{"id":179097,"date":"2023-09-08T16:16:07","date_gmt":"2023-09-08T13:16:07","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=179097"},"modified":"2023-09-08T16:16:29","modified_gmt":"2023-09-08T13:16:29","slug":"bagyurdu-osb-16-mw-lik-ges-le-enerjisini-gunesten-alacak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/bagyurdu-osb-16-mw-lik-ges-le-enerjisini-gunesten-alacak\/","title":{"rendered":"(Turkish) &#8217;Ba\u011fyurdu OSB&#8217; 1,6 MW\u2019l\u0131k GES\u2019le Enerjisini G\u00fcne\u015ften Alacak"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/179097\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2><strong>Ye\u015fil OSB olma yolunda ilerleyen Ba\u011fyurdu Organize Sanayi B\u00f6lgesi (BAYOSB), G\u00fcne\u015f Enerji Santrali (GES) yat\u0131r\u0131m\u0131 i\u00e7in Power Elektronik ve Power Solar ile s\u00f6zle\u015fme imzalad\u0131. BAYOSB Ba\u015fkan\u0131 Ayd\u0131n Telseren, \u201cProje kapsam\u0131nda 1,6 MW g\u00fcc\u00fcne sahip GES kurarak OSB\u2019nin \u00f6z t\u00fcketim ihtiya\u00e7lar\u0131n\u0131 yenilenebilir enerji ile kar\u015f\u0131layaca\u011f\u0131z\u201d dedi.<\/strong><\/h2>\n<p style=\"text-align: center;\"><img loading=\"lazy\" class=\"aligncenter wp-image-179100\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/09\/bagyurdu-osb-16-mw-lik-ges-le-enerjisini-gunesten-alacak.jpeg\" alt=\"\" width=\"500\" height=\"279\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/09\/bagyurdu-osb-16-mw-lik-ges-le-enerjisini-gunesten-alacak.jpeg 736w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/09\/bagyurdu-osb-16-mw-lik-ges-le-enerjisini-gunesten-alacak-300x168.jpeg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/09\/bagyurdu-osb-16-mw-lik-ges-le-enerjisini-gunesten-alacak-500x279.jpeg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/09\/bagyurdu-osb-16-mw-lik-ges-le-enerjisini-gunesten-alacak-80x45.jpeg 80w\" sizes=\"(max-width: 500px) 100vw, 500px\" \/><\/p>\n<p>Ba\u011fyurdu Organize Sanayi B\u00f6lgesi (BAYOSB) Ye\u015fil OSB olma yolunda yenilenebilir enerji yat\u0131r\u0131mlar\u0131na devam ediyor. G\u00fcne\u015f Enerji Santrali (GES) projesine ba\u015flayan BAYOSB, GES s\u00f6zle\u015fmesinin imzalar\u0131n\u0131 Sanayi ve Teknoloji Bakanl\u0131\u011f\u0131\u2019nda att\u0131.<\/p>\n<p>\u0130haleyi Ferhat Emanet ve Vedat Emanet\u2019in yetkilisi oldu\u011fu <strong>Power Elektronik ve Power Solar Elektronik \u00dcretim Ortak Giri\u015fimi<\/strong> kazan\u0131rken, s\u00f6zle\u015fme imzas\u0131n\u0131 <strong>Sanayi B\u00f6lgeleri Genel M\u00fcd\u00fcr\u00fc Fatih Turan<\/strong> g\u00f6zetiminde <strong>BAYOSB B\u00f6lge M\u00fcd\u00fcr\u00fc Figen Akdemir<\/strong>, <strong>Power Solar Enerji Elektronik \u00dcretim A.\u015e. Ortak Giri\u015fimi Yetkilileri<\/strong> ile birlikte att\u0131.<\/p>\n<h3><strong>Elektrikli ara\u00e7lara h\u0131zl\u0131 \u015farj istasyonu<\/strong><\/h3>\n<p>D\u00fcnya Bankas\u0131 projesi kapsam\u0131nda ve Sanayi ve Teknoloji Bakanl\u0131\u011f\u0131 y\u00fcr\u00fct\u00fcc\u00fcl\u00fc\u011f\u00fcnde GES\u2019in yap\u0131laca\u011f\u0131n\u0131 s\u00f6yleyen BAYOSB Y\u00f6netim Kurulu Ba\u015fkan\u0131 Ayd\u0131n Telseren, <strong>y\u0131l sonuna kadar GES\u2019i tamamlamay\u0131 hedeflediklerini s\u00f6yledi.<\/strong><\/p>\n<p>Ye\u015fil OSB misyonuna uygun ad\u0131mlar\u0131 kararl\u0131l\u0131kla atmaya devam ettiklerini dile getiren Telseren, <em>\u201cD\u00fcnya Bankas\u0131\u2019dan bu yat\u0131r\u0131m\u0131m\u0131z i\u00e7in destek ald\u0131k. \u0130hale ve s\u00f6zle\u015fme a\u015famas\u0131n\u0131 tamamlad\u0131k. Proje kapsam\u0131nda; <strong>1,6 MW<\/strong> g\u00fcc\u00fcne sahip g\u00fcne\u015f enerji santralini kurarak OSB\u2019nin \u00f6z t\u00fcketim ihtiya\u00e7lar\u0131n\u0131 yenilenebilir enerji ile kar\u015f\u0131layaca\u011f\u0131z ayr\u0131ca b\u00f6lge <strong>otoparklar\u0131ndan bir tanesine<\/strong> elektrikli ara\u00e7lar i\u00e7in <strong>h\u0131zl\u0131 \u015farj istasyonu<\/strong> kuraca\u011f\u0131z\u201d<\/em> dedi.<\/p>\n<p>T\u00fcrkiye\u2019de Sanayi ve Teknoloji Bakanl\u0131\u011f\u0131\u2019n\u0131n y\u00fcr\u00fct\u00fcc\u00fcs\u00fc oldu\u011fu D\u00fcnya Bankas\u0131 Finansmanl\u0131 OSB kredilendirme Projesi\u2019nin ilk ihalesi oldu\u011funun alt\u0131n\u0131 \u00e7izen Telseren, <em>\u201c1,6 MW kapasiteli GES\u2019in i\u015f teslim s\u00fcresi <strong>6 ay<\/strong>. Y\u0131l sonuna kadar GES\u2019i devreye alarak kendi enerji ihtiyac\u0131m\u0131z\u0131 buradan kar\u015f\u0131layaca\u011f\u0131z. Ye\u015fil OSB s\u00f6z\u00fcn\u00fcn alt\u0131n\u0131 doldurmaya, AB Ye\u015fil Mutabakat\u0131 kapsam\u0131nda kat\u0131l\u0131mc\u0131 firmalar\u0131m\u0131z\u0131n elini kolayla\u015ft\u0131rmaya devam ediyoruz. <strong>GES projemiz tamamland\u0131ktan<\/strong> sonra <strong>ye\u015fil idari bina projemize<\/strong> ba\u015flamay\u0131 hedefliyoruz\u201d<\/em> dedi.<\/p>\n<p>Kaynak: D\u00fcnya<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Ye\u015fil OSB olma yolunda ilerleyen Ba\u011fyurdu Organize Sanayi B\u00f6lgesi (BAYOSB), G\u00fcne\u015f Enerji Santrali (GES) yat\u0131r\u0131m\u0131 i\u00e7in Power Elektronik ve Power Solar ile [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":179100,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49],"tags":[110649,110651,110648,29013,8733,110650,110647,64921],"views":33,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/179097"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=179097"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/179097\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/179100"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=179097"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=179097"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=179097"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}