{"id":179777,"date":"2023-10-05T17:32:21","date_gmt":"2023-10-05T14:32:21","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=179777"},"modified":"2023-10-05T17:39:40","modified_gmt":"2023-10-05T14:39:40","slug":"enerjisa-uretim-yenilenebilir-enerji-yatirimlarini-genisletiyor","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/enerjisa-uretim-yenilenebilir-enerji-yatirimlarini-genisletiyor\/","title":{"rendered":"(Turkish) &#8217;Enerjisa \u00dcretim&#8217; Yenilenebilir Enerji Yat\u0131r\u0131mlar\u0131n\u0131 Geni\u015fletiyor"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/179777\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2><strong>Enerjisa \u00dcretim<\/strong><strong>, T\u00fcrkiye&#8217;nin ilk hibrit g\u00fcne\u015f enerjisi santrali yat\u0131r\u0131mlar\u0131ndan biri olan Bal\u0131kesir R\u00fczgar Enerji Santrali\u2019nde kapasite art\u0131\u015f\u0131na giderek 11,88\u00a0MW ek kurulu g\u00fc\u00e7 ile \u00fcretime ba\u015flad\u0131. Yenilenebilir enerji \u00fcretimi hedefleri ve s\u00fcrd\u00fcr\u00fclebilirlik yakla\u015f\u0131m\u0131 \u00e7er\u00e7evesinde yat\u0131r\u0131mlar\u0131n\u0131 s\u00fcrd\u00fcren Enerjisa \u00dcretim, ba\u015fta r\u00fczg\u00e2r ve g\u00fcne\u015f olmak \u00fczere yenilenebilir enerji kaynaklar\u0131na yapt\u0131\u011f\u0131 yat\u0131r\u0131m\u0131 h\u0131zla art\u0131rmaya devam edecek.<\/strong><\/h2>\n<p style=\"text-align: center;\"><img loading=\"lazy\" class=\"aligncenter wp-image-179779\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/10\/enerjisa-uretim-yenilenebilir-enerji-yatirimlarini-genisletiyor.jpg\" alt=\"\" width=\"500\" height=\"375\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/10\/enerjisa-uretim-yenilenebilir-enerji-yatirimlarini-genisletiyor.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/10\/enerjisa-uretim-yenilenebilir-enerji-yatirimlarini-genisletiyor-300x225.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/10\/enerjisa-uretim-yenilenebilir-enerji-yatirimlarini-genisletiyor-500x375.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/10\/enerjisa-uretim-yenilenebilir-enerji-yatirimlarini-genisletiyor-67x50.jpg 67w\" sizes=\"(max-width: 500px) 100vw, 500px\" \/><\/p>\n<p>Enerjisa \u00dcretim, sadece yenilenebilir enerji kaynaklar\u0131na yapaca\u011f\u0131 yat\u0131r\u0131mla 5000 MW kurulu g\u00fc\u00e7 hedefine ula\u015fmak i\u00e7in \u00e7al\u0131\u015fmalar\u0131n\u0131 s\u00fcrd\u00fcr\u00fcyor. <strong>\u00dc\u00e7 y\u0131l<\/strong> i\u00e7inde <strong>en az 150 MW hibrit g\u00fcne\u015f enerjisi santrali yat\u0131r\u0131m\u0131yla<\/strong> hem bu amac\u0131na ula\u015fmay\u0131 hem de T\u00fcrkiye&#8217;nin yenilenebilir enerji kapasitesini \u00f6nemli \u00f6l\u00e7\u00fcde art\u0131rmay\u0131 hedefliyor. <strong>YEKA-2<\/strong> kapsam\u0131nda temiz enerji yat\u0131r\u0131mlar\u0131nda tarihi bir at\u0131l\u0131ma imza atan \u015firket, son olarak <strong>Bal\u0131kesir\u2019de<\/strong> bulunan <strong>Bal\u0131kesir R\u00fczgar Enerji Santrali\u2019nde<\/strong>, halihaz\u0131rda <strong>143 MW<\/strong> kurulu g\u00fc\u00e7le hizmet veren g\u00fcne\u015f enerjisi yat\u0131r\u0131m\u0131n\u0131 <strong>11,88 MW<\/strong>\u2019l\u0131k ek kapasite ile b\u00fcy\u00fctt\u00fc. Bal\u0131kesir R\u00fczgar Enerji Santrali\u2019nde 52 adet r\u00fczg\u00e2r t\u00fcrbini ve 22.200 adet 535 W g\u00fcc\u00fcnde \u00e7ift y\u00fczl\u00fc (bifacial) g\u00fcne\u015f paneli yer al\u0131yor. Y\u0131ll\u0131k 549,2 GWh \u00fcretim kapasitesine sahip r\u00fczg\u00e2r santrali, g\u00fcne\u015f enerjisi santralinin hibrit \u015fekilde hayata ge\u00e7mesi ile toplamda <strong>y\u0131ll\u0131k 568,3 GWh<\/strong> \u00fcretim kapasitesine sahip olacak.