{"id":180550,"date":"2023-10-31T17:27:55","date_gmt":"2023-10-31T14:27:55","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=180550"},"modified":"2023-10-31T17:28:13","modified_gmt":"2023-10-31T14:28:13","slug":"asti-nin-catisina-gunes-enerjisi-santrali-kurulacak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/asti-nin-catisina-gunes-enerjisi-santrali-kurulacak\/","title":{"rendered":"(Turkish) &#8217;A\u015eT\u0130&#8217;nin \u00c7at\u0131s\u0131na G\u00fcne\u015f Enerjisi Santrali Kurulacak"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/180550\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2><strong>Ankara B\u00fcy\u00fck\u015fehir Belediyesi, her g\u00fcn on binlerce yolcuyu a\u011f\u0131rlayan A\u015eT\u0130\u2019ye Enerji Santrali (GES) kurmaya haz\u0131rlan\u0131yor.<\/strong><\/h2>\n<p style=\"text-align: center;\"><img loading=\"lazy\" class=\"aligncenter wp-image-180552\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/10\/asti-nin-catisina-gunes-enerjisi-santrali-kurulacak.jpg\" alt=\"\" width=\"500\" height=\"300\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/10\/asti-nin-catisina-gunes-enerjisi-santrali-kurulacak.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/10\/asti-nin-catisina-gunes-enerjisi-santrali-kurulacak-300x180.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/10\/asti-nin-catisina-gunes-enerjisi-santrali-kurulacak-500x300.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/10\/asti-nin-catisina-gunes-enerjisi-santrali-kurulacak-80x48.jpg 80w\" sizes=\"(max-width: 500px) 100vw, 500px\" \/><\/p>\n<p>Yeni sistem sayesinde; <strong>yenilenmi\u015f \u00e7at\u0131 ve elektrik \u00fcretimi<\/strong> ile <strong>i\u00e7 t\u00fcketimin yakla\u015f\u0131k y\u00fczde 50\u2019sinin<\/strong> yenilenebilir enerji kayna\u011f\u0131ndan kar\u015f\u0131lanmas\u0131 hedefleniyor. A\u015eT\u0130 G\u00fcne\u015f Enerjisi Yap\u0131m \u0130\u015fi \u0130halesi <strong>22 Kas\u0131m 2023\u2019te<\/strong> ger\u00e7ekle\u015fecek. Ankara B\u00fcy\u00fck\u015fehir Belediyesi, <strong>yenilenebilir<\/strong> ve <strong>s\u00fcrd\u00fcr\u00fclebilir \u00e7evre dostu projeleri<\/strong> hayata ge\u00e7irmeye devam ediyor.<\/p>\n<p>B\u00fcy\u00fck\u015fehir Belediyesi, her g\u00fcn on binlerce yolcuyu a\u011f\u0131rlayan A\u015eT\u0130\u2019ye G\u00fcne\u015f Enerji Santrali kurmaya haz\u0131rlan\u0131yor. <strong>22 Kas\u0131m 2023<\/strong> tarihinde ger\u00e7ekle\u015fen <strong>A\u015eT\u0130 G\u00fcne\u015f Enerjisi Yap\u0131m \u0130\u015fi \u0130halesi<\/strong>\u2019nin ard\u0131ndan <strong>kurulacak sistem ile enerji sarfiyat\u0131n\u0131n \u00f6n\u00fcne ge\u00e7ilmesi<\/strong> hedefleniyor.<\/p>\n<h3><strong>\u0130HALE S\u00dcREC\u0130 BA\u015eLADI<\/strong><\/h3>\n<p>Bak\u0131r \u00e7at\u0131ya sahip ve y\u0131ll\u0131k enerji t\u00fcketimi yakla\u015f\u0131k <strong>6 milyon 900 bin kWh<\/strong> olan terminalin enerji t\u00fcketiminin fazla olmas\u0131 nedeniyle harekete ge\u00e7en B\u00fcy\u00fck\u015fehir Belediyesi, <strong>A\u015eT\u0130 GES Projesi<\/strong>\u2019nin <strong>mevzuatsal s\u00fcre\u00e7lerini<\/strong> tamamlad\u0131. <strong>\u00c7at\u0131 revizyonu<\/strong> yeni tamamlanan <strong>A\u015eT\u0130\u2019de<\/strong> kurulacak GES i\u00e7in de fizibilite ve yasal \u00f6n haz\u0131rl\u0131k \u00e7al\u0131\u015fmalar\u0131n\u0131n da tamamlanmas\u0131yla proje ihalesinin <strong>22 Kas\u0131m 2023<\/strong> tarihinde <strong>saat 14.00\u2019te<\/strong> yap\u0131lmas\u0131 kararla\u015ft\u0131r\u0131ld\u0131.<\/p>\n<h3><strong>KULLANIM \u00d6MR\u00dc EN AZ 25 YIL<\/strong><\/h3>\n<p>Proje kapsam\u0131nda <strong>22 bin metrekare<\/strong> \u00e7at\u0131n\u0131n <strong>15 bin metrekare<\/strong> alan\u0131nda <strong>4 bin 170 panel<\/strong> konumland\u0131r\u0131lacak. A\u015eT\u0130 GES proje <strong>kullan\u0131m \u00f6mr\u00fc minimum 25 y\u0131l<\/strong> olarak belirlenirken <strong>Ba\u015fkent EDA\u015e<\/strong> ile <strong>2 Mart 2022<\/strong> tarihinde <strong>\u201cLisanss\u0131z Elektrik \u00dcreticileri \u0130\u00e7in Da\u011f\u0131t\u0131m Sistemine Ba\u011flant\u0131 Anla\u015fmas\u0131\u201d<\/strong> imzaland\u0131. <strong>Yenilenmi\u015f \u00e7at\u0131<\/strong> ve <strong>elektrik \u00fcretimi<\/strong> ile i\u00e7 t\u00fcketimin <strong>yakla\u015f\u0131k y\u00fczde 50\u2019sinin<\/strong> yenilenebilir enerji kayna\u011f\u0131ndan kar\u015f\u0131lanmas\u0131 hedefleniyor.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Ankara B\u00fcy\u00fck\u015fehir Belediyesi, her g\u00fcn on binlerce yolcuyu a\u011f\u0131rlayan A\u015eT\u0130\u2019ye Enerji Santrali (GES) kurmaya haz\u0131rlan\u0131yor. Yeni sistem sayesinde; yenilenmi\u015f \u00e7at\u0131 ve elektrik [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":180552,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[24431,111089,111088,2206],"views":94,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/180550"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=180550"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/180550\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/180552"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=180550"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=180550"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=180550"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}