{"id":178717,"date":"2023-08-30T13:16:02","date_gmt":"2023-08-30T10:16:02","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=178717"},"modified":"2023-08-30T13:16:22","modified_gmt":"2023-08-30T10:16:22","slug":"astor-enerji-agustos-ayinda-8-yeni-anlasmaya-imza-atti","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/astor-enerji-agustos-ayinda-8-yeni-anlasmaya-imza-atti\/","title":{"rendered":"(Turkish) &#8217;Astor Enerji&#8217; A\u011fustos Ay\u0131nda 8 Yeni Anla\u015fmaya \u0130mza Att\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/178717\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2><strong>Astor Enerji A.\u015e., Kamuyu Ayd\u0131nlatma Platformu\u2019na (KAP) A\u011fustos ay\u0131 yeni i\u015f ili\u015fkileri hakk\u0131nda a\u00e7\u0131klama yapt\u0131. Yap\u0131lan son a\u00e7\u0131klamada, Kontrolmatik Teknoloji Enerji ve M\u00fchendislik ile 9.467.700 milyon dolar de\u011ferinde 3 ayr\u0131 s\u00f6zle\u015fme imzaland\u0131\u011f\u0131 bildirildi.<\/strong><\/h2>\n<p style=\"text-align: center;\"><img loading=\"lazy\" class=\"aligncenter wp-image-178719\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/08\/astor-enerji-agustos-ayinda-8-yeni-anlasmaya-imza-atti.jpg\" alt=\"\" width=\"500\" height=\"326\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/08\/astor-enerji-agustos-ayinda-8-yeni-anlasmaya-imza-atti.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/08\/astor-enerji-agustos-ayinda-8-yeni-anlasmaya-imza-atti-300x196.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/08\/astor-enerji-agustos-ayinda-8-yeni-anlasmaya-imza-atti-500x326.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/08\/astor-enerji-agustos-ayinda-8-yeni-anlasmaya-imza-atti-77x50.jpg 77w\" sizes=\"(max-width: 500px) 100vw, 500px\" \/><\/p>\n<p><strong>Astor Enerji A.\u015e. taraf\u0131ndan yap\u0131lan 8 yeni anla\u015fma i\u00e7in Kamuyu Ayd\u0131nlatma Platformu\u2019 na (KAP) yap\u0131lan a\u00e7\u0131klama \u015f\u00f6yle:<\/strong><\/p>\n<p>\u015eirket<strong>,\u00a0<\/strong>04.08.2023 tarihli duyurusunda\u00a0<strong>Irak\u2019ta\u00a0<\/strong>yerle\u015fik bir firma ile 14.542.500.- USD tutarl\u0131 bir sipari\u015f s\u00f6zle\u015fmesi yapt\u0131\u011f\u0131n\u0131 bildirirken, 29.08.2023 tarihinde yapt\u0131\u011f\u0131 son KAP duyurusu ile\u00a0<strong>\u0130talya&#8217;da<\/strong> yerle\u015fik \u00f6zel bir firma ile 555.750 EURO tutar\u0131nda <strong>ilk g\u00fc\u00e7 transformat\u00f6r\u00fc sat\u0131\u015f s\u00f6zle\u015fmesi<\/strong> imzalad\u0131\u011f\u0131n\u0131 duyurdu.<\/p>\n<h3><strong>ENERJ\u0130 DEV\u0130NDEN M\u0130LYON DOLARLIK YEN\u0130 ANLA\u015eMA<\/strong><\/h3>\n<p><strong>Yurt i\u00e7inde ger\u00e7ekle\u015ftirilen i\u015f s\u00f6zle\u015fmeleri hakk\u0131nda yap\u0131lan a\u00e7\u0131klamada<\/strong>; Kontrolmatik Teknoloji Enerji ve M\u00fchendislik ile 9.467.700 milyon dolar de\u011ferinde 3 ayr\u0131 s\u00f6zle\u015fme imzaland\u0131\u011f\u0131 bildirildi. \u015eirket, Kontrolmatik Teknoloji Enerji ve M\u00fchendislik A.\u015e. ile 25.08.2023 tarihinde 3 ayr\u0131 s\u00f6zle\u015fme kapsam\u0131nda 9.467.700-USD kar\u015f\u0131l\u0131\u011f\u0131 251.603.180.