<\/p>\n<h3><strong>Hedef yenilenebilir enerjinin pay\u0131n\u0131 % 60\u2019\u0131n \u00fczerine ta\u015f\u0131mak<\/strong><\/h3>\n<p>R\u00fczgar yat\u0131r\u0131mlar\u0131n\u0131 da \u00fc\u00e7 y\u0131l boyunca h\u0131zla art\u0131racak olan Enerjisa \u00dcretim; Bal\u0131kesir RES, \u00c7anakkale RES, Akhisar RES, Erciyes RES ve Da\u011fpazar\u0131 RES gibi faal tesislerin yan\u0131 s\u0131ra YEKA-2 kapsam\u0131nda devreye al\u0131nacak yat\u0131r\u0131mlar\u0131 da \u00fc\u00e7 y\u0131l i\u00e7inde tamamlam\u0131\u015f olacak. Toplam kurulu g\u00fc\u00e7 hedefini 5.000 MW olarak a\u00e7\u0131klayan <strong>Enerjisa \u00dcretim<\/strong>\u2019in CEO\u2019su <strong>\u0130hsan Erbil Bay\u00e7\u00f6l<\/strong>, yenilenebilir enerji alan\u0131ndaki b\u00fcy\u00fcme hedefleri ile ilgili olarak \u015funlar\u0131 aktard\u0131:<\/p>\n<p><em>\u201c1.000 MW\u2019l\u0131k YEKA-2 projelerinin de tamam\u0131n\u0131 \u00fcstlendik. T\u00fcrkiye\u2019nin enerjideki gelecek hedeflerine \u00f6nemli katk\u0131 sunacak bu santraller i\u00e7in <strong>1,2 milyar dolarl\u0131k bir yat\u0131r\u0131m<\/strong> yapt\u0131k. Mevcut \u00fcretimimizin <strong>y\u00fczde 60\u2019ya<\/strong> yak\u0131n\u0131<strong> yenilenebilir kaynaklardan<\/strong> geliyor. Bunu k\u0131sa s\u00fcrede <strong>y\u00fczde 60\u2019\u0131n \u00fczerine<\/strong> \u00e7\u0131karaca\u011f\u0131z. Hedefimiz birka\u00e7 y\u0131l i\u00e7erisinde bu santrallerin \u00e7ok \u00f6nemli bir k\u0131sm\u0131n\u0131 hayata ge\u00e7irmek ve toplam kurulu g\u00fcc\u00fcm\u00fcz\u00fc <strong>5.000 MW<\/strong> \u00fcst\u00fcne ta\u015f\u0131mak.\u201d<\/em><\/p>\n<p><strong>Daha Fazla Bilgi \u0130\u00e7in:<\/strong>\u00a0<a href=\"https:\/\/www.enerjisauretim.com.tr\/\" target=\"_blank\" rel=\"noopener\">https:\/\/www.enerjisauretim.com.tr\/<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Enerjisa \u00dcretim, T\u00fcrkiye&#8217;nin ilk hibrit g\u00fcne\u015f enerjisi santrali yat\u0131r\u0131mlar\u0131ndan biri olan Bal\u0131kesir R\u00fczgar Enerji Santrali\u2019nde kapasite art\u0131\u015f\u0131na giderek 11,88\u00a0MW ek kurulu g\u00fc\u00e7 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":179779,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49,50],"tags":[105388,35365,17465,3504],"views":48,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/179777"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=179777"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/179777\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/179779"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=179777"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=179777"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=179777"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}