firketin,\u00a0110 megavatl\u0131k kurulu g\u00fcc\u00fc \u00fcretim yap\u0131yor. \u015eirket, 50 megavat kurulu g\u00fccteki RES projesini 3-4 ay i\u00e7inde \u00fcretime almay\u0131 hedefliyor.<\/p>\n<p>Kaynak: <a href=\"http:\/\/enerjienstitusu.com\/2013\/11\/22\/borusan-50-megavatlik-ruzgar-kapasitesini-3-4-ay-icinde-devreye-alacak\/\" target=\"_blank\">Enerji Enstit\u00fcs\u00fc<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Borusan CEO Agah U\u011fur yapt\u0131\u011f\u0131 a\u00e7\u0131klamada, 250 milyon euro maliyetinde 5 projeden olu\u015fan 200 MW portf\u00f6ye sahip r\u00fczgar yat\u0131r\u0131m\u0131n\u0131 ba\u015flatacaklar\u0131n\u0131 a\u00e7\u0131klad\u0131. \u015eirket, r\u00fczgar [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":18071,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,50],"tags":[10594,829,10596,63,67,1009,165,474,10595,69,16,231],"views":889,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/18070"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=18070"}],"version-history":[{"count":2,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/18070\/revisions"}],"predecessor-version":[{"id":18075,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/18070\/revisions\/18075"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/18071"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=18070"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=18070"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=18070"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}