{"id":179431,"date":"2023-09-21T18:02:34","date_gmt":"2023-09-21T15:02:34","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=179431"},"modified":"2023-09-21T18:02:34","modified_gmt":"2023-09-21T15:02:34","slug":"sedas-tan-duzce-de-170-milyon-tl-yatirim-calismasi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/sedas-tan-duzce-de-170-milyon-tl-yatirim-calismasi\/","title":{"rendered":"(Turkish) &#8217;SEDA\u015e&#8217;tan D\u00fczce\u2019de 170 Milyon TL Yat\u0131r\u0131m \u00c7al\u0131\u015fmas\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/179431\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2><strong>SEDA\u015e, D\u00fczce\u2019de y\u0131l sonuna kadar tamamlanmas\u0131 planlanan yat\u0131r\u0131m ve bak\u0131m \u00e7al\u0131\u015fmalar\u0131na aral\u0131ks\u0131z devam ediyor. SEDA\u015e Y\u00f6netim Kurulu ve \u0130cra Ba\u015fkan\u0131 Dr. Necmi Odyakmaz, 170 milyon TL kaynak ayr\u0131lan b\u00f6lgedeki yat\u0131r\u0131mlar\u0131n y\u0131l sonuna kadar tamamlanaca\u011f\u0131n\u0131 a\u00e7\u0131klad\u0131.<\/strong><\/h2>\n<p>20 bin kilometrekarelik alandaki 3,8 milyon n\u00fcfusa hizmet veren Sakarya Elektrik Da\u011f\u0131t\u0131m A.\u015e. (SEDA\u015e), <strong>D\u00fczce\u2019deki yat\u0131r\u0131m \u00e7al\u0131\u015fmalar\u0131na<\/strong> h\u0131z veriyor. Kentteki ihtiya\u00e7lara g\u00f6re haz\u0131rlanan programda bu y\u0131l\u0131n sonuna kadar <strong>kapasite art\u0131r\u0131m\u0131, \u015febeke yenileme ve ana hatlarda devam <img loading=\"lazy\" class=\"alignright wp-image-179434\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/09\/sedas-tan-duzce-de-170-milyon-tl-yatirim-calismasi-1.jpg\" alt=\"\" width=\"320\" height=\"214\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/09\/sedas-tan-duzce-de-170-milyon-tl-yatirim-calismasi-1.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/09\/sedas-tan-duzce-de-170-milyon-tl-yatirim-calismasi-1-300x200.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/09\/sedas-tan-duzce-de-170-milyon-tl-yatirim-calismasi-1-500x334.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/09\/sedas-tan-duzce-de-170-milyon-tl-yatirim-calismasi-1-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/09\/sedas-tan-duzce-de-170-milyon-tl-yatirim-calismasi-1-450x300.jpg 450w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>eden yeralt\u0131 \u00e7al\u0131\u015fmalar\u0131n\u0131n tamamlanmas\u0131<\/strong> planlan\u0131yor. Yat\u0131r\u0131m\u0131n toplam de\u011feri ise <strong>170 milyon TL<\/strong> oldu.<\/p>\n<p><strong>SEDA\u015e Y\u00f6netim Kurulu ve \u0130cra Ba\u015fkan\u0131 Dr. Necmi Odyakmaz<\/strong>, D\u00fczce\u2019deki yat\u0131r\u0131m \u00e7al\u0131\u015fmalar\u0131n\u0131 de\u011ferlendirerek, yat\u0131r\u0131m projelerinin kentteki en g\u00fcncel ihtiya\u00e7lara g\u00f6re haz\u0131rland\u0131\u011f\u0131n\u0131 a\u00e7\u0131klad\u0131. Odyakmaz,<em> \u201cAltyap\u0131, bak\u0131m, yenileme ve onar\u0131m \u00e7al\u0131\u015fmalar\u0131m\u0131za D\u00fczce b\u00f6lgemizde aral\u0131ks\u0131z \u015fekilde devam ediyoruz. Katma de\u011ferli yat\u0131r\u0131m planlar\u0131m\u0131zla m\u00fc\u015fteri memnuniyetini her ge\u00e7en g\u00fcn art\u0131rarak, operasyonel faaliyetlerimizi daha da g\u00fc\u00e7lendirmeyi hedefliyoruz\u201d<\/em> dedi.