- T\u00fcrk Liras\u0131 tutar\u0131nda <strong>G\u00fc\u00e7 Transformat\u00f6r\u00fc<\/strong> sat\u0131\u015f s\u00f6zle\u015fmesi imzalad\u0131\u011f\u0131n\u0131 duyurdu. Yap\u0131lan s\u00f6zle\u015fmenin 2022 y\u0131l\u0131 has\u0131lata oran\u0131 y\u00fczde 3,40 olarak belirtildi. Ayr\u0131ca <strong>Aldo Enerji ile Orta Gerilim Da\u011f\u0131t\u0131m Transformat\u00f6rleri ve Anahtarlama \u00fcr\u00fcnleri al\u0131m\u0131 konusunda toplamda 5.000.000 USD tutar\u0131nda s\u00f6zle\u015fme imzaland\u0131<\/strong>.<\/p>\n<p><strong>Astor Enerji A.\u015e., \u0130spanya&#8217;da yerle\u015fik \u00f6zel iki firma ile 25.08.2023 tarihinde iki ayr\u0131 s\u00f6zle\u015fme<\/strong>\u00a0<strong>imzalad\u0131.<\/strong> G\u00fc\u00e7 trafosu sat\u0131\u015f s\u00f6zle\u015fmesi oldu\u011fu bildirilen i\u015flemleri tutar\u0131 s\u0131ras\u0131yla <strong>1.654.000 EURO<\/strong> ve<strong> 5.600.000 EURO<\/strong> olmak \u00fczere toplam <strong>7.254.000 EURO<\/strong> olarak duyuruldu.<\/p>\n<p>A\u011fustos ay\u0131 i\u00e7erisinde kamuoyu ve yat\u0131r\u0131mc\u0131lar\u0131 bilgilendirmek \u00fczere yap\u0131lan a\u00e7\u0131klamada yer alan bir di\u011fer yeni i\u015f ili\u015fkisi ise; <strong>ABD&#8217;de yerle\u015fik \u00f6zel bir firma ile 3.150.000 USD tutar\u0131nda USAID Enerji Koruma Projesi kapsam\u0131nda Ukrayna&#8217;da kullan\u0131lmak \u00fczere G\u00fc\u00e7 Transformat\u00f6r\u00fc<\/strong> sat\u0131\u015f s\u00f6zle\u015fmesinin imzaland\u0131\u011f\u0131 olarak belirtildi.<\/p>\n<p><strong>Finlandiya&#8217;da<\/strong>\u00a0yerle\u015fik \u00f6zel bir firma ile A\u011fustos ay\u0131nda yap\u0131lan toplam <strong>1.260.000 EURO<\/strong> tutar\u0131nda <strong>ilk g\u00fc\u00e7 transformat\u00f6r\u00fc sat\u0131\u015f s\u00f6zle\u015fmesi<\/strong> imzaland\u0131\u011f\u0131 a\u00e7\u0131kland\u0131.<\/p>\n<p>\u015eirketin 2023 y\u0131l\u0131 sat\u0131\u015f hedefi <strong>540 Milyon USD<\/strong> olarak kamuoyu ile payla\u015f\u0131lm\u0131\u015ft\u0131. <strong>A\u011fustos ay\u0131nda duyurusu yap\u0131lan sipari\u015f s\u00f6zle\u015fmeleri toplam\u0131n\u0131n ABD Dolar\u0131 kar\u015f\u0131l\u0131\u011f\u0131 42.024.130 USD oldu.<\/strong><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Astor Enerji A.\u015e., Kamuyu Ayd\u0131nlatma Platformu\u2019na (KAP) A\u011fustos ay\u0131 yeni i\u015f ili\u015fkileri hakk\u0131nda a\u00e7\u0131klama yapt\u0131. Yap\u0131lan son a\u00e7\u0131klamada, Kontrolmatik Teknoloji Enerji ve [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":178719,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53],"tags":[110516,11639,105217,16538,5436,110517],"views":41,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/178717"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=178717"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/178717\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/178719"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=178717"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=178717"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=178717"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}