{"id":180012,"date":"2023-10-16T15:38:19","date_gmt":"2023-10-16T12:38:19","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=180012"},"modified":"2023-10-16T15:38:19","modified_gmt":"2023-10-16T12:38:19","slug":"cengiz-holding-in-sanayi-de-yesil-devrimi-mardin-de-devam-ediyor","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/cengiz-holding-in-sanayi-de-yesil-devrimi-mardin-de-devam-ediyor\/","title":{"rendered":"(Turkish) Cengiz Holding\u2019in Sanayide &#8216;Ye\u015fil Devrim&#8217;i Mardin\u2019de Devam Ediyor"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/180012\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2><strong>Sanayi tesislerinde \u2018ye\u015fil enerji\u2019 d\u00f6nemini ba\u015flatan Cengiz Holding, grup \u015firketi Eti Bak\u0131r\u2019\u0131n elektrik ihtiyac\u0131n\u0131 kar\u015f\u0131lamak i\u00e7in yeni bir g\u00fcne\u015f enerji santrali yat\u0131r\u0131m\u0131na ba\u015flad\u0131. Mardin Maz\u0131da\u011f\u0131 Metal Geri D\u00f6n\u00fc\u015f\u00fcm ve Entegre G\u00fcbre Tesisi\u2019nin arazisinde yap\u0131lacak santral, 52 MW kurulu g\u00fcce sahip olacak. Projeyle Eti Bak\u0131r Samsun \u0130zabe ve Elektroliz Tesisi\u2019nin elektrik ihtiyac\u0131 kar\u015f\u0131lanacak.<\/strong><\/h2>\n<p style=\"text-align: center;\"><img loading=\"lazy\" class=\"aligncenter wp-image-180015\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/10\/cengiz-holding-in-sanayi-de-yesil-devrimi-mardin-de-devam-ediyor-1.jpg\" alt=\"\" width=\"500\" height=\"333\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/10\/cengiz-holding-in-sanayi-de-yesil-devrimi-mardin-de-devam-ediyor-1.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/10\/cengiz-holding-in-sanayi-de-yesil-devrimi-mardin-de-devam-ediyor-1-300x200.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/10\/cengiz-holding-in-sanayi-de-yesil-devrimi-mardin-de-devam-ediyor-1-500x333.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/10\/cengiz-holding-in-sanayi-de-yesil-devrimi-mardin-de-devam-ediyor-1-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/10\/cengiz-holding-in-sanayi-de-yesil-devrimi-mardin-de-devam-ediyor-1-450x300.jpg 450w\" sizes=\"(max-width: 500px) 100vw, 500px\" \/><\/p>\n<p>Katma de\u011ferli sanayi \u00fcretimine odaklanan Cengiz Holding\u2019in \u201cye\u015fil \u00fcretim\u201d vizyonu t\u00fcm end\u00fcstri tesislerinde devam ediyor. Toplam 4.842 MW\u2019l\u0131k kurulu g\u00fcce ula\u015fan enerji sekt\u00f6r\u00fcnde, b\u00fcy\u00fcme stratejisini yenilenebilir kaynaklar \u00fczerine kuran grup, sanayi tesislerinin enerji ihtiyac\u0131n\u0131 da yenilenebilir kaynaklardan temin etmek \u00fczere yat\u0131r\u0131mlar\u0131n\u0131 s\u00fcrd\u00fcr\u00fcyor. <strong>Eti Bak\u0131r Samsun \u0130zabe ve Elektroliz Tesisi<\/strong>\u2019nin elektrik ihtiyac\u0131n\u0131 kar\u015f\u0131lamak \u00fczere <strong>Mardin\u2019de g\u00fcne\u015f enerji santrali (GES)<\/strong> yat\u0131r\u0131m\u0131na ba\u015flayan <strong>Cengiz Holding<\/strong>, yeni y\u0131l\u0131n ba\u015f\u0131nda tamamlayaca\u011f\u0131 projeyle <strong>yenilenebilir enerjideki kurulu g\u00fcc\u00fc<\/strong>ne <strong>52 MW<\/strong> daha ekleyecek.<\/p>\n<h3><strong>ELEKTR\u0130\u011e\u0130N %40\u2019I MARD\u0130N\u2019DEN GELECEK<\/strong><\/h3>\n<p><strong>Cengiz Holding Enerji Grup Ba\u015fkan\u0131 Ahmet Cengiz<\/strong>, Eti Al\u00fcminyum\u2019dan sonra Eti Bak\u0131r\u2019\u0131n da \u00fcretimde kullan\u0131lan elektri\u011fi yenilenebilir kaynaklardan sa\u011flayabilmesi i\u00e7in d\u00fc\u011fmeye bast\u0131klar\u0131n\u0131 s\u00f6yledi. Projeyi 2024\u2019\u00fcn ba\u015f\u0131nda tamamlamay\u0131 hedeflediklerini dile getiren Cengiz, \u201cT\u00fcrkiye\u2019nin madenden katot bak\u0131r \u00fcretebilen tek izabe tesisi olan Eti Bak\u0131r\u2019\u0131n Samsun\u2019daki tesisi i\u00e7in yat\u0131r\u0131m\u0131n\u0131 s\u00fcrd\u00fcrd\u00fc\u011f\u00fcm\u00fcz <strong>Eti Bak\u0131r-2 GES<\/strong> projemiz, <strong>52 MW<\/strong> kurulu g\u00fcce sahip olacak. Santral \u00fcretime ba\u015flad\u0131\u011f\u0131nda <strong>Samsun\u2019un \u00fcretimde<\/strong> ihtiyac\u0131 olan elektri\u011fin <strong>%40\u2019\u0131n\u0131<\/strong> buradan sa\u011flayaca\u011f\u0131z\u201d diye konu\u015ftu.