{"id":180155,"date":"2023-10-19T16:43:30","date_gmt":"2023-10-19T13:43:30","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=180155"},"modified":"2023-10-19T16:43:49","modified_gmt":"2023-10-19T13:43:49","slug":"akkuyu-ngs-nin-1-guc-unitesi-nde-kutup-vinci-isletmeye-alindi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/akkuyu-ngs-nin-1-guc-unitesi-nde-kutup-vinci-isletmeye-alindi\/","title":{"rendered":"(Turkish) &#8217;Akkuyu NGS&#8217;nin 1. G\u00fc\u00e7 \u00dcnitesinde Kutup Vinci \u0130\u015fletmeye Al\u0131nd\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/180155\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2>T\u00fcrkiye\u2019nin ilk n\u00fckleer g\u00fc\u00e7 santrali Akkuyu N\u00fckleer G\u00fc\u00e7 Santrali\u2019nde (NGS) 390 ton kald\u0131rma kapasiteli ilk dairesel k\u00f6pr\u00fc vinci i\u015fletmeye al\u0131nd\u0131. Vin\u00e7, Akkuyu NGS\u2019nin 1\u2019inci g\u00fc\u00e7 \u00fcnitesinin ya\u015fam d\u00f6ng\u00fcs\u00fcn\u00fcn t\u00fcm a\u015famalar\u0131nda kullan\u0131lacak.<\/h2>\n<p style=\"text-align: center;\"><img loading=\"lazy\" class=\"aligncenter wp-image-180159\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/10\/akkuyu-ngs-nin-1-guc-unitesi-nde-kutup-vinci-isletmeye-alindi-1.jpg\" alt=\"\" width=\"500\" height=\"313\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/10\/akkuyu-ngs-nin-1-guc-unitesi-nde-kutup-vinci-isletmeye-alindi-1.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/10\/akkuyu-ngs-nin-1-guc-unitesi-nde-kutup-vinci-isletmeye-alindi-1-300x188.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/10\/akkuyu-ngs-nin-1-guc-unitesi-nde-kutup-vinci-isletmeye-alindi-1-500x313.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/10\/akkuyu-ngs-nin-1-guc-unitesi-nde-kutup-vinci-isletmeye-alindi-1-80x50.jpg 80w\" sizes=\"(max-width: 500px) 100vw, 500px\" \/><\/p>\n<p><strong>Dairesel k\u00f6pr\u00fc vinci<\/strong>, ya da di\u011fer ad\u0131yla <strong>kutup vinci<\/strong>, reakt\u00f6r b\u00f6lmesinin en \u00f6nemli mekanizmalar\u0131ndan biri olarak kabul ediliyor.\u00a0Reakt\u00f6r\u00fcn ikmali ve bak\u0131m\u0131 i\u00e7in kullan\u0131lacak olan vin\u00e7, buradaki kald\u0131rma ve ta\u015f\u0131ma i\u015flemlerinin yan\u0131 s\u0131ra n\u00fckleer yak\u0131t\u0131n reakt\u00f6re y\u00fcklenmesinden sorumlu olan \u00f6zel bir yeniden y\u00fckleme makinesinin \u00e7al\u0131\u015fma alan\u0131na teslim edilmesinde ve \u00e7e\u015fitli ekipmanlar\u0131n ta\u015f\u0131nmas\u0131nda da g\u00f6rev alacak.<\/p>\n<p>Reakt\u00f6r binas\u0131n\u0131n \u00fcst silindirik k\u0131sm\u0131na monte edilmi\u015f dairesel bir ray yolu \u00fczerinde hareket edecek olan vincin mekanizmas\u0131, ta\u015f\u0131ma i\u015flemlerini reakt\u00f6r binas\u0131n\u0131n merkezindeki herhangi bir noktada yapabilme imk\u00e2n\u0131 sunuyor. Vincin \u00fczerinde bulundu\u011fu mekanizma da uzunlu\u011fu 41,5 metre olan bir k\u00f6pr\u00fc boyunca hareket edebiliyor.<\/p>\n<p>\u0130\u015fletmeye almaya haz\u0131rl\u0131k s\u0131ras\u0131nda ana ta\u015f\u0131ma mekanizmas\u0131n\u0131n statik testleri <strong>487,5 tonluk<\/strong> sim\u00fcle edilmi\u015f y\u00fckle ger\u00e7ekle\u015ftirildi. Vincin t\u00fcm bile\u015fenlerinin toplam a\u011f\u0131rl\u0131\u011f\u0131 ise <strong>yakla\u015f\u0131k 500 ton.<\/strong><\/p>\n<p>AKKUYU N\u00dcKLEER A.\u015e Genel M\u00fcd\u00fcr Birinci Yard\u0131mc\u0131s\u0131 ve NGS Yap\u0131 \u0130\u015fleri Direkt\u00f6r\u00fc<br \/>\nSergey Butckikh kutup vincinin i\u015fletmeye al\u0131nmas\u0131na ili\u015fkin olarak yapt\u0131\u011f\u0131 a\u00e7\u0131klamada \u015funlar\u0131 s\u00f6yledi: <em>\u201cN\u00fckleer reakt\u00f6r\u00fcn montaj\u0131 i\u00e7in ta\u015f\u0131ma ve teknolojik i\u015flemleri y\u00fcr\u00fctmek \u00fczere kullan\u0131lacak olan kutup vinci, devreye alma testlerini ba\u015far\u0131yla ge\u00e7ti ve art\u0131k \u00e7al\u0131\u015fmaya tamamen haz\u0131r.\u00a0Bu vin\u00e7, \u00e7ok a\u015famal\u0131 n\u00fckleer reakt\u00f6r montaj s\u00fcrecine ve ard\u0131ndan fiziksel ba\u015flatma a\u015famalar\u0131na dahil olacak. Vin\u00e7,<strong> k\u00f6pr\u00fc, servis arabas\u0131, dokunmatik ekranl\u0131 kontrol kabini<\/strong>, reakt\u00f6r b\u00f6lmesinin bas\u0131n\u00e7l\u0131 alan\u0131n\u0131n d\u0131\u015f\u0131nda ayr\u0131 bir odaya monte edilen <strong>\u00f6zel kontrol kabinleri<\/strong> gibi \u00e7e\u015fitli bile\u015fenlerden olu\u015fan <strong>karma\u015f\u0131k bir teknolojik m\u00fchendislik<\/strong> yap\u0131s\u0131d\u0131r.\u00a0Burada da yine her zaman oldu\u011fu gibi\u00a0<strong>\u00f6nceli\u011fimizin g\u00fcvenlik<\/strong> oldu\u011funu\u00a0belirtmek isterim. Bu t\u00fcr vin\u00e7lerin kullan\u0131m\u0131nda sadece deneyim ve beceriye sahip <strong>\u00f6zel e\u011fitimli<\/strong> ve <strong>sertifikal\u0131 operat\u00f6rlerin vinci kullanmas\u0131na<\/strong> izin verilmektedir.\u201d<\/em><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. T\u00fcrkiye\u2019nin ilk n\u00fckleer g\u00fc\u00e7 santrali Akkuyu N\u00fckleer G\u00fc\u00e7 Santrali\u2019nde (NGS) 390 ton kald\u0131rma kapasiteli ilk dairesel k\u00f6pr\u00fc vinci i\u015fletmeye al\u0131nd\u0131. Vin\u00e7, Akkuyu [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":180158,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,43],"tags":[3019,1303,110980,110981,19356],"views":36,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/180155"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=180155"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/180155\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/180158"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=180155"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=180155"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=180155"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}