<\/p>\n<p>Saha ekiplerinin D\u00fczce genelinde y\u00fcr\u00fctt\u00fc\u011f\u00fc kapsaml\u0131 \u00e7al\u0131\u015fmalarla <strong>300 kilometreyi a\u015fk\u0131n<\/strong> kablo-iletken \u00e7ekimi ve <strong>6 bin adet direk montaj\u0131<\/strong> ger\u00e7ekle\u015ftirildi. Y\u0131l sonuna kadar k\u00f6yler de dahil olmak \u00fczere ilave <strong>16 adet beton k\u00f6\u015fk tipi trafo<\/strong> ve yakla\u015f\u0131k<strong> 72 adet direk tipi trafo tesisinin<\/strong> devreye al\u0131nmas\u0131 sa\u011flanacak. \u0130\u015f sa\u011fl\u0131\u011f\u0131 ve g\u00fcvenli\u011fi tedbirlerini \u00f6nceliklendiren ekipler, kentin t\u00fcm\u00fcnde <strong>\u015febeke yenileme, yeni alternatif \u015febeke tesisi, kapasite art\u0131\u015f\u0131 ve hatlarda g\u00fcvenlik mesafesi<\/strong> d\u00fczenlemesi gibi \u00e7al\u0131\u015fmalara devam ediyor.<\/p>\n<p>Elektrik hizmetinde s\u00fcreklili\u011fi sa\u011flamay\u0131 ve kentte artan enerji talebini kar\u015f\u0131lamay\u0131 hedefleyen \u00e7al\u0131\u015fmalar\u0131n enerjili hatta yap\u0131labilmesinin m\u00fcmk\u00fcn olmamas\u0131 nedeniyle<strong> planl\u0131 kesintilere<\/strong> ba\u015fvuruluyor. M\u00fc\u015fterilerin elektrik ihtiyac\u0131n\u0131 kar\u015f\u0131lamak ad\u0131na zorunluluk ta\u015f\u0131yan planl\u0131 kesintilerde, <strong>can ve mal g\u00fcvenli\u011fini koruyabilmek<\/strong> i\u00e7in hatlardaki <strong>enerji devre d\u0131\u015f\u0131 b\u0131rak\u0131larak<\/strong> \u00f6nceden belirtilen s\u00fcre \u00e7er\u00e7evesinde <strong>planl\u0131 elektrik kesintisi<\/strong> ger\u00e7ekle\u015ftiriliyor. Bu sayede, <strong>yat\u0131r\u0131m<\/strong> ve <strong>bak\u0131m<\/strong> i\u015flemlerinin <strong>emniyetli bi\u00e7imde<\/strong> yap\u0131labilirken, <strong>\u015febekelerde de teknik s\u00fcrd\u00fcr\u00fclebilirlik<\/strong> sa\u011flan\u0131yor.<\/p>\n<p>Teknik ve d\u0131\u015f etmenlerden kaynakl\u0131 kesintilerin \u00f6n\u00fcne ge\u00e7ebilmek i\u00e7in yap\u0131lan \u00e7al\u0131\u015fmalarda planl\u0131 kesinti yap\u0131lacak b\u00f6lgelerin isimleri, 48 saat \u00f6nceden SEDA\u015e web sitesinden duyuruluyor. Ayr\u0131ca, m\u00fc\u015fteriler sistemde kay\u0131tl\u0131 bulunan <strong>telefon numaralar\u0131na SMS<\/strong> g\u00f6nderilerek bilgilendiriliyor.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. SEDA\u015e, D\u00fczce\u2019de y\u0131l sonuna kadar tamamlanmas\u0131 planlanan yat\u0131r\u0131m ve bak\u0131m \u00e7al\u0131\u015fmalar\u0131na aral\u0131ks\u0131z devam ediyor. SEDA\u015e Y\u00f6netim Kurulu ve \u0130cra Ba\u015fkan\u0131 Dr. Necmi [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":179433,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53],"tags":[29819,102600,34604,2444,110437],"views":32,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/179431"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=179431"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/179431\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/179433"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=179431"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=179431"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=179431"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}