<\/p>\n<h3><strong>\u2018YEN\u0130LENEB\u0130L\u0130R H\u0130BR\u0130T D\u00d6NEM\u0130 BA\u015eLATTIK\u2019\u00a0<\/strong><\/h3>\n<p>Katma de\u011ferli sanayi ve maden teknolojileri alan\u0131nda T\u00fcrk \u015firketlerine \u00f6nc\u00fcl\u00fck yapt\u0131klar\u0131n\u0131 ifade eden Cengiz, s\u00f6zlerine \u015f\u00f6yle devam etti: <em>\u201cSon 5 y\u0131ld\u0131r t\u00fcm yat\u0131r\u0131mlar\u0131m\u0131z\u0131n oda\u011f\u0131nda s\u00fcrd\u00fcr\u00fclebilirlik ve buna ba\u011fl\u0131 olarak <strong>yenilenebilir enerji kaynaklar\u0131ndan<\/strong> beslenen sanayi \u00fcretimi var. Enerji i\u015f kolunda da b\u00fcy\u00fcme stratejimizi <strong>yenilenebilir kaynaklar<\/strong> \u00fczerine kurduk;<strong> GES<\/strong> ve <strong>RES yat\u0131r\u0131mlar\u0131m\u0131z\u0131<\/strong> s\u00fcrd\u00fcr\u00fcyoruz. T\u00fcrkiye\u2019nin farkl\u0131 \u015fehirlerinde, toplam <strong>500 MW<\/strong> g\u00fcc\u00fcnde <strong>g\u00fcne\u015f enerjisi santralini<\/strong> hayata ge\u00e7irdik. Di\u011fer yandan da sanayide yenilenebilir enerji kaynaklar\u0131yla g\u00fc\u00e7lendirdi\u011fimiz bir d\u00f6nem ba\u015flatt\u0131k. Bunun bir \u00f6rne\u011fi Eti Al\u00fcminyum\u2019un Seydi\u015fehir tesisinde kurdu\u011fumuz <strong>Eti-1, Eti-2, Eti-3\u2019ten<\/strong> olu\u015fan <strong>g\u00fcne\u015f enerji santralleri<\/strong>. Bu yat\u0131r\u0131mlarla <strong>100 MW<\/strong>\u2019l\u0131k kurulu g\u00fcce ula\u015fan <strong>Eti Al\u00fcminyum<\/strong>\u2019da, <strong>Eti-4<\/strong>\u2019\u00fcn de \u00fcretime ba\u015flamas\u0131 i\u00e7in g\u00fcn say\u0131yoruz. Hem <strong>GES\u2019ler<\/strong> hem de <strong>Oymap\u0131nar Hidroelektrik Santrali<\/strong> sayesinde <strong>Eti Al\u00fcminyum<\/strong>\u2019un \u00fcretimde kulland\u0131\u011f\u0131 enerjinin tamam\u0131 <strong>yenilenebilir kaynaklardan<\/strong> sa\u011flan\u0131yor. \u015eimdi ayn\u0131 vizyonu <strong>Mardin\u2019de<\/strong> hayata ge\u00e7irece\u011fimiz <strong>g\u00fcne\u015f enerjisi santralleriyle<\/strong> bir ad\u0131m \u00f6teye ta\u015f\u0131yaca\u011f\u0131z. Bu yat\u0131r\u0131m, grubumuzun ve b\u00fcnyemizdeki <strong>Eti Bak\u0131r<\/strong>\u2019\u0131n sanayide <strong>s\u00fcrd\u00fcr\u00fclebilirlik<\/strong> konusunda <strong>\u00f6nc\u00fc olma kararl\u0131l\u0131\u011f\u0131n\u0131n<\/strong> en somut kan\u0131t\u0131\u201d<\/em> dedi.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Sanayi tesislerinde \u2018ye\u015fil enerji\u2019 d\u00f6nemini ba\u015flatan Cengiz Holding, grup \u015firketi Eti Bak\u0131r\u2019\u0131n elektrik ihtiyac\u0131n\u0131 kar\u015f\u0131lamak i\u00e7in yeni bir g\u00fcne\u015f enerji santrali yat\u0131r\u0131m\u0131na [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":180014,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49],"tags":[2889,26492,7459,110938,110939,85116,431],"views":62,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/180012"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=180012"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/180012\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/180014"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=180012"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=180012"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=180012"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}