{"id":17990,"date":"2013-11-21T18:40:47","date_gmt":"2013-11-21T15:40:47","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=17990"},"modified":"2013-11-21T18:40:47","modified_gmt":"2013-11-21T15:40:47","slug":"aksa-enerjiden-vana-75-mwlik-hes-projesi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/aksa-enerjiden-vana-75-mwlik-hes-projesi\/","title":{"rendered":"(Turkish) Aksa Enerji\u2019den Van\u2019a 75 MW\u2019l\u0131k HES Projesi&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/17990\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Aksa Enerji \u00dcretim A.\u015e.\u2019nin Van\u2019\u0131n \u00c7atak il\u00e7esi Botan \u00c7ay\u0131 havzas\u0131 \u00fczerinde kurmay\u0131 planlad\u0131\u011f\u0131 75 MW g\u00fcc\u00fcndeki Narl\u0131 Baraj\u0131 ve HES Projesi i\u00e7in \u00c7evresel Etki De\u011ferlendirme (\u00c7ED) s\u00fcreci ba\u015flad\u0131. Proje i\u00e7in \u00c7ED ba\u015fvurusu yapan firma, di\u011fer izinlerini de tamamlayarak, lisans\u0131n\u0131 almay\u0131 ve 3 y\u0131l s\u00fcrecek in\u015faat \u00e7al\u0131\u015fmalar\u0131na ba\u015flamay\u0131 hedefliyor.<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/08\/guris-sarikavak-hes-i-satin-aldi.jpg\"><img loading=\"lazy\" class=\"alignright size-medium wp-image-14207\" title=\"hes-projesi\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/08\/guris-sarikavak-hes-i-satin-aldi-300x217.jpg\" alt=\"\" width=\"300\" height=\"217\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/08\/guris-sarikavak-hes-i-satin-aldi-300x217.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/08\/guris-sarikavak-hes-i-satin-aldi-500x362.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/08\/guris-sarikavak-hes-i-satin-aldi-69x50.jpg 69w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/08\/guris-sarikavak-hes-i-satin-aldi.jpg 650w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><\/strong><\/p>\n<p><strong>PROJEN\u0130N MAL\u0130YET\u0130 288 M\u0130LYON EURO<\/strong><br \/>\nNarl\u0131 Baraj\u0131 ve HES Projesi\u2019nin yakla\u015f\u0131k yat\u0131r\u0131m tutar\u0131n\u0131n 288 milyon Euro olmas\u0131 hedefleniyor.<\/p>\n<p>HES\u2019in Botan \u00c7ay\u0131\u2019n\u0131n 1280 m talveg kotunda in\u015fa edilmesi planlan\u0131yor. Proje alan\u0131na Van, Edremit, Bah\u00e7esaray, \u00c7atak, Pervari, Siirt karayolunun \u00c7atak il\u00e7esini ge\u00e7tikten sonra 4 km\u2019lik bir yol ile ula\u015f\u0131laca\u011f\u0131 ve projede ayr\u0131ca tesislere ula\u015f\u0131m i\u00e7in 4 km\u2019lik bir servis yolu yap\u0131laca\u011f\u0131 bildiriliyor.<\/p>\n<p><strong>3 T\u00dcRB\u0130N KULLANILACAK<\/strong><\/p>\n<p>Baraj\u0131n maksimum rezervuar hacmi 60,69 hm3, g\u00f6vdenin dolgu hacmi ise 5.027.000 m3 olacak. Narl\u0131 HES\u2019in dizayn\u0131 ise 2&#215;36.250 MW+1&#215;2.500 MW olacak. HES dizayn\u0131nda herbiri Francis-d\u00fc\u015fey eksenli 3 adet t\u00fcrbin bulunacak.<br \/>\nAksa Enerji`nin 11`i lisansl\u0131 9 `u lisans a\u015famas\u0131nda olan toplam 20 HES projesi bulunuyor. Bunlardan bir adetinin i\u015fletmeye al\u0131nm\u0131\u015f oldu\u011fu belirleniyor.<\/p>\n<p>Kaynak: <a href=\"http:\/\/enerjigunlugu.net\/aksa-enerjiden-vana-75-mwlik-hes-projesi_5740.html\" target=\"_blank\">Enerji G\u00fcnl\u00fc\u011f\u00fc<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Aksa Enerji \u00dcretim A.\u015e.\u2019nin Van\u2019\u0131n \u00c7atak il\u00e7esi Botan \u00c7ay\u0131 havzas\u0131 \u00fczerinde kurmay\u0131 planlad\u0131\u011f\u0131 75 MW g\u00fcc\u00fcndeki Narl\u0131 Baraj\u0131 ve HES Projesi i\u00e7in \u00c7evresel [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":14207,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,47],"tags":[143,10544,2878,4275,63,67,1009,165,18,35370,1090,10545,4224],"views":2053,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/17990"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=17990"}],"version-history":[{"count":2,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/17990\/revisions"}],"predecessor-version":[{"id":17992,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/17990\/revisions\/17992"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/14207"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=17990"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=17990"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=17990"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}