{"id":179174,"date":"2023-09-12T16:44:55","date_gmt":"2023-09-12T13:44:55","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=179174"},"modified":"2023-09-12T16:44:55","modified_gmt":"2023-09-12T13:44:55","slug":"dev-ruzgar-turbini-bir-gunde-170-bin-haneye-yetecek-elektrik-uretti","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/dev-ruzgar-turbini-bir-gunde-170-bin-haneye-yetecek-elektrik-uretti\/","title":{"rendered":"(Turkish) &#8217;Dev R\u00fczgar T\u00fcrbini&#8217; Bir G\u00fcnde 170 Bin Haneye Yetecek Elektrik \u00dcretti"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/179174\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2 class=\"c-article-summary\">Goldwind GWH252-16MW 252 metre \u00e7ap\u0131na sahip ve yakla\u015f\u0131k 2.5 futbol sahas\u0131 b\u00fcy\u00fckl\u00fc\u011f\u00fcnde. Devasa r\u00fczgar t\u00fcrbininin pervaneleri ses h\u0131z\u0131n\u0131n \u00fc\u00e7te iki h\u0131z\u0131na ula\u015fabiliyor. D\u00fcnyan\u0131n en b\u00fcy\u00fck r\u00fczgar t\u00fcrbininden bir g\u00fcnde elde edilen elektrik miktar\u0131 rekor k\u0131rarak s\u00fcrd\u00fcr\u00fclebilir enerjide yeni bir \u00e7\u0131\u011f\u0131r a\u00e7t\u0131.<\/h2>\n<div class=\"c-article-content js-article-content \">\n<p>\u00c7in\u2019in Fuciyen (Fujian) eyaletinde bulunan deniz \u00fcst\u00fcnde kurulu\u00a0<strong>Goldwind GWH252-16MW<\/strong> adl\u0131 devasa r\u00fczgar t\u00fcrbini, b\u00f6lgede etkili olan <strong>sert r\u00fczgar<\/strong> ve <strong>tayfun<\/strong> sayesinde <strong>24 saat<\/strong> i\u00e7erisinde<strong> 384.1 <img loading=\"lazy\" class=\"alignright wp-image-179176\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/09\/dev-ruzgar-turbini-bir-gunde-170-bin-haneye-yetecek-elektrik-uretti.jpg\" alt=\"\" width=\"320\" height=\"209\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/09\/dev-ruzgar-turbini-bir-gunde-170-bin-haneye-yetecek-elektrik-uretti.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/09\/dev-ruzgar-turbini-bir-gunde-170-bin-haneye-yetecek-elektrik-uretti-300x196.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/09\/dev-ruzgar-turbini-bir-gunde-170-bin-haneye-yetecek-elektrik-uretti-500x327.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/09\/dev-ruzgar-turbini-bir-gunde-170-bin-haneye-yetecek-elektrik-uretti-76x50.jpg 76w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>megavat (MWh) saat<\/strong> elektrik elde etti.<\/p>\n<p>252 metre boyundaki dev mamut t\u00fcrbini bu alanda d\u00fcnya rekoru k\u0131rarken elde edilen elektri\u011fin <strong>170 bin hane eve<\/strong>, <strong>38 milyon LED lambas\u0131na<\/strong> ve ortalama <strong>bir elektrikli araban\u0131n 2.2 milyon kilometre gidebilmesine<\/strong> yetecek miktarda oldu\u011fu kaydedildi.<\/p>\n<p>\u00c7in, 2021 y\u0131l\u0131nda r\u00fczgar t\u00fcrbinlerine b\u00fcy\u00fck yat\u0131r\u0131m yapt\u0131 ve bu alanda t\u00fcm \u00fclkeleri geride b\u0131rakt\u0131. Son 5 seneye bak\u0131ld\u0131\u011f\u0131nda da \u00c7in\u2019in bu enerji alan\u0131na yapt\u0131\u011f\u0131 yat\u0131r\u0131m d\u00fcnyan\u0131n geri kalan \u00fclkelerinden \u00e7ok daha fazla.<\/p>\n<p>\u00c7in sadece 2022 y\u0131l\u0131nda t\u00fcm d\u00fcnyadaki toplam<strong> 64.4 megavat saat<\/strong> <strong>deniz kenar\u0131 (\u00fcst\u00fc) r\u00fczgar t\u00fcrbini<\/strong> kapasitesinin yakla\u015f\u0131k yar\u0131s\u0131na bizzat kendisi yat\u0131r\u0131m yapt\u0131. Teknoloji devi \u00c7in bu alanda Avrupa\u2019da yap\u0131lan <strong>y\u00fczde 47\u2019lik<\/strong> yat\u0131r\u0131m\u0131 da geride b\u0131rakm\u0131\u015f oldu.<\/p>\n<p><strong>\u00c7in<\/strong> ayr\u0131ca d\u00fcnyan\u0131n <strong>en b\u00fcy\u00fck r\u00fczgar t\u00fcrbini \u00e7iftli\u011fini de<\/strong> kurmay\u0131 ama\u00e7l\u0131yor. Bu \u00e7iftlik o kadar b\u00fcy\u00fck ki, <strong>bir senede elde edece\u011fi elektrik miktar\u0131 Norve\u00e7\u2019in bir y\u0131ll\u0131k ihtiyac\u0131n\u0131 kar\u015f\u0131layacak kapasitede<\/strong> olacak. S\u00f6z konusu dev projenin <strong>2025\u2019ten \u00f6nce ba\u015flamas\u0131<\/strong> d\u00fc\u015f\u00fcn\u00fcl\u00fcyor.<\/p>\n<p>Kaynak:\u00a0<a href=\"https:\/\/tr.euronews.com\/green\/2023\/09\/08\/dev-ruzgar-turbini-dunya-rekoru-kirdi-bir-gunde-170-bin-haneye-yetecek-elektrik-uretti\" target=\"_blank\" rel=\"noopener\" data-wpel-link=\"external\">Euronews<\/a><\/p>\n<\/div>\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Goldwind GWH252-16MW 252 metre \u00e7ap\u0131na sahip ve yakla\u015f\u0131k 2.5 futbol sahas\u0131 b\u00fcy\u00fckl\u00fc\u011f\u00fcnde. Devasa r\u00fczgar t\u00fcrbininin pervaneleri ses h\u0131z\u0131n\u0131n \u00fc\u00e7te iki h\u0131z\u0131na ula\u015fabiliyor. [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":179176,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,50],"tags":[110677,110676,474,324],"views":102,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/179174"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=179174"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/179174\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/179176"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=179174"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=179174"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=179174"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}