{"id":1797,"date":"2012-09-05T09:51:20","date_gmt":"2012-09-05T06:51:20","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=1797"},"modified":"2012-09-05T09:51:20","modified_gmt":"2012-09-05T06:51:20","slug":"armutlu-ruzgarindan-155-milyon-kwh-enerji-uretilecek","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/armutlu-ruzgarindan-155-milyon-kwh-enerji-uretilecek\/","title":{"rendered":"(Turkish) Armutlu R\u00fczgar\u0131ndan 155 Milyon Kwh Enerji \u00dcretilecek"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/1797\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h4>Enerji Piyasas\u0131 D\u00fczenleme Kurulu (EPDK) taraf\u0131ndan lisans verilen Arova Res R\u00fczgar Enerjisinden Elektrik \u00dcretim Santral\u0131 Limited Sirketi Yalova&#8217;n\u0131n Armutlu il\u00e7esinde R\u00fczgar Enerjisi Santrali (RES) kurma haz\u0131rl\u0131klar\u0131n\u0131 s\u00fcrd\u00fcr\u00fcyor.<\/h4>\n<p><img loading=\"lazy\" class=\"alignright size-medium wp-image-1798\" title=\"Armutlu_Ruzgarindan_155_Milyon_Kwh_Enerji_Uretilecek\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2012\/09\/Armutlu_Ruzgarindan_155_Milyon_Kwh_Enerji_Uretilecek-300x225.jpg\" alt=\"\" width=\"300\" height=\"225\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2012\/09\/Armutlu_Ruzgarindan_155_Milyon_Kwh_Enerji_Uretilecek-300x225.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2012\/09\/Armutlu_Ruzgarindan_155_Milyon_Kwh_Enerji_Uretilecek-66x50.jpg 66w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2012\/09\/Armutlu_Ruzgarindan_155_Milyon_Kwh_Enerji_Uretilecek.jpg 336w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>Bu kapsamda projeyi Yalova Valili\u011fine sunan \u015firket i\u00e7in \u00c7ED raporunun gerekli olmad\u0131\u011f\u0131 belirtildi. \u015eirket 49 y\u0131ll\u0131\u011f\u0131na ald\u0131\u011f\u0131 lisansla Armutlu&#8217;da y\u0131ll\u0131k 155 milyon KWH enerji \u00fcretecek.<\/p>\n<p>8 Temmuz 2011 tarihinde 16 ay in\u015faat \u00f6ncesi, 32 ay in\u015faat sonras\u0131 olmak kayd\u0131 ile 49 y\u0131ll\u0131\u011f\u0131na elektrik \u00fcretimi i\u00e7in ba\u015fvuru yapan Arova Res R\u00fczgar Enerjisinden Elektrik \u00dcretim Santral\u0131 Limited \u015eirketi EPDK&#8217;dan Eyl\u00fcl ay\u0131nda lisans alarak \u00e7al\u0131\u015fmalara ba\u015flad\u0131. Bu kapsamda Yalova Valili\u011fi&#8217;ne ba\u015fvuran \u015firketin planlar\u0131nda yap\u0131lan incelemede \u00c7ED Raporuna gerek olmad\u0131\u011f\u0131na karar verildi. R\u00fczgar enerjisi ile elektrik \u00fcretilecek olan tesiste 60 trib\u00fcn yer alacak. Her \u00fcnitede 900 kw enerji \u00fcretiminin ger\u00e7ekle\u015fece\u011fi r\u00fczgar santralinde 60 trib\u00fcnde toplam 54 KWH enerji \u00fcretilecek.<\/p>\n<p>Kaynak: <a href=\"http:\/\/www.yalovamiz.com\/news.php?id=19819&amp;t=Armutlu_R%C3%BCzgar%C4%B1ndan_155_Milyon_Kwh_Enerji_%C3%9Cretilecek\" target=\"_blank\">Yalovamiz.com<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Enerji Piyasas\u0131 D\u00fczenleme Kurulu (EPDK) taraf\u0131ndan lisans verilen Arova Res R\u00fczgar Enerjisinden Elektrik \u00dcretim Santral\u0131 Limited Sirketi Yalova&#8217;n\u0131n Armutlu il\u00e7esinde R\u00fczgar Enerjisi [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":1798,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,50],"tags":[474,233,475],"views":1564,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/1797"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=1797"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/1797\/revisions"}],"predecessor-version":[{"id":1799,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/1797\/revisions\/1799"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/1798"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=1797"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=1797"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=1